Circuito PIME101MER
Distribuidora EdeNorte - Provincia Duarte
Mes-Año | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 | Sep24 | Ago24 | Jul24 | Jun24 | May24 |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Clasificación | C | C | C | C | C | C | C | C | C | C | C | C |
Clientes | 2295 | 2295 | 2288 | 2445 | 2318 | 2318 | 2364 | 2344 | 2355 | 2384 | 0 | 2350 |
% Nivel Cobranza | 0.00% | 107.88% | 73.60% | 92.16% | 88.76% | 0.61% | 77.19% | 105.17% | 87.54% | 86.71% | 94.04% | 94.17% |
% Nivel Pérdida | 0.00% | 39.85% | 23.59% | 30.73% | 40.57% | 29.52% | 30.94% | 32.16% | 28.79% | 35.00% | 33.90% | 31.87% |
Energía Suministrada (GWh) | 0 | 0.7 | 0.59 | 0.63 | 0.69 | 0.65 | 0.69 | 0.7 | 0.68 | 0.71 | 0.64 | 0.63 |
Energía Facturada (GWh) | 0 | 0.42 | 0.45 | 0.44 | 0.41 | 0.46 | 0.48 | 0.47 | 0.49 | 0.46 | 0.43 | 0.43 |
Energía Cobrada (GWh) | 0 | 0.45 | 0.33 | 0.4 | 0.37 | 0 | 0.37 | 0.5 | 0.43 | 0.4 | 0.4 | 0.4 |
% Servicio | 97.85% | 97.65% | 96.38% | 91.32% | 98.99% | 96.47% | 95.92% | 97.93% | 98.75% | 97.98% | 0.00% | 95.11% |
% Sin Servicio | 2.15% | 2.35% | 3.62% | 8.68% | 1.01% | 3.53% | 4.08% | 2.07% | 1.25% | 2.02% | 0.00% | 4.89% |
Interrupción Programada (Hrs) | 6.00 | 0.00 | 18.00 | 53.00 | 0.00 | 11.00 | 12.00 | 0.00 | 0.00 | 8.00 | 0.00 | 4.00 |
Interrupción Ejecutada (Hrs) | 15.71 | 17.12 | 26.43 | 63.37 | 7.37 | 25.74 | 29.75 | 15.11 | 9.10 | 14.73 | 0.00 | 35.70 |
Promedio Interrupción Diarias (Hrs) | 0.52 | 0.56 | 0.87 | 2.08 | 0.24 | 0.85 | 0.98 | 0.50 | 0.30 | 0.48 | 0.00 | 1.17 |
Matuan , Campeche Abajo , El Babari, Don Miguel, Platanal, Sabana Grande, Juana Díaz 2, Los Cachones, Abrir Ojos, Caobete , La Guazarita, Los Naranjos, Rincón Hondo, Los Llanos, El Fime, Loma Vieja, La Berraza, Callejon Magua, La Jaguita, La Jagua, La Caoba, France, Los Callejones de Castillo, Bloques Cacao.