Circuito PEND105

Distribuidora EdeNorte - Provincia Santiago


Mes-Año Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24 May24
Clasificación C C C A A A A A A A A A
Clientes 4434 4434 4422 2580 4392 4392 2599 2609 2598 2580 0 2568
% Nivel Cobranza 0.00% 107.62% 108.02% 103.89% 99.26% 1.00% 91.32% 89.41% 94.50% 102.90% 91.55% 105.39%
% Nivel Pérdida 0.00% 27.89% 21.17% 9.53% 17.58% 17.64% 61.43% 40.57% 40.86% 54.18% 66.65% 29.64%
Energía Suministrada (GWh) 0 1.71 1.54 1.6 1.89 1.99 2.6 1.53 1.52 1.87 2.48 1.12
Energía Facturada (GWh) 0 1.23 1.22 1.44 1.55 1.64 1 0.91 0.9 0.86 0.83 0.79
Energía Cobrada (GWh) 0 1.32 1.31 1.5 1.54 0.02 0.91 0.81 0.85 0.88 0.76 0.83
% Servicio 96.93% 98.30% 98.23% 93.82% 96.97% 99.35% 98.58% 98.40% 97.85% 99.47% 0.00% 98.60%
% Sin Servicio 3.07% 1.70% 1.77% 6.18% 3.03% 0.65% 1.42% 1.60% 2.15% 0.53% 0.00% 1.40%
Interrupción Programada (Hrs) 3.00 6.00 6.00 37.00 12.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 22.42 12.39 12.90 45.12 22.14 4.74 10.36 11.70 15.71 3.84 0.00 10.25
Promedio Interrupción Diarias (Hrs) 0.74 0.41 0.42 1.48 0.73 0.16 0.34 0.38 0.52 0.13 0.00 0.34
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Autopista Duarte parcial (Penda), Industria Tucan, El Romero, El Quemado, Autopista Ramón Cáceres (Parcial), El Llano, Carretera presa de Tavera (Parcial), La Penda, La Torre, Yabanal. Ortega (Parcial), Los Romeros, Aut. Ramón Caceres (Parcial), Fabrica de Colchones, Metro Gas, Aceros Construcciones, Acero Estrella, Parada La Mina, Parada La Volanta, Hormigones Antillas, Urb. Nono, Pinturas Tucan, Agrotel, Procesadora de Alimentos Súper Alba. Ortega, El Higuerito, Autopista Duarte (parcial).