Circuito PEND104
Distribuidora EdeNorte - Provincia La Vega
| Mes-Año | Sep26 | Ago26 | Jul26 | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | D | D | D | D | D | D | D | D | D | D | D | D |
| Clientes | 5088 | 5088 | 5876 | 5876 | 5835 | 5803 | 5802 | 5466 | 5435 | 5436 | 5427 | 5394 |
| % Nivel Cobranza | 0.00% | 91.03% | 109.86% | 95.76% | 91.47% | 94.31% | 115.34% | 91.63% | 102.52% | 111.67% | 93.09% | 84.22% |
| % Nivel Pérdida | 0.00% | 47.28% | 29.38% | 25.84% | 29.56% | 20.96% | 31.49% | 13.32% | 22.29% | 16.66% | 13.68% | 27.65% |
| Energía Suministrada (GWh) | 0 | 3.99 | 4.17 | 3.87 | 3.7 | 3.31 | 3.44 | 2.96 | 3.2 | 3.25 | 3.41 | 3.82 |
| Energía Facturada (GWh) | 0 | 2.1 | 2.95 | 2.87 | 2.61 | 2.61 | 2.36 | 2.56 | 2.48 | 2.7 | 2.94 | 2.76 |
| Energía Cobrada (GWh) | 0 | 1.92 | 3.24 | 2.75 | 2.38 | 2.47 | 2.72 | 2.35 | 2.55 | 3.02 | 2.74 | 2.33 |
| % Servicio | 95.62% | 97.53% | 95.91% | 97.29% | 97.95% | 98.34% | 99.43% | 98.87% | 99.81% | 95.60% | 98.33% | 97.92% |
| % Sin Servicio | 4.38% | 2.47% | 4.09% | 2.71% | 2.05% | 1.66% | 0.57% | 1.13% | 0.19% | 4.40% | 1.67% | 2.08% |
| Interrupción Programada (Hrs) | 18.00 | 20.00 | 24.00 | 12.00 | 6.00 | 6.00 | 6.00 | 0.00 | 0.00 | 6.00 | 0.00 | 6.00 |
| Interrupción Ejecutada (Hrs) | 31.53 | 17.76 | 29.46 | 19.54 | 14.78 | 11.97 | 4.12 | 8.16 | 1.39 | 32.72 | 12.21 | 15.17 |
| Promedio Interrupción Diarias (Hrs) | 1.04 | 0.58 | 0.97 | 0.64 | 0.49 | 0.39 | 0.14 | 0.27 | 0.05 | 1.08 | 0.40 | 0.50 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 20/10/2026 | Programada | 09:00:00 | 15:00:00 | 6 | APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION |
| 20/10/2026 | Ejecutada | 17:57:54 | 18:57:31 | 7.82 | APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION |
| 20/10/2026 | Ejecutada | 11:45:26 | 17:27:04 | 7.82 | APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION |
| 20/10/2026 | Ejecutada | 09:21:04 | 10:28:54 | 7.82 | APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION |
| 19/10/2026 | Programada | 10:00:00 | 16:00:00 | 6 | INTERCONEXION DE PROYECTOS |
| 19/10/2026 | Ejecutada | 10:54:25 | 15:19:27 | 4.42 | INTERCONEXION DE PROYECTOS |
| 18/10/2026 | Ejecutada | 20:09:25 | 20:12:52 | 0.31 | DISPARO DESCONOCIDO // PORTAFUSIBLE DEFECTUOSO |
| 18/10/2026 | Ejecutada | 19:16:01 | 19:24:26 | 0.31 | DISPARO DESCONOCIDO // PORTAFUSIBLE DEFECTUOSO |
| 18/10/2026 | Ejecutada | 18:48:51 | 18:55:35 | 0.31 | DISPARO DESCONOCIDO // PORTAFUSIBLE DEFECTUOSO |
| 15/10/2026 | Ejecutada | 11:18:57 | 11:27:41 | 0.3 | APERTURA POR PROXIMIDAD CON OTRO CIRCUITO |
| 15/10/2026 | Ejecutada | 08:36:50 | 08:45:56 | 0.3 | APERTURA POR PROXIMIDAD CON OTRO CIRCUITO |
| 14/10/2026 | Ejecutada | 11:35:34 | 11:43:44 | 1.6 | COMPLETAR RAMAL POR AVERIA DE CORRECTIVO // CORRECTIVO EN CONDUCTOR DE FASE // FALLAS ETED, DISPARO DE LINEA TRANSMISION |
| 14/10/2026 | Ejecutada | 02:09:56 | 02:13:32 | 1.6 | COMPLETAR RAMAL POR AVERIA DE CORRECTIVO // CORRECTIVO EN CONDUCTOR DE FASE // FALLAS ETED, DISPARO DE LINEA TRANSMISION |
| 14/10/2026 | Ejecutada | 02:06:15 | 02:09:47 | 1.6 | COMPLETAR RAMAL POR AVERIA DE CORRECTIVO // CORRECTIVO EN CONDUCTOR DE FASE // FALLAS ETED, DISPARO DE LINEA TRANSMISION |
| 14/10/2026 | Ejecutada | 00:38:00 | 01:21:17 | 1.6 | COMPLETAR RAMAL POR AVERIA DE CORRECTIVO // CORRECTIVO EN CONDUCTOR DE FASE // FALLAS ETED, DISPARO DE LINEA TRANSMISION |
| 14/10/2026 | Ejecutada | 00:00:00 | 00:37:24 | 1.6 | COMPLETAR RAMAL POR AVERIA DE CORRECTIVO // CORRECTIVO EN CONDUCTOR DE FASE // FALLAS ETED, DISPARO DE LINEA TRANSMISION |
| 13/10/2026 | Ejecutada | 16:48:33 | 23:59:59 | 7.19 | FALLAS ETED, DISPARO DE LINEA TRANSMISION |