Buscar Circuitos Glosario

Circuito PEND103

Distribuidora EdeNorte - Provincia La Vega


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación B B B B B B B B B B B B
Clientes 6730 6730 6658 6658 6628 6643 6654 6659 6622 6632 6578 6522
% Nivel Cobranza 0.00% 85.17% 101.38% 85.04% 96.82% 91.20% 104.24% 98.99% 100.51% 109.34% 100.98% 106.86%
% Nivel Pérdida 0.00% 21.91% 29.92% 25.05% 31.67% 24.00% 31.73% 19.13% 22.89% 27.04% 17.98% 25.16%
Energía Suministrada (GWh) 0 3.35 3.2 3.01 2.84 2.45 2.41 2.16 2.36 2.45 2.48 2.81
Energía Facturada (GWh) 0 2.62 2.24 2.25 1.94 1.86 1.65 1.74 1.82 1.79 2.04 2.1
Energía Cobrada (GWh) 0 2.23 2.27 1.92 1.88 1.7 1.72 1.73 1.83 1.95 2.06 2.24
% Servicio 99.57% 99.92% 99.30% 98.87% 98.53% 98.80% 98.79% 99.37% 99.98% 97.90% 98.71% 98.72%
% Sin Servicio 0.43% 0.08% 0.70% 1.13% 1.47% 1.20% 1.21% 0.63% 0.02% 2.10% 1.29% 1.28%
Interrupción Programada (Hrs) 0.00 6.00 6.00 5.00 6.00 6.00 12.00 0.00 0.00 6.00 0.00 5.00
Interrupción Ejecutada (Hrs) 3.13 0.60 5.01 8.17 10.61 8.63 8.70 4.56 0.12 15.63 9.44 9.36
Promedio Interrupción Diarias (Hrs) 0.10 0.02 0.16 0.27 0.35 0.28 0.29 0.15 0.00 0.51 0.31 0.31
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito PEND103
Interrupciones Programadas 2
Interrupciones Ejecutadas 57.93
% Ejecución Operativa 2896.50%
Detalle de Salidas - Circuito PEND103
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
20/10/2026 Programada 14:00:00 15:00:00 1 APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION
20/10/2026 Programada 09:00:00 09:00:00 1 APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION
20/10/2026 Ejecutada 17:57:52 18:58:02 7.82 APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION
20/10/2026 Ejecutada 11:45:54 17:28:04 7.82 APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION
20/10/2026 Ejecutada 09:20:24 10:27:27 7.82 APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION
17/10/2026 Ejecutada 05:47:45 05:51:04 0.06 DISPARO DESCONOCIDO
16/10/2026 Ejecutada 15:15:43 15:23:09 0.2 DISPARO DESCONOCIDO
16/10/2026 Ejecutada 15:10:56 15:15:42 0.2 DISPARO DESCONOCIDO
14/10/2026 Ejecutada 22:41:22 22:46:01 4.47 ARBOLES Y RAMA SOBRE LINEA // DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION
14/10/2026 Ejecutada 03:48:31 04:23:38 4.47 ARBOLES Y RAMA SOBRE LINEA // DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION
14/10/2026 Ejecutada 03:35:18 03:48:31 4.47 ARBOLES Y RAMA SOBRE LINEA // DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION
14/10/2026 Ejecutada 03:25:42 03:35:18 4.47 ARBOLES Y RAMA SOBRE LINEA // DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION
14/10/2026 Ejecutada 00:36:00 03:25:42 4.47 ARBOLES Y RAMA SOBRE LINEA // DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION
14/10/2026 Ejecutada 00:00:00 00:36:00 4.47 ARBOLES Y RAMA SOBRE LINEA // DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION
13/10/2026 Ejecutada 16:48:37 23:59:59 7.19 FALLAS ETED, DISPARO DE LINEA TRANSMISION
La Penda, Callejon el Resbalon, Politecnico salesiano IPISA, Guaco Los Rincones (Parcial), Guaco (Parcial) Hogar Crea, Factoría Mukai, Casa Club, las lagunas de guaco, Club Cooperativa Vega Real, Resp. Los Farayones.