Buscar Circuitos Glosario

Circuito PEDE501B

Distribuidora EdeSur - Provincia Pedernales


Mes-Año Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25
Clasificación D D D D D D D D D D D D
Clientes 806 806 805 804 803 795 789 784 784 780 778 777
% Nivel Cobranza 0.00% 89.41% 113.86% 94.77% 96.04% 92.15% 100.43% 94.81% 116.56% 91.70% 103.99% 83.10%
% Nivel Pérdida 0.00% 65.51% 62.03% 60.32% 62.74% 58.26% 62.90% 62.79% 67.43% 60.76% 64.47% 67.77%
Energía Suministrada (GWh) 0 0.67 0.55 0.54 0.56 0.47 0.52 0.53 0.52 0.53 0.58 0.65
Energía Facturada (GWh) 0 0.23 0.21 0.21 0.21 0.20 0.19 0.20 0.17 0.21 0.2 0.21
Energía Cobrada (GWh) 0 0.20 0.24 0.20 0.2 0.18 0.19 0.19 0.20 0.19 0.21 0.17
% Servicio 98.53% 99.66% 99.87% 99.87% 98.89% 99.93% 99.50% 98.96% 98.41% 98.64% 99.79% 99.53%
% Sin Servicio 1.47% 0.34% 0.13% 0.13% 1.11% 0.07% 0.50% 1.04% 1.59% 1.36% 0.21% 0.47%
Interrupción Programada (Hrs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 10.61 2.47 0.92 0.92 7.97 0.53 3.60 7.72 11.57 9.96 1.57 3.47
Promedio Interrupción Diarias (Hrs) 0.35 0.08 0.03 0.03 0.26 0.02 0.12 0.25 0.38 0.33 0.05 0.11
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito PEDE501B
Interrupciones Programadas 0
Interrupciones Ejecutadas 0.07
% Ejecución Operativa 0%
Detalle de Salidas - Circuito PEDE501B
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
12/08/2026 Ejecutada 23:40:04 23:44:31 0.07 REPOSICIÓN DE JUMPER //
Av. Duarte, Bo. José Francisco Peña Gómez