Circuito PEDE501B

Distribuidora EdeSur - Provincia Pedernales


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación D D D D D D D D D D D D
Clientes 829 822 806 806 805 804 803 795 789 784 784 780
% Nivel Cobranza 94.82% 97.44% 92.00% 89.41% 113.86% 94.77% 96.04% 92.15% 100.43% 94.81% 116.56% 91.70%
% Nivel Pérdida 63.92% 68.54% 68.74% 65.51% 62.03% 60.32% 62.74% 58.26% 62.90% 62.79% 67.43% 60.76%
Energía Suministrada (GWh) 0.77 0.79 0.78 0.67 0.55 0.54 0.56 0.47 0.52 0.53 0.52 0.53
Energía Facturada (GWh) 0.28 0.25 0.24 0.23 0.21 0.21 0.21 0.20 0.19 0.20 0.17 0.21
Energía Cobrada (GWh) 0.26 0.24 0.22 0.20 0.24 0.20 0.2 0.18 0.19 0.19 0.20 0.19
% Servicio 98.13% 99.53% 98.53% 99.66% 99.87% 99.87% 98.89% 99.93% 99.50% 98.96% 98.41% 98.64%
% Sin Servicio 1.87% 0.47% 1.47% 0.34% 0.13% 0.13% 1.11% 0.07% 0.50% 1.04% 1.59% 1.36%
Interrupción Programada (Hrs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 13.43 3.36 10.61 2.47 0.92 0.92 7.97 0.53 3.60 7.72 11.57 9.96
Promedio Interrupción Diarias (Hrs) 0.44 0.11 0.35 0.08 0.03 0.03 0.26 0.02 0.12 0.25 0.38 0.33
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito PEDE501B
Interrupciones Programadas 0
Interrupciones Ejecutadas 1.23
% Ejecución Operativa 0%
Detalle de Salidas - Circuito PEDE501B
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
22/10/2026 Ejecutada 20:06:48 20:11:00 0.07 FALLA TRANSITORIA //
17/10/2026 Ejecutada 16:16:47 16:40:24 0.58 REPOSICIÓN DE JUMPER // REPOSICIÓN DE JUMPER //
17/10/2026 Ejecutada 11:29:16 11:40:15 0.58 REPOSICIÓN DE JUMPER // REPOSICIÓN DE JUMPER //