Buscar Circuitos Glosario

Circuito PGAR401

Distribuidora EdeNorte - Provincia Santiago


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación C C C C C C C C C C C C
Clientes 1582 1582 1590 1583 1580 1581 1566 1589 1559 1558 1520 1543
% Nivel Cobranza 0.00% 83.79% 90.91% 119.12% 91.49% 87.19% 112.48% 83.62% 112.35% 79.40% 88.30% 90.14%
% Nivel Pérdida 0.00% 43.57% 40.49% 45.81% 34.56% 38.11% 46.41% 39.00% 39.58% 33.10% 39.36% 38.46%
Energía Suministrada (GWh) 0 0.38 0.35 0.34 0.3 0.36 0.37 0.35 0.36 0.37 0.38 0.38
Energía Facturada (GWh) 0 0.22 0.21 0.19 0.2 0.22 0.2 0.21 0.22 0.25 0.23 0.24
Energía Cobrada (GWh) 0 0.18 0.19 0.22 0.18 0.19 0.22 0.18 0.24 0.2 0.2 0.21
% Servicio 98.81% 98.68% 99.27% 97.90% 96.11% 97.29% 99.76% 97.03% 97.72% 97.48% 95.43% 98.86%
% Sin Servicio 1.19% 1.32% 0.73% 2.10% 3.89% 2.71% 0.24% 2.97% 2.28% 2.52% 4.57% 1.14%
Interrupción Programada (Hrs) 1.00 0.00 5.00 7.00 0.00 10.00 0.00 4.00 0.00 6.00 0.00 6.00
Interrupción Ejecutada (Hrs) 8.60 9.53 5.26 15.14 27.99 19.53 1.80 21.67 16.62 18.43 33.35 8.30
Promedio Interrupción Diarias (Hrs) 0.28 0.31 0.17 0.50 0.92 0.64 0.06 0.71 0.55 0.61 1.10 0.27
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito PGAR401
Interrupciones Programadas 4
Interrupciones Ejecutadas 70.10
% Ejecución Operativa 1752.50%
Detalle de Salidas - Circuito PGAR401
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
08/07/2026 Ejecutada 17:29:20 17:35:48 2.15 CAUSA DESCONOCIDA // FALLAS ETED, DISPARO DE LINEA TRANSMISION
08/07/2026 Ejecutada 17:20:16 17:25:57 2.15 CAUSA DESCONOCIDA // FALLAS ETED, DISPARO DE LINEA TRANSMISION
08/07/2026 Ejecutada 15:42:41 17:20:10 2.15 CAUSA DESCONOCIDA // FALLAS ETED, DISPARO DE LINEA TRANSMISION
08/07/2026 Ejecutada 15:37:26 15:42:35 2.15 CAUSA DESCONOCIDA // FALLAS ETED, DISPARO DE LINEA TRANSMISION
08/07/2026 Ejecutada 15:33:46 15:37:21 2.15 CAUSA DESCONOCIDA // FALLAS ETED, DISPARO DE LINEA TRANSMISION
08/07/2026 Ejecutada 13:28:38 13:39:08 2.15 CAUSA DESCONOCIDA // FALLAS ETED, DISPARO DE LINEA TRANSMISION
04/07/2026 Programada 08:00:00 12:00:00 4 ARBOLES Y RAMA SOBRE LINEA // CAUSA DESCONOCIDA // DISPARO DESCONOCIDO
04/07/2026 Ejecutada 20:30:30 20:55:01 9.5 ARBOLES Y RAMA SOBRE LINEA // CAUSA DESCONOCIDA // DISPARO DESCONOCIDO
04/07/2026 Ejecutada 20:17:58 20:21:29 9.5 ARBOLES Y RAMA SOBRE LINEA // CAUSA DESCONOCIDA // DISPARO DESCONOCIDO
04/07/2026 Ejecutada 19:04:26 19:20:26 9.5 ARBOLES Y RAMA SOBRE LINEA // CAUSA DESCONOCIDA // DISPARO DESCONOCIDO
04/07/2026 Ejecutada 17:22:22 17:26:12 9.5 ARBOLES Y RAMA SOBRE LINEA // CAUSA DESCONOCIDA // DISPARO DESCONOCIDO
04/07/2026 Ejecutada 16:47:34 17:03:44 9.5 ARBOLES Y RAMA SOBRE LINEA // CAUSA DESCONOCIDA // DISPARO DESCONOCIDO
04/07/2026 Ejecutada 07:15:17 15:41:17 9.5 ARBOLES Y RAMA SOBRE LINEA // CAUSA DESCONOCIDA // DISPARO DESCONOCIDO
02/07/2026 Ejecutada 15:24:27 15:36:13 0.2 FALLAS ETED, DISPARO DE LINEA TRANSMISION
Pedro García, Carretera Turística (parcial), Hospital Municipal.