Circuito PIZA102

Distribuidora EdeSur - Provincia Peravia


Mes-Año Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24 May24 Abr24
Clasificación D D A B A A B A A A A A
Clientes 3744 3771 3785 3769 3788 3794 3792 3790 3780 3769 3766 3778
% Nivel Cobranza 77.93% 74.22% 70.77% 95.72% 85.78% 77.61% 74.29% 75.75% 77.93% 74.12% 79.87% 88.81%
% Nivel Pérdida 60.99% 51.35% 48.95% 60.44% 53.73% 57.95% 57.07% 61.08% 59.14% 56.07% 58.12% 52.29%
Energía Suministrada (GWh) 1.65 1.34 1.45 1.55 1.47 1.87 1.82 1.92 1.78 1.67 1.63 1.49
Energía Facturada (GWh) 0.64 0.65 0.74 0.61 0.68 0.79 0.78 0.75 0.73 0.73 0.68 0.71
Energía Cobrada (GWh) 0.5 0.48 0.52 0.59 0.58 0.61 0.58 0.57 0.57 0.54 0.55 0.63
% Servicio 97.32% 94.90% 91.78% 97.99% 97.26% 97.43% 96.39% 98.57% 98.62% 98.71% 98.34% 97.69%
% Sin Servicio 2.68% 5.10% 8.22% 2.01% 2.74% 2.57% 3.61% 1.43% 1.38% 1.29% 1.66% 2.31%
Interrupción Programada (Hrs) 12.00 21.00 40.00 9.00 12.00 6.00 12.00 6.00 0.00 3.00 6.00 9.00
Interrupción Ejecutada (Hrs) 19.56 37.23 59.97 14.65 20.01 18.79 26.38 10.45 10.05 9.45 12.10 16.83
Promedio Interrupción Diarias (Hrs) 0.64 1.22 1.97 0.48 0.66 0.62 0.87 0.34 0.33 0.31 0.40 0.55
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Catalina, Carretón, Los Roches, Sabana Larga y el Acueducto Múltiple de la Provincia Peravia, Pizarrete, Roblegal, Juan de Sena, Las Barias Parcial.