Circuito PEND104

Distribuidora EdeNorte - Provincia La Vega


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación D D D D D D D D D D D D
Clientes 5088 5088 5876 5876 5835 5803 5802 5466 5435 5436 5427 5394
% Nivel Cobranza 0.00% 91.03% 109.86% 95.76% 91.47% 94.31% 115.34% 91.63% 102.52% 111.67% 93.09% 84.22%
% Nivel Pérdida 0.00% 47.28% 29.38% 25.84% 29.56% 20.96% 31.49% 13.32% 22.29% 16.66% 13.68% 27.65%
Energía Suministrada (GWh) 0 3.99 4.17 3.87 3.7 3.31 3.44 2.96 3.2 3.25 3.41 3.82
Energía Facturada (GWh) 0 2.1 2.95 2.87 2.61 2.61 2.36 2.56 2.48 2.7 2.94 2.76
Energía Cobrada (GWh) 0 1.92 3.24 2.75 2.38 2.47 2.72 2.35 2.55 3.02 2.74 2.33
% Servicio 95.62% 97.53% 95.91% 97.29% 97.95% 98.34% 99.43% 98.87% 99.81% 95.60% 98.33% 97.92%
% Sin Servicio 4.38% 2.47% 4.09% 2.71% 2.05% 1.66% 0.57% 1.13% 0.19% 4.40% 1.67% 2.08%
Interrupción Programada (Hrs) 18.00 20.00 24.00 12.00 6.00 6.00 6.00 0.00 0.00 6.00 0.00 6.00
Interrupción Ejecutada (Hrs) 31.53 17.76 29.46 19.54 14.78 11.97 4.12 8.16 1.39 32.72 12.21 15.17
Promedio Interrupción Diarias (Hrs) 1.04 0.58 0.97 0.64 0.49 0.39 0.14 0.27 0.05 1.08 0.40 0.50
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito PEND104
Interrupciones Programadas 12
Interrupciones Ejecutadas 44.60
% Ejecución Operativa 371.67%
Detalle de Salidas - Circuito PEND104
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
20/10/2026 Programada 09:00:00 15:00:00 6 APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION
20/10/2026 Ejecutada 17:57:54 18:57:31 7.82 APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION
20/10/2026 Ejecutada 11:45:26 17:27:04 7.82 APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION
20/10/2026 Ejecutada 09:21:04 10:28:54 7.82 APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION
19/10/2026 Programada 10:00:00 16:00:00 6 INTERCONEXION DE PROYECTOS
19/10/2026 Ejecutada 10:54:25 15:19:27 4.42 INTERCONEXION DE PROYECTOS
18/10/2026 Ejecutada 20:09:25 20:12:52 0.31 DISPARO DESCONOCIDO // PORTAFUSIBLE DEFECTUOSO
18/10/2026 Ejecutada 19:16:01 19:24:26 0.31 DISPARO DESCONOCIDO // PORTAFUSIBLE DEFECTUOSO
18/10/2026 Ejecutada 18:48:51 18:55:35 0.31 DISPARO DESCONOCIDO // PORTAFUSIBLE DEFECTUOSO
15/10/2026 Ejecutada 11:18:57 11:27:41 0.3 APERTURA POR PROXIMIDAD CON OTRO CIRCUITO
15/10/2026 Ejecutada 08:36:50 08:45:56 0.3 APERTURA POR PROXIMIDAD CON OTRO CIRCUITO
14/10/2026 Ejecutada 11:35:34 11:43:44 1.6 COMPLETAR RAMAL POR AVERIA DE CORRECTIVO // CORRECTIVO EN CONDUCTOR DE FASE // FALLAS ETED, DISPARO DE LINEA TRANSMISION
14/10/2026 Ejecutada 02:09:56 02:13:32 1.6 COMPLETAR RAMAL POR AVERIA DE CORRECTIVO // CORRECTIVO EN CONDUCTOR DE FASE // FALLAS ETED, DISPARO DE LINEA TRANSMISION
14/10/2026 Ejecutada 02:06:15 02:09:47 1.6 COMPLETAR RAMAL POR AVERIA DE CORRECTIVO // CORRECTIVO EN CONDUCTOR DE FASE // FALLAS ETED, DISPARO DE LINEA TRANSMISION
14/10/2026 Ejecutada 00:38:00 01:21:17 1.6 COMPLETAR RAMAL POR AVERIA DE CORRECTIVO // CORRECTIVO EN CONDUCTOR DE FASE // FALLAS ETED, DISPARO DE LINEA TRANSMISION
14/10/2026 Ejecutada 00:00:00 00:37:24 1.6 COMPLETAR RAMAL POR AVERIA DE CORRECTIVO // CORRECTIVO EN CONDUCTOR DE FASE // FALLAS ETED, DISPARO DE LINEA TRANSMISION
13/10/2026 Ejecutada 16:48:33 23:59:59 7.19 FALLAS ETED, DISPARO DE LINEA TRANSMISION
Autopista Duarte parcial (Cruce de Moca), El Reparadero, Las Lajas, Carretera Tavera Parcial, El Mamey, San José Adentro, Las Canas.