Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación D D D D D D D D D D D D
Clientes 1208 1200 1193 1193 1191 1183 1172 1164 1160 1158 1158 1159
% Nivel Cobranza 90.87% 97.41% 101.12% 93.25% 90.73% 94.39% 103.42% 100.72% 99.50% 104.21% 105.25% 92.26%
% Nivel Pérdida 55.36% 60.79% 60.15% 59.99% 54.84% 55.17% 57.93% 50.77% 55.22% 57.73% 58.23% 52.44%
Energía Suministrada (GWh) 0.66 0.67 0.66 0.65 0.53 0.52 0.52 0.44 0.49 0.50 0.50 0.46
Energía Facturada (GWh) 0.29 0.26 0.26 0.26 0.24 0.23 0.22 0.22 0.22 0.21 0.21 0.22
Energía Cobrada (GWh) 0.27 0.26 0.26 0.24 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.20
% Servicio 99.51% 99.58% 98.45% 99.37% 99.82% 99.82% 99.81% 99.97% 99.96% 98.92% 99.77% 100.00%
% Sin Servicio 0.49% 0.42% 1.55% 0.63% 0.18% 0.18% 0.19% 0.03% 0.04% 1.08% 0.23% 0.00%
Interrupción Programada (Hrs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 0.00 0.00
Interrupción Ejecutada (Hrs) 3.50 3.01 11.16 4.55 1.33 1.33 1.36 0.24 0.26 8.00 1.65 0.00
Promedio Interrupción Diarias (Hrs) 0.12 0.10 0.37 0.15 0.04 0.04 0.04 0.01 0.01 0.26 0.05 0.00
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito PEDE503A
Interrupciones Programadas 0
Interrupciones Ejecutadas 1.61
% Ejecución Operativa 0%
Detalle de Salidas - Circuito PEDE503A
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
22/10/2026 Ejecutada 16:15:53 16:23:49 0.13 TRASVASE DE CARGA //
20/10/2026 Ejecutada 16:35:03 16:37:39 0.04 INSTALAR TRANSFORMADOR MT/BT //
17/10/2026 Ejecutada 10:14:58 11:02:38 0.79 FALLA GENERACIÓN //
16/10/2026 Ejecutada 17:40:14 17:50:06 0.16 FALLA TRANSITORIA //
15/10/2026 Ejecutada 17:56:04 18:25:20 0.49 INSTALAR TRANSFORMADOR MT/BT //