Circuito PEND103

Distribuidora EdeNorte - Provincia La Vega


Mes-Año Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24
Clasificación B B B B B B B B B B B B
Clientes 6462 6462 6438 6455 6419 6413 241 6520 6520 6494 6481 6535
% Nivel Cobranza 0.00% 85.63% 102.29% 85.32% 96.62% 105.30% 93.16% 98.43% 1.09% 93.97% 93.80% 105.29%
% Nivel Pérdida 0.00% 25.17% 32.94% 11.62% 30.94% 16.85% 11.35% 26.27% 19.66% 29.08% 28.69% 30.44%
Energía Suministrada (GWh) 0 2.83 2.81 2.41 2.71 2.19 2.44 2.63 2.69 3.04 2.98 3.05
Energía Facturada (GWh) 0 2.12 1.89 2.13 1.87 1.82 2.16 1.94 2.16 2.16 2.12 2.12
Energía Cobrada (GWh) 0 1.81 1.93 1.82 1.81 1.92 2.01 1.91 0.02 2.03 1.99 2.23
% Servicio 99.85% 97.80% 98.36% 98.63% 99.76% 99.39% 99.41% 99.81% 99.34% 98.05% 97.95% 97.47%
% Sin Servicio 0.15% 2.20% 1.64% 1.37% 0.24% 0.61% 0.59% 0.19% 0.66% 1.95% 2.05% 2.53%
Interrupción Programada (Hrs) 6.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 1.12 16.03 11.97 10.03 1.75 4.44 4.30 1.39 4.79 14.25 15.00 18.49
Promedio Interrupción Diarias (Hrs) 0.04 0.53 0.39 0.33 0.06 0.15 0.14 0.05 0.16 0.47 0.49 0.61
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

La Penda, Callejon el Resbalon, Politecnico salesiano IPISA, Guaco Los Rincones (Parcial), Guaco (Parcial) Hogar Crea, Factoría Mukai, Casa Club, las lagunas de guaco, Club Cooperativa Vega Real, Resp. Los Farayones.