Buscar Circuitos Glosario

Circuito PGAR401CUM

Distribuidora EdeNorte - Provincia Santiago


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación D D D D D D D D D D D D
Clientes 1003 1003 998 991 985 991 991 962 971 977 963 978
% Nivel Cobranza 0.00% 89.04% 82.80% 115.01% 95.71% 85.52% 102.05% 90.77% 100.70% 84.54% 89.39% 97.82%
% Nivel Pérdida 0.00% 47.51% 40.29% 50.02% 39.40% 42.45% 48.08% 45.55% 44.70% 42.33% 45.71% 45.99%
Energía Suministrada (GWh) 0 0.3 0.28 0.28 0.25 0.29 0.29 0.28 0.28 0.28 0.28 0.29
Energía Facturada (GWh) 0 0.16 0.17 0.14 0.15 0.16 0.15 0.15 0.16 0.16 0.15 0.16
Energía Cobrada (GWh) 0 0.14 0.14 0.16 0.14 0.14 0.16 0.14 0.16 0.14 0.14 0.16
% Servicio 95.66% 94.80% 94.45% 97.38% 95.99% 99.09% 99.72% 96.98% 94.12% 94.98% 92.07% 98.51%
% Sin Servicio 4.34% 5.20% 5.55% 2.63% 4.01% 0.91% 0.28% 3.02% 5.88% 5.02% 7.93% 1.49%
Interrupción Programada (Hrs) 51.00 65.00 42.00 7.00 0.00 0.00 0.00 4.00 0.00 21.00 6.00 6.00
Interrupción Ejecutada (Hrs) 31.28 37.46 39.95 18.90 28.87 6.58 2.07 22.07 42.90 36.64 57.89 10.86
Promedio Interrupción Diarias (Hrs) 1.03 1.23 1.31 0.62 0.95 0.22 0.07 0.73 1.41 1.20 1.90 0.36
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito PGAR401CUM
Interrupciones Programadas 20
Interrupciones Ejecutadas 102.31
% Ejecución Operativa 511.55%
Detalle de Salidas - Circuito PGAR401CUM
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
08/07/2026 Ejecutada 17:28:54 17:51:32 2.51 CAUSA DESCONOCIDA // CORRECTIVO EN CONDUCTOR DE FASE // DISPARO DESCONOCIDO
08/07/2026 Ejecutada 17:20:16 17:25:57 2.51 CAUSA DESCONOCIDA // CORRECTIVO EN CONDUCTOR DE FASE // DISPARO DESCONOCIDO
08/07/2026 Ejecutada 15:42:41 17:20:10 2.51 CAUSA DESCONOCIDA // CORRECTIVO EN CONDUCTOR DE FASE // DISPARO DESCONOCIDO
08/07/2026 Ejecutada 15:37:26 15:42:35 2.51 CAUSA DESCONOCIDA // CORRECTIVO EN CONDUCTOR DE FASE // DISPARO DESCONOCIDO
08/07/2026 Ejecutada 15:33:46 15:37:21 2.51 CAUSA DESCONOCIDA // CORRECTIVO EN CONDUCTOR DE FASE // DISPARO DESCONOCIDO
08/07/2026 Ejecutada 14:16:31 14:21:47 2.51 CAUSA DESCONOCIDA // CORRECTIVO EN CONDUCTOR DE FASE // DISPARO DESCONOCIDO
08/07/2026 Ejecutada 13:28:38 13:39:08 2.51 CAUSA DESCONOCIDA // CORRECTIVO EN CONDUCTOR DE FASE // DISPARO DESCONOCIDO
07/07/2026 Programada 12:00:00 17:00:00 5
05/07/2026 Ejecutada 00:00:00 02:13:45 2.23 ARBOLES Y RAMA SOBRE LINEA // DISPARO DESCONOCIDO
04/07/2026 Programada 07:00:00 12:00:00 5 ARBOLES Y RAMA SOBRE LINEA // FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION
04/07/2026 Ejecutada 19:21:21 23:59:59 15.42 ARBOLES Y RAMA SOBRE LINEA // FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION
04/07/2026 Ejecutada 19:04:26 19:20:26 15.42 ARBOLES Y RAMA SOBRE LINEA // FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION
04/07/2026 Ejecutada 17:16:01 19:04:09 15.42 ARBOLES Y RAMA SOBRE LINEA // FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION
04/07/2026 Ejecutada 16:47:34 17:03:44 15.42 ARBOLES Y RAMA SOBRE LINEA // FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION
04/07/2026 Ejecutada 07:15:17 15:41:17 15.42 ARBOLES Y RAMA SOBRE LINEA // FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION
03/07/2026 Programada 10:00:00 15:00:00 5 OTROS
03/07/2026 Ejecutada 09:59:41 15:12:27 5.21 OTROS
02/07/2026 Ejecutada 15:24:27 15:36:13 0.2 FALLAS ETED, DISPARO DE LINEA TRANSMISION
01/07/2026 Programada 09:00:00 14:00:00 5
La Cumbre, Los Cacaos, Tinajita, La Cumbre de Juan Veras, Lajas, Gurabito de Yaroa, El Llano, Sonador, Carretera Turística (Parcial), El Americano.