Circuito PIME101MER

Distribuidora EdeNorte - Provincia Duarte


Mes-Año Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24
Clasificación C C C C C C C C C C C C
Clientes 2272 2261 2278 2268 2276 2294 2295 2288 2445 2318 2318 2364
% Nivel Cobranza 0.00% 92.49% 94.99% 84.05% 95.71% 88.87% 107.88% 73.60% 92.16% 88.76% 0.61% 77.19%
% Nivel Pérdida 0.00% 41.93% 41.78% 34.75% 41.89% 34.88% 39.85% 23.59% 30.73% 40.57% 29.52% 30.94%
Energía Suministrada (GWh) 0 0.83 0.8 0.74 0.75 0.68 0.7 0.59 0.63 0.69 0.65 0.69
Energía Facturada (GWh) 0 0.48 0.47 0.48 0.44 0.44 0.42 0.45 0.44 0.41 0.46 0.48
Energía Cobrada (GWh) 0 0.44 0.44 0.4 0.42 0.4 0.45 0.33 0.4 0.37 0 0.37
% Servicio 97.01% 94.95% 96.10% 97.34% 98.15% 97.85% 97.65% 96.38% 91.32% 98.99% 96.47% 95.92%
% Sin Servicio 2.99% 5.05% 3.90% 2.66% 1.85% 2.15% 2.35% 3.62% 8.68% 1.01% 3.53% 4.08%
Interrupción Programada (Hrs) 6.00 25.00 12.00 6.00 6.00 6.00 0.00 18.00 53.00 0.00 11.00 12.00
Interrupción Ejecutada (Hrs) 21.80 36.83 28.50 19.42 13.50 15.71 17.12 26.43 63.37 7.37 25.74 29.75
Promedio Interrupción Diarias (Hrs) 0.72 1.21 0.94 0.64 0.44 0.52 0.56 0.87 2.08 0.24 0.85 0.98
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Matuan , Campeche Abajo , El Babari, Don Miguel, Platanal, Sabana Grande, Juana Díaz 2, Los Cachones, Abrir Ojos, Caobete , La Guazarita, Los Naranjos, Rincón Hondo, Los Llanos, El Fime, Loma Vieja, La Berraza, Callejon Magua, La Jaguita, La Jagua, La Caoba, France, Los Callejones de Castillo, Bloques Cacao.