Circuito PIME101CUA

Distribuidora EdeNorte - Provincia Duarte


Mes-Año Mar26 Feb26 Ene26 Dic25 May24 Abr24 Oct23 Sep23 Ago23 Jul23 Jun23 May23
Clasificación C C C C C C C C C C C C
Clientes 2643 2643 2664 2655 2408 2408 0 2407 2408 2417 2429 2429
% Nivel Cobranza 0.00% 102.75% 99.00% 115.55% 0.00% 0.00% 90.55% 67.92% 98.39% 85.62% 86.26% 87.44%
% Nivel Pérdida 0.00% 21.43% 20.44% 21.39% 0.00% 0.00% 60.54% 59.69% 60.65% 60.86% 61.18% 63.45%
Energía Suministrada (GWh) 0 0.6 0.67 0.71 0 0 1.08 1.05 1.04 1.09 1.04 1.03
Energía Facturada (GWh) 0 0.47 0.53 0.56 0 0 0.43 0.42 0.41 0.43 0.4 0.38
Energía Cobrada (GWh) 0 0.48 0.53 0.65 0 0 0.39 0.29 0.4 0.37 0.35 0.33
% Servicio 97.11% 97.62% 98.01% 99.78% 95.32% 99.48% 0.00% 94.44% 94.55% 97.86% 94.59% 97.69%
% Sin Servicio 2.89% 2.38% 1.99% 0.22% 4.68% 0.52% 0.00% 5.56% 5.45% 2.14% 5.41% 2.31%
Interrupción Programada (Hrs) 11.00 5.00 12.00 0.00 4.00 0.00 0.00 14.00 6.00 5.00 5.00 0.00
Interrupción Ejecutada (Hrs) 20.82 17.17 14.33 1.67 34.20 3.78 0.00 40.59 39.81 15.62 39.49 16.83
Promedio Interrupción Diarias (Hrs) 0.68 0.56 0.47 0.05 1.12 0.12 0.00 1.33 1.31 0.51 1.30 0.55
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Casa De Alto, La Estancia, Casa Vieja, Pontón, Monte Negro, Chucho Vasquez, El Hato, La Peña Abajo, Buena Vista, Escuela P. Buena Vista, Catalina, Pie De Plata, Loma De Almacey, Demajagual Arriba, El Llano, Demajagual Abajo, Patao, La Vereda Del Demajagual, La Bajada, Las Cabuyas, Callejon De Los Mejia, Quebrada De Los Patos, Escuela Basica San Felipe Arriba, San Felipe Arriba, Alto De Caimito, La Galana, Los Mates, El Burro, Guanabano, Pozo Del Jobo, Ramonal Abajo, Tawike, Ramonal Arriba, Dichoso Arriba, San Felipe Abajo, Los Callejones, Proyecto Los Nañez, Canta La Rana, La Vereda De Dichoso, Llave, Las Caobas, La Peña.