Buscar Circuitos Glosario

Circuito PEND103

Distribuidora EdeNorte - Provincia La Vega


Mes-Año Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25
Clasificación B B B B B B B B B B B B
Clientes 6658 6658 6628 6643 6654 6659 6622 6632 6578 6522 6517 6481
% Nivel Cobranza 0.00% 85.04% 96.82% 91.20% 104.24% 98.99% 100.51% 109.34% 100.98% 106.86% 95.83% 88.99%
% Nivel Pérdida 0.00% 25.05% 31.67% 24.00% 31.73% 19.13% 22.89% 27.04% 17.98% 25.16% 20.98% 24.11%
Energía Suministrada (GWh) 0 3.01 2.84 2.45 2.41 2.16 2.36 2.45 2.48 2.81 2.96 3.13
Energía Facturada (GWh) 0 2.25 1.94 1.86 1.65 1.74 1.82 1.79 2.04 2.1 2.34 2.38
Energía Cobrada (GWh) 0 1.92 1.88 1.7 1.72 1.73 1.83 1.95 2.06 2.24 2.24 2.12
% Servicio 99.30% 98.87% 98.53% 98.80% 98.79% 99.37% 99.98% 97.90% 98.71% 98.72% 98.30% 96.13%
% Sin Servicio 0.70% 1.13% 1.47% 1.20% 1.21% 0.63% 0.02% 2.10% 1.29% 1.28% 1.70% 3.87%
Interrupción Programada (Hrs) 6.00 5.00 6.00 6.00 12.00 0.00 0.00 6.00 0.00 5.00 5.00 12.00
Interrupción Ejecutada (Hrs) 5.01 8.17 10.61 8.63 8.70 4.56 0.12 15.63 9.44 9.36 12.44 28.26
Promedio Interrupción Diarias (Hrs) 0.16 0.27 0.35 0.28 0.29 0.15 0.00 0.51 0.31 0.31 0.41 0.93
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito PEND103
Interrupciones Programadas 0
Interrupciones Ejecutadas 0.3
% Ejecución Operativa 0%
Detalle de Salidas - Circuito PEND103
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
12/08/2026 Ejecutada 03:16:23 03:34:24 0.3 DISPARO DESCONOCIDO
La Penda, Callejon el Resbalon, Politecnico salesiano IPISA, Guaco Los Rincones (Parcial), Guaco (Parcial) Hogar Crea, Factoría Mukai, Casa Club, las lagunas de guaco, Club Cooperativa Vega Real, Resp. Los Farayones.