Buscar Circuitos Glosario

Circuito PGAR401AUY

Distribuidora EdeNorte - Provincia Santiago


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación D D D D D D D D D D D D
Clientes 167 167 168 165 164 163 167 165 167 166 162 164
% Nivel Cobranza 0.00% 70.89% 86.07% 108.36% 91.38% 80.08% 102.77% 81.89% 91.82% 80.57% 73.25% 85.17%
% Nivel Pérdida 0.00% 68.90% 66.36% 68.80% 60.92% 64.79% 68.02% 64.61% 68.72% 70.56% 70.57% 73.50%
Energía Suministrada (GWh) 0 0.07 0.06 0.06 0.05 0.06 0.06 0.06 0.06 0.07 0.06 0.07
Energía Facturada (GWh) 0 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
Energía Cobrada (GWh) 0 0.01 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.01 0.02
% Servicio 94.73% 91.76% 95.52% 97.89% 95.69% 96.43% 99.57% 96.81% 95.27% 96.71% 89.54% 96.26%
% Sin Servicio 5.27% 8.24% 4.48% 2.11% 4.31% 3.57% 0.43% 3.19% 4.73% 3.29% 10.46% 3.74%
Interrupción Programada (Hrs) 56.00 65.00 39.00 7.00 0.00 6.00 0.00 4.00 0.00 6.00 18.00 6.00
Interrupción Ejecutada (Hrs) 37.94 59.34 32.29 15.20 31.05 25.70 3.19 23.29 34.51 24.02 76.39 27.27
Promedio Interrupción Diarias (Hrs) 1.25 1.95 1.06 0.50 1.02 0.84 0.10 0.77 1.13 0.79 2.51 0.90
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito PGAR401AUY
Interrupciones Programadas 20
Interrupciones Ejecutadas 99.51
% Ejecución Operativa 497.55%
Detalle de Salidas - Circuito PGAR401AUY
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
08/07/2026 Ejecutada 17:29:20 17:35:48 2.15 CAUSA DESCONOCIDA // FALLAS ETED, DISPARO DE LINEA TRANSMISION
08/07/2026 Ejecutada 17:20:16 17:25:57 2.15 CAUSA DESCONOCIDA // FALLAS ETED, DISPARO DE LINEA TRANSMISION
08/07/2026 Ejecutada 15:42:41 17:20:10 2.15 CAUSA DESCONOCIDA // FALLAS ETED, DISPARO DE LINEA TRANSMISION
08/07/2026 Ejecutada 15:37:26 15:42:35 2.15 CAUSA DESCONOCIDA // FALLAS ETED, DISPARO DE LINEA TRANSMISION
08/07/2026 Ejecutada 15:33:46 15:37:21 2.15 CAUSA DESCONOCIDA // FALLAS ETED, DISPARO DE LINEA TRANSMISION
08/07/2026 Ejecutada 13:28:38 13:39:08 2.15 CAUSA DESCONOCIDA // FALLAS ETED, DISPARO DE LINEA TRANSMISION
07/07/2026 Programada 12:00:00 17:00:00 5
05/07/2026 Ejecutada 00:00:00 02:13:33 2.23 DESBALANCE // DISPARO DESCONOCIDO
04/07/2026 Programada 07:00:00 12:00:00 5 ARBOLES Y RAMA SOBRE LINEA // CAUSA DESCONOCIDA // DESBALANCE
04/07/2026 Ejecutada 22:13:26 23:59:59 11.28 ARBOLES Y RAMA SOBRE LINEA // CAUSA DESCONOCIDA // DESBALANCE
04/07/2026 Ejecutada 20:30:30 20:55:01 11.28 ARBOLES Y RAMA SOBRE LINEA // CAUSA DESCONOCIDA // DESBALANCE
04/07/2026 Ejecutada 20:17:58 20:21:29 11.28 ARBOLES Y RAMA SOBRE LINEA // CAUSA DESCONOCIDA // DESBALANCE
04/07/2026 Ejecutada 19:04:26 19:20:26 11.28 ARBOLES Y RAMA SOBRE LINEA // CAUSA DESCONOCIDA // DESBALANCE
04/07/2026 Ejecutada 17:22:22 17:26:12 11.28 ARBOLES Y RAMA SOBRE LINEA // CAUSA DESCONOCIDA // DESBALANCE
04/07/2026 Ejecutada 16:47:34 17:03:44 11.28 ARBOLES Y RAMA SOBRE LINEA // CAUSA DESCONOCIDA // DESBALANCE
04/07/2026 Ejecutada 07:15:17 15:41:17 11.28 ARBOLES Y RAMA SOBRE LINEA // CAUSA DESCONOCIDA // DESBALANCE
03/07/2026 Programada 10:00:00 15:00:00 5 OTROS
03/07/2026 Ejecutada 09:59:33 15:12:32 5.22 OTROS
02/07/2026 Ejecutada 15:24:27 15:36:13 0.2 FALLAS ETED, DISPARO DE LINEA TRANSMISION
01/07/2026 Programada 09:00:00 14:00:00 5
Las Auyamas, El Piñon, El Hoyaso.