Buscar Circuitos Glosario

Circuito PGAR401

Distribuidora EdeNorte - Provincia Santiago


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación C C C C C C C C C C C C
Clientes 1604 1604 1579 1579 1582 1590 1583 1580 1581 1566 1589 1559
% Nivel Cobranza 0.00% 84.89% 97.76% 84.55% 83.79% 90.91% 119.12% 91.49% 87.19% 112.48% 83.62% 112.35%
% Nivel Pérdida 0.00% 39.05% 42.58% 39.19% 43.57% 40.49% 45.81% 34.56% 38.11% 46.41% 39.00% 39.58%
Energía Suministrada (GWh) 0 0.43 0.39 0.39 0.38 0.35 0.34 0.3 0.36 0.37 0.35 0.36
Energía Facturada (GWh) 0 0.26 0.23 0.24 0.22 0.21 0.19 0.2 0.22 0.2 0.21 0.22
Energía Cobrada (GWh) 0 0.22 0.22 0.2 0.18 0.19 0.22 0.18 0.19 0.22 0.18 0.24
% Servicio 96.89% 97.59% 93.58% 98.81% 98.68% 99.27% 97.90% 96.11% 97.29% 99.76% 97.03% 97.72%
% Sin Servicio 3.11% 2.41% 6.42% 1.19% 1.32% 0.73% 2.10% 3.89% 2.71% 0.24% 2.97% 2.28%
Interrupción Programada (Hrs) 1.00 0.00 16.00 1.00 0.00 5.00 7.00 0.00 10.00 0.00 4.00 0.00
Interrupción Ejecutada (Hrs) 22.42 17.34 46.21 8.60 9.53 5.26 15.14 27.99 19.53 1.80 21.67 16.62
Promedio Interrupción Diarias (Hrs) 0.74 0.57 1.52 0.28 0.31 0.17 0.50 0.92 0.64 0.06 0.71 0.55
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito PGAR401
Interrupciones Programadas 5
Interrupciones Ejecutadas 7.48
% Ejecución Operativa 149.60%
Detalle de Salidas - Circuito PGAR401
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
16/10/2026 Ejecutada 09:37:27 13:14:40 3.62 CORRECTIVO EN CONDUCTOR DE FASE
15/10/2026 Programada 10:00:00 15:00:00 5 MANTENIMIENTO GENERAL SUBESTACION
15/10/2026 Ejecutada 10:19:02 14:06:32 3.79 MANTENIMIENTO GENERAL SUBESTACION
09/10/2026 Ejecutada 18:27:17 18:31:38 0.07 DISPARO DESCONOCIDO
Pedro García, Carretera Turística (parcial), Hospital Municipal.