Circuito PINO401

Distribuidora EdeNorte - Provincia Dajabon


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación B B B B B B B B B B B B
Clientes 1827 1827 1821 1817 1816 1813 1814 1813 1813 1813 1804 1801
% Nivel Cobranza 0.00% 88.30% 84.18% 92.98% 93.36% 83.79% 99.29% 90.26% 96.68% 94.74% 88.39% 87.18%
% Nivel Pérdida 0.00% 25.39% 4.91% 19.18% 0.80% 8.23% 18.82% 10.24% 11.11% 6.74% 10.98% 8.26%
Energía Suministrada (GWh) 0 0.45 0.38 0.39 0.34 0.39 0.4 0.39 0.42 0.42 0.45 0.44
Energía Facturada (GWh) 0 0.34 0.36 0.32 0.33 0.35 0.33 0.35 0.37 0.39 0.4 0.41
Energía Cobrada (GWh) 0 0.3 0.3 0.3 0.31 0.3 0.32 0.32 0.36 0.37 0.35 0.36
% Servicio 99.96% 98.83% 99.30% 99.30% 97.75% 99.90% 99.29% 97.66% 99.07% 99.05% 97.27% 97.74%
% Sin Servicio 0.04% 1.17% 0.70% 0.70% 2.25% 0.10% 0.71% 2.34% 0.93% 0.95% 2.73% 2.26%
Interrupción Programada (Hrs) 0.00 5.00 0.00 5.00 7.00 0.00 5.00 5.00 0.00 5.00 0.00 8.00
Interrupción Ejecutada (Hrs) 0.31 8.43 5.07 5.05 16.20 0.74 5.29 17.07 6.82 6.96 19.90 16.51
Promedio Interrupción Diarias (Hrs) 0.01 0.28 0.17 0.17 0.53 0.02 0.17 0.56 0.22 0.23 0.65 0.54
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito PINO401
Interrupciones Programadas 0
Interrupciones Ejecutadas 0.13
% Ejecución Operativa 0%
Detalle de Salidas - Circuito PINO401
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
03/07/2026 Ejecutada 18:30:24 18:34:50 0.07 DISPARO DESCONOCIDO 34.5 KV
27/06/2026 Ejecutada 11:21:59 11:25:27 0.06 FALTA DE TENSION 34.5 KV
El Pino, Acueducto Hinaje, El Fango, Los Compos, El Rodeo.