Circuito PEND105PEL
Distribuidora EdeNorte - Provincia Santiago
| Mes-Año | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 |
|---|---|---|---|---|---|---|---|
| Clasificación | C | C | C | C | C | C | C |
| Clientes | 893 | 1 | 1 | 1 | 1 | 1 | 1 |
| % Nivel Cobranza | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| % Nivel Pérdida | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Energía Suministrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Energía Facturada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Energía Cobrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| % Servicio | 97.60% | 98.20% | 98.45% | 99.29% | 99.40% | 98.71% | 97.88% |
| % Sin Servicio | 2.40% | 1.80% | 1.55% | 0.71% | 0.60% | 1.29% | 2.12% |
| Interrupción Programada (Hrs) | 12.00 | 6.00 | 6.00 | 6.00 | 0.00 | 6.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 17.29 | 12.98 | 11.16 | 5.10 | 4.33 | 9.28 | 15.76 |
| Promedio Interrupción Diarias (Hrs) | 0.57 | 0.43 | 0.37 | 0.17 | 0.14 | 0.31 | 0.52 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 08/07/2026 | Ejecutada | 23:46:26 | 23:59:59 | 3.43 | APERTURA DE LINEA DE TRANSMISION // CAUSA DESCONOCIDA // CORRECTIVO EN FUSIBLE |
| 08/07/2026 | Ejecutada | 15:32:36 | 15:42:13 | 3.43 | APERTURA DE LINEA DE TRANSMISION // CAUSA DESCONOCIDA // CORRECTIVO EN FUSIBLE |
| 08/07/2026 | Ejecutada | 14:30:18 | 14:53:08 | 3.43 | APERTURA DE LINEA DE TRANSMISION // CAUSA DESCONOCIDA // CORRECTIVO EN FUSIBLE |
| 08/07/2026 | Ejecutada | 14:21:05 | 14:30:17 | 3.43 | APERTURA DE LINEA DE TRANSMISION // CAUSA DESCONOCIDA // CORRECTIVO EN FUSIBLE |
| 08/07/2026 | Ejecutada | 12:45:04 | 13:40:46 | 3.43 | APERTURA DE LINEA DE TRANSMISION // CAUSA DESCONOCIDA // CORRECTIVO EN FUSIBLE |
| 08/07/2026 | Ejecutada | 12:38:12 | 12:45:03 | 3.43 | APERTURA DE LINEA DE TRANSMISION // CAUSA DESCONOCIDA // CORRECTIVO EN FUSIBLE |
| 08/07/2026 | Ejecutada | 07:56:53 | 08:14:34 | 3.43 | APERTURA DE LINEA DE TRANSMISION // CAUSA DESCONOCIDA // CORRECTIVO EN FUSIBLE |
| 08/07/2026 | Ejecutada | 01:48:45 | 01:53:29 | 3.43 | APERTURA DE LINEA DE TRANSMISION // CAUSA DESCONOCIDA // CORRECTIVO EN FUSIBLE |
| 08/07/2026 | Ejecutada | 00:01:50 | 01:07:25 | 3.43 | APERTURA DE LINEA DE TRANSMISION // CAUSA DESCONOCIDA // CORRECTIVO EN FUSIBLE |
| 07/07/2026 | Ejecutada | 16:47:28 | 20:39:07 | 5.04 | ACCIDENTE VEHICULAR // POSTE ROTO |
| 07/07/2026 | Ejecutada | 13:52:07 | 15:02:44 | 5.04 | ACCIDENTE VEHICULAR // POSTE ROTO |
| 06/07/2026 | Programada | 10:00:00 | 16:00:00 | 6 | INTERCONEXION DE PROYECTOS // PODA PREVENTIVO |
| 06/07/2026 | Ejecutada | 10:41:22 | 17:49:20 | 7.27 | INTERCONEXION DE PROYECTOS // PODA PREVENTIVO |
| 06/07/2026 | Ejecutada | 10:06:25 | 10:14:27 | 7.27 | INTERCONEXION DE PROYECTOS // PODA PREVENTIVO |
| 05/07/2026 | Ejecutada | 23:08:31 | 23:25:05 | 0.28 | REGULACION DE FRECUENCIA |
| 04/07/2026 | Ejecutada | 03:10:49 | 03:21:40 | 0.18 | CORRECTIVO EN FUSIBLE |
| 02/07/2026 | Programada | 10:00:00 | 16:00:00 | 6 | APERTURA DE LINEA DE TRANSMISION // INTERCONEXION DE PROYECTOS |
| 02/07/2026 | Ejecutada | 11:15:00 | 17:26:29 | 7.33 | APERTURA DE LINEA DE TRANSMISION // INTERCONEXION DE PROYECTOS |
| 02/07/2026 | Ejecutada | 10:06:45 | 11:15:00 | 7.33 | APERTURA DE LINEA DE TRANSMISION // INTERCONEXION DE PROYECTOS |
| 01/07/2026 | Ejecutada | 21:13:33 | 21:18:25 | 0.08 | CORRECTIVO EN FUSIBLE |