Circuito PIME101MER

Distribuidora EdeNorte - Provincia Duarte


Mes-Año Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25
Clasificación C C C C C C C C C C C C
Clientes 2285 2285 2285 2285 2272 2261 2278 2268 2276 2294 2295 2288
% Nivel Cobranza 0.00% 0.00% 0.00% 86.62% 79.29% 92.49% 94.99% 84.05% 95.71% 88.87% 107.88% 73.60%
% Nivel Pérdida 0.00% 0.00% 0.00% 36.70% 43.00% 41.93% 41.78% 34.75% 41.89% 34.88% 39.85% 23.59%
Energía Suministrada (GWh) 0 0 0 0.79 0.84 0.83 0.8 0.74 0.75 0.68 0.7 0.59
Energía Facturada (GWh) 0 0 0 0.5 0.48 0.48 0.47 0.48 0.44 0.44 0.42 0.45
Energía Cobrada (GWh) 0 0 0 0.43 0.38 0.44 0.44 0.4 0.42 0.4 0.45 0.33
% Servicio 98.87% 98.69% 95.61% 97.27% 97.01% 94.95% 96.10% 97.34% 98.15% 97.85% 97.65% 96.38%
% Sin Servicio 1.13% 1.31% 4.39% 2.73% 2.99% 5.05% 3.90% 2.66% 1.85% 2.15% 2.35% 3.62%
Interrupción Programada (Hrs) 6.00 0.00 11.00 0.00 6.00 25.00 12.00 6.00 6.00 6.00 0.00 18.00
Interrupción Ejecutada (Hrs) 8.12 9.76 32.02 19.95 21.80 36.83 28.50 19.42 13.50 15.71 17.12 26.43
Promedio Interrupción Diarias (Hrs) 0.27 0.32 1.05 0.66 0.72 1.21 0.94 0.64 0.44 0.52 0.56 0.87
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Matuan , Campeche Abajo , El Babari, Don Miguel, Platanal, Sabana Grande, Juana Díaz 2, Los Cachones, Abrir Ojos, Caobete , La Guazarita, Los Naranjos, Rincón Hondo, Los Llanos, El Fime, Loma Vieja, La Berraza, Callejon Magua, La Jaguita, La Jagua, La Caoba, France, Los Callejones de Castillo, Bloques Cacao.