Circuito PINO401

Distribuidora EdeNorte - Provincia Dajabon


Mes-Año May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24
Clasificación B B B B B B B B B B B A
Clientes 1786 1786 1765 1759 1749 1758 1758 1760 1751 1748 1726 0
% Nivel Cobranza 0.00% 102.31% 95.67% 85.19% 136.36% 79.81% 1.31% 76.99% 116.53% 79.62% 86.57% 81.81%
% Nivel Pérdida 0.00% 6.89% 14.91% 3.93% 38.01% -6.35% 10.91% 1.03% 6.36% 11.25% 15.25% 12.56%
Energía Suministrada (GWh) 0 0.38 0.4 0.35 0.38 0.38 0.41 0.45 0.43 0.47 0.45 0.42
Energía Facturada (GWh) 0 0.35 0.34 0.34 0.23 0.4 0.36 0.44 0.41 0.42 0.38 0.37
Energía Cobrada (GWh) 0 0.36 0.33 0.29 0.32 0.32 0 0.34 0.47 0.33 0.33 0.3
% Servicio 99.64% 99.95% 98.92% 99.91% 99.85% 99.12% 98.76% 99.16% 98.73% 99.08% 98.44% 0.00%
% Sin Servicio 0.36% 0.05% 1.08% 0.09% 0.15% 0.88% 1.24% 0.84% 1.27% 0.92% 1.56% 0.00%
Interrupción Programada (Hrs) 0.00 0.00 4.00 0.00 0.00 4.00 0.00 5.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 2.62 0.40 7.89 0.65 1.09 6.45 9.06 6.13 9.25 6.75 11.39 0.00
Promedio Interrupción Diarias (Hrs) 0.09 0.01 0.26 0.02 0.04 0.21 0.30 0.20 0.30 0.22 0.37 0.00
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

El Pino, Acueducto Hinaje, El Fango, Los Compos, El Rodeo.