Circuito PEDE502

Distribuidora EdeSur - Provincia Pedernales


Mes-Año Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24
Clasificación C C C B A C C C A B A A
Clientes 1257 1257 1254 1309 1300 1298 1300 1300 1293 1279 1281 1279
% Nivel Cobranza 0.00% 88.02% 95.59% 81.73% 105.81% 94.46% 97.63% 97.93% 105.03% 103.32% 106.55% 105.31%
% Nivel Pérdida 0.00% 47.30% 51.43% 31.87% 45.78% 42.40% 43.10% 38.20% 34.02% 37.03% 27.51% 33.45%
Energía Suministrada (GWh) 0 1.01 1.05 1.01 1.01 0.95 0.92 0.77 0.8 0.84 0.82 0.99
Energía Facturada (GWh) 0 0.53 0.51 0.69 0.55 0.55 0.52 0.47 0.53 0.53 0.59 0.66
Energía Cobrada (GWh) 0 0.47 0.49 0.56 0.58 0.52 0.51 0.46 0.55 0.55 0.63 0.69
% Servicio 94.29% 96.72% 97.20% 89.82% 95.45% 96.51% 98.42% 96.71% 92.27% 98.90% 99.16% 99.94%
% Sin Servicio 5.71% 3.28% 2.80% 10.18% 4.55% 3.49% 1.58% 3.29% 7.73% 1.10% 0.84% 0.06%
Interrupción Programada (Hrs) 49.00 21.00 7.00 42.00 26.00 7.00 6.00 21.00 45.00 3.00 3.00 3.00
Interrupción Ejecutada (Hrs) 41.72 23.97 20.42 74.32 33.25 25.45 11.52 23.98 56.45 8.03 6.10 0.45
Promedio Interrupción Diarias (Hrs) 1.37 0.79 0.67 2.44 1.09 0.84 0.38 0.79 1.86 0.26 0.20 0.01
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Bo. Miramar, Bo. Inés, Bo. Los Guayacanes, Bo. Villa Progreso, Bo. Villa del Mar, Los Robles, Villa del Mar, Militar.