Circuito PEDE503

Distribuidora EdeSur - Provincia Pedernales


Mes-Año Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24
Clasificación D D D D D B A D D D A B
Clientes 765 765 291 417 414 759 756 756 1878 1865 1870 1815
% Nivel Cobranza 0.00% 110.89% 98.36% 98.88% 102.05% 94.46% 100.08% 103.35% 100.63% 102.51% 100.47% 102.31%
% Nivel Pérdida 0.00% 36.80% 69.28% 68.01% 79.08% 65.72% 70.86% 63.95% 61.43% 60.22% 56.14% 61.05%
Energía Suministrada (GWh) 0 0.4 0.38 0.47 0.67 0.74 0.79 0.63 1.06 0.91 0.96 1.03
Energía Facturada (GWh) 0 0.25 0.12 0.15 0.14 0.25 0.23 0.23 0.41 0.36 0.42 0.4
Energía Cobrada (GWh) 0 0.28 0.12 0.15 0.14 0.24 0.23 0.24 0.41 0.37 0.43 0.41
% Servicio 95.23% 94.72% 95.67% 95.35% 94.20% 95.74% 97.35% 94.09% 96.71% 94.50% 91.39% 98.78%
% Sin Servicio 4.77% 5.28% 4.33% 4.65% 5.80% 4.26% 2.65% 5.91% 3.29% 5.50% 8.61% 1.22%
Interrupción Programada (Hrs) 23.00 42.00 39.00 56.00 29.00 4.00 7.00 6.00 3.00 18.00 42.00 3.00
Interrupción Ejecutada (Hrs) 34.79 38.53 31.62 33.98 42.34 31.12 19.32 43.18 24.02 40.17 62.83 8.92
Promedio Interrupción Diarias (Hrs) 1.14 1.27 1.04 1.12 1.39 1.02 0.64 1.42 0.79 1.32 2.07 0.29
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Savica, Centro del Pueblo de Pedernales (parcial), Los Cayucos, Los Robles, Alcoa.