Circuito PIZA102

Distribuidora EdeSur - Provincia Peravia


Mes-Año Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25
Clasificación D D D D D D D B C D D D
Clientes 3684 3675 3675 3696 3702 3698 3703 3707 3724 3734 3744 3771
% Nivel Cobranza 0.00% 0.00% 82.07% 83.10% 77.24% 74.76% 78.02% 86.38% 76.97% 69.75% 77.93% 74.22%
% Nivel Pérdida 0.00% 0.00% 58.72% 59.34% 59.08% 62.82% 63.32% 60.03% 60.58% 57.47% 60.99% 51.35%
Energía Suministrada (GWh) 0 0 1.64 1.84 1.93 2.06 1.98 1.77 1.81 1.62 1.65 1.34
Energía Facturada (GWh) 0 0 0.68 0.75 0.79 0.77 0.73 0.71 0.71 0.69 0.64 0.65
Energía Cobrada (GWh) 0 0 0.56 0.62 0.61 0.57 0.57 0.61 0.55 0.48 0.5 0.48
% Servicio 99.10% 97.94% 95.12% 96.57% 98.25% 97.38% 97.45% 96.92% 97.09% 96.91% 97.32% 94.90%
% Sin Servicio 0.90% 2.06% 4.88% 3.43% 1.75% 2.62% 2.55% 3.08% 2.91% 3.09% 2.68% 5.10%
Interrupción Programada (Hrs) 3.00 12.00 16.00 15.00 20.00 8.00 10.00 12.00 12.00 15.00 12.00 21.00
Interrupción Ejecutada (Hrs) 6.47 15.34 35.62 25.02 12.76 19.16 18.64 22.50 21.22 22.53 19.56 37.23
Promedio Interrupción Diarias (Hrs) 0.21 0.50 1.17 0.82 0.42 0.63 0.61 0.74 0.70 0.74 0.64 1.22
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Catalina, Carretón, Los Roches, Sabana Larga y el Acueducto Múltiple de la Provincia Peravia, Pizarrete, Roblegal, Juan de Sena, Las Barias Parcial.