Buscar Circuitos Glosario

Circuito PEDE503

Distribuidora EdeSur - Provincia Pedernales


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación D D D D D D D D D D D D
Clientes 533 533 535 536 535 536 538 538 765 291 417 414
% Nivel Cobranza 0.00% 95.95% 109.03% 108.24% 99.70% 97.71% 116.44% 86.89% 110.89% 98.36% 98.88% 102.05%
% Nivel Pérdida 0.00% 69.98% 59.32% 60.99% 55.10% 57.24% 58.00% 50.74% 36.80% 69.28% 68.01% 79.08%
Energía Suministrada (GWh) 0 0.63 0.46 0.45 0.39 0.43 0.44 0.43 0.4 0.38 0.47 0.67
Energía Facturada (GWh) 0 0.19 0.18 0.18 0.17 0.18 0.18 0.21 0.25 0.12 0.15 0.14
Energía Cobrada (GWh) 0 0.18 0.20 0.19 0.17 0.18 0.21 0.19 0.28 0.12 0.15 0.14
% Servicio 99.46% 98.66% 98.66% 100.00% 100.00% 99.39% 100.00% 95.23% 94.72% 95.67% 95.35% 94.20%
% Sin Servicio 0.54% 1.34% 1.34% 0.00% 0.00% 0.61% 0.00% 4.77% 5.28% 4.33% 4.65% 5.80%
Interrupción Programada (Hrs) 4.00 0.00 0.00 8.00 8.00 4.00 4.00 23.00 42.00 39.00 56.00 29.00
Interrupción Ejecutada (Hrs) 3.88 9.62 9.62 0.00 0.00 4.40 0.00 34.79 38.53 31.62 33.98 42.34
Promedio Interrupción Diarias (Hrs) 0.13 0.32 0.32 0.00 0.00 0.14 0.00 1.14 1.27 1.04 1.12 1.39
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito PEDE503
Interrupciones Programadas 6.00
Interrupciones Ejecutadas 8.25
% Ejecución Operativa 137.50%
Detalle de Salidas - Circuito PEDE503
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
03/07/2026 Programada 13:00:00 15:00:00 2.00 EN MANTENIMIENTO //
03/07/2026 Ejecutada 13:17:00 16:18:00 3.02 EN MANTENIMIENTO //
01/07/2026 Ejecutada 22:39:00 23:59:59 1.35 DETERIORO //
29/06/2026 Programada 06:00:00 08:00:00 2.00 EN MANTENIMIENTO //
29/06/2026 Ejecutada 06:49:34 10:42:10 3.88 EN MANTENIMIENTO //
26/06/2026 Programada 09:00:00 11:00:00 2.00
Savica, Centro del Pueblo de Pedernales (parcial), Los Cayucos, Los Robles, Alcoa.