Circuito PEND103HOG
Distribuidora EdeNorte - Provincia La Vega
| Mes-Año | Sep26 | Ago26 | Jul26 | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | D | D | D | D | D | D | D | D | D | D | D | D |
| Clientes | 1425 | 1425 | 1386 | 1386 | 1387 | 1380 | 1380 | 1372 | 1378 | 1380 | 1370 | 1368 |
| % Nivel Cobranza | 0.00% | 82.65% | 95.26% | 92.61% | 93.25% | 101.15% | 108.49% | 102.44% | 97.37% | 103.20% | 96.24% | 95.49% |
| % Nivel Pérdida | 0.00% | 63.85% | 62.67% | 62.95% | 64.25% | 60.27% | 61.14% | 55.97% | 57.18% | 59.20% | 57.19% | 55.63% |
| Energía Suministrada (GWh) | 0 | 0.84 | 0.76 | 0.71 | 0.66 | 0.55 | 0.56 | 0.5 | 0.56 | 0.58 | 0.59 | 0.59 |
| Energía Facturada (GWh) | 0 | 0.3 | 0.28 | 0.26 | 0.24 | 0.22 | 0.22 | 0.22 | 0.24 | 0.24 | 0.25 | 0.26 |
| Energía Cobrada (GWh) | 0 | 0.25 | 0.27 | 0.24 | 0.22 | 0.22 | 0.23 | 0.23 | 0.23 | 0.24 | 0.24 | 0.25 |
| % Servicio | 96.03% | 97.30% | 95.57% | 96.42% | 93.75% | 94.44% | 98.76% | 98.71% | 99.90% | 97.90% | 98.71% | 97.04% |
| % Sin Servicio | 3.97% | 2.70% | 4.43% | 3.58% | 6.25% | 5.56% | 1.24% | 1.29% | 0.10% | 2.10% | 1.29% | 2.96% |
| Interrupción Programada (Hrs) | 0.00 | 46.00 | 56.00 | 65.00 | 68.00 | 40.00 | 18.00 | 10.00 | 5.00 | 6.00 | 0.00 | 6.00 |
| Interrupción Ejecutada (Hrs) | 28.58 | 19.42 | 31.88 | 25.79 | 44.98 | 40.03 | 8.93 | 9.31 | 0.71 | 15.63 | 9.44 | 21.64 |
| Promedio Interrupción Diarias (Hrs) | 0.94 | 0.64 | 1.05 | 0.85 | 1.48 | 1.32 | 0.29 | 0.31 | 0.02 | 0.51 | 0.31 | 0.71 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 20/10/2026 | Programada | 14:00:00 | 15:00:00 | 1 | APERTURA DE LINEA DE TRANSMISION // CAUSA DESCONOCIDA // CORRECTIVO EN CONDUCTOR DE FASE |
| 20/10/2026 | Programada | 09:00:00 | 09:00:00 | 1 | APERTURA DE LINEA DE TRANSMISION // CAUSA DESCONOCIDA // CORRECTIVO EN CONDUCTOR DE FASE |
| 20/10/2026 | Ejecutada | 21:10:55 | 22:08:59 | 9.05 | APERTURA DE LINEA DE TRANSMISION // CAUSA DESCONOCIDA // CORRECTIVO EN CONDUCTOR DE FASE |
| 20/10/2026 | Ejecutada | 17:56:51 | 19:02:01 | 9.05 | APERTURA DE LINEA DE TRANSMISION // CAUSA DESCONOCIDA // CORRECTIVO EN CONDUCTOR DE FASE |
| 20/10/2026 | Ejecutada | 13:50:57 | 17:28:04 | 9.05 | APERTURA DE LINEA DE TRANSMISION // CAUSA DESCONOCIDA // CORRECTIVO EN CONDUCTOR DE FASE |
| 20/10/2026 | Ejecutada | 11:45:43 | 13:50:57 | 9.05 | APERTURA DE LINEA DE TRANSMISION // CAUSA DESCONOCIDA // CORRECTIVO EN CONDUCTOR DE FASE |
| 20/10/2026 | Ejecutada | 09:20:12 | 10:37:49 | 9.05 | APERTURA DE LINEA DE TRANSMISION // CAUSA DESCONOCIDA // CORRECTIVO EN CONDUCTOR DE FASE |
| 19/10/2026 | Programada | 13:00:00 | 18:00:00 | 5 | DISPARO DESCONOCIDO // PODA PREVENTIVO |
| 19/10/2026 | Ejecutada | 13:16:33 | 17:45:54 | 4.57 | DISPARO DESCONOCIDO // PODA PREVENTIVO |
| 19/10/2026 | Ejecutada | 08:51:21 | 08:56:02 | 4.57 | DISPARO DESCONOCIDO // PODA PREVENTIVO |
| 17/10/2026 | Ejecutada | 05:47:45 | 05:51:04 | 0.06 | DISPARO DESCONOCIDO |
| 16/10/2026 | Ejecutada | 15:15:42 | 16:02:23 | 0.86 | DISPARO DESCONOCIDO // PERDIDA DE TENSION DE LA 12.5 |
| 16/10/2026 | Ejecutada | 15:10:56 | 15:15:42 | 0.86 | DISPARO DESCONOCIDO // PERDIDA DE TENSION DE LA 12.5 |
| 14/10/2026 | Ejecutada | 22:41:22 | 22:46:01 | 8.82 | DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PERDIDA DE TENSION DE LA 12.5 |
| 14/10/2026 | Ejecutada | 00:36:00 | 08:44:24 | 8.82 | DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PERDIDA DE TENSION DE LA 12.5 |
| 14/10/2026 | Ejecutada | 00:00:00 | 00:36:00 | 8.82 | DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PERDIDA DE TENSION DE LA 12.5 |
| 13/10/2026 | Ejecutada | 16:47:04 | 23:59:59 | 7.22 | FALLAS ETED, DISPARO DE LINEA TRANSMISION |