Circuito PEND104

Distribuidora EdeNorte - Provincia La Vega


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación D D D D D D D D D D D D
Clientes 5835 5835 5803 5802 5466 5435 5436 5427 5394 5363 5743 5718
% Nivel Cobranza 0.00% 91.47% 94.31% 115.34% 91.63% 102.52% 111.67% 93.09% 84.22% 89.31% 94.10% 92.93%
% Nivel Pérdida 0.00% 29.56% 20.96% 31.49% 13.32% 22.29% 16.66% 13.68% 27.65% 19.60% 26.74% 33.27%
Energía Suministrada (GWh) 0 3.7 3.31 3.44 2.96 3.2 3.25 3.41 3.82 3.76 3.88 4.04
Energía Facturada (GWh) 0 2.61 2.61 2.36 2.56 2.48 2.7 2.94 2.76 3.02 2.84 2.7
Energía Cobrada (GWh) 0 2.38 2.47 2.72 2.35 2.55 3.02 2.74 2.33 2.7 2.67 2.5
% Servicio 97.29% 97.95% 98.34% 99.43% 98.87% 99.81% 95.60% 98.33% 97.92% 98.36% 94.27% 98.34%
% Sin Servicio 2.71% 2.05% 1.66% 0.57% 1.13% 0.19% 4.40% 1.67% 2.08% 1.64% 5.73% 1.66%
Interrupción Programada (Hrs) 12.00 6.00 6.00 6.00 0.00 0.00 6.00 0.00 6.00 0.00 6.00 12.00
Interrupción Ejecutada (Hrs) 19.54 14.78 11.97 4.12 8.16 1.39 32.72 12.21 15.17 11.95 41.81 12.13
Promedio Interrupción Diarias (Hrs) 0.64 0.49 0.39 0.14 0.27 0.05 1.08 0.40 0.50 0.39 1.37 0.40
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito PEND104
Interrupciones Programadas 12
Interrupciones Ejecutadas 68.84
% Ejecución Operativa 573.67%
Detalle de Salidas - Circuito PEND104
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
08/07/2026 Ejecutada 19:57:23 20:00:49 2.7 APERTURA DE LINEA DE TRANSMISION // DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION
08/07/2026 Ejecutada 15:32:43 15:42:23 2.7 APERTURA DE LINEA DE TRANSMISION // DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION
08/07/2026 Ejecutada 13:03:16 13:07:22 2.7 APERTURA DE LINEA DE TRANSMISION // DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION
08/07/2026 Ejecutada 12:46:53 12:51:14 2.7 APERTURA DE LINEA DE TRANSMISION // DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION
08/07/2026 Ejecutada 07:56:23 08:14:28 2.7 APERTURA DE LINEA DE TRANSMISION // DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION
08/07/2026 Ejecutada 04:22:04 05:02:24 2.7 APERTURA DE LINEA DE TRANSMISION // DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION
08/07/2026 Ejecutada 00:01:45 01:23:48 2.7 APERTURA DE LINEA DE TRANSMISION // DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION
07/07/2026 Ejecutada 16:47:00 20:38:40 5.03 ACCIDENTE VEHICULAR // POSTE ROTO
07/07/2026 Ejecutada 14:54:00 15:02:16 5.03 ACCIDENTE VEHICULAR // POSTE ROTO
07/07/2026 Ejecutada 13:56:42 14:54:00 5.03 ACCIDENTE VEHICULAR // POSTE ROTO
07/07/2026 Ejecutada 13:52:07 13:56:42 5.03 ACCIDENTE VEHICULAR // POSTE ROTO
06/07/2026 Programada 10:00:00 16:00:00 6 INTERCONEXION DE PROYECTOS
06/07/2026 Ejecutada 11:53:48 17:49:45 7.06 INTERCONEXION DE PROYECTOS
06/07/2026 Ejecutada 10:41:11 11:48:36 7.06 INTERCONEXION DE PROYECTOS
04/07/2026 Ejecutada 17:13:20 17:25:40 0.21 DISPARO DESCONOCIDO
03/07/2026 Ejecutada 17:11:32 17:16:27 0.22 DISPARO DESCONOCIDO // PODA PREVENTIVO
03/07/2026 Ejecutada 10:11:23 10:15:58 0.22 DISPARO DESCONOCIDO // PODA PREVENTIVO
03/07/2026 Ejecutada 09:40:06 09:44:04 0.22 DISPARO DESCONOCIDO // PODA PREVENTIVO
02/07/2026 Programada 10:00:00 16:00:00 6 APERTURA DE LINEA DE TRANSMISION // INTERCONEXION DE PROYECTOS
02/07/2026 Ejecutada 11:15:00 17:26:26 7.33 APERTURA DE LINEA DE TRANSMISION // INTERCONEXION DE PROYECTOS
02/07/2026 Ejecutada 10:06:36 11:15:00 7.33 APERTURA DE LINEA DE TRANSMISION // INTERCONEXION DE PROYECTOS
01/07/2026 Ejecutada 14:49:59 14:59:52 0.17 DISPARO DESCONOCIDO
Autopista Duarte parcial (Cruce de Moca), El Reparadero, Las Lajas, Carretera Tavera Parcial, El Mamey, San José Adentro, Las Canas.