Buscar Circuitos Glosario

Circuito PDOR101

Distribuidora EdeNorte - Provincia Puerto Plata


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación A A A A A A A A A A A A
Clientes 116 116 117 118 119 116 118 118 117 117 116 116
% Nivel Cobranza 0.00% 99.28% 99.49% 99.90% 99.52% 99.80% 100.48% 100.27% 100.83% 100.37% 99.47% 144.50%
% Nivel Pérdida 0.00% 3.06% 2.56% 13.48% -17.53% -0.76% 5.66% -1.10% -1.67% -10.21% -1.70% 13.93%
Energía Suministrada (GWh) 0 0.98 0.95 0.93 0.8 0.94 0.96 0.92 0.94 0.97 1.09 1.1
Energía Facturada (GWh) 0 0.95 0.93 0.8 0.94 0.94 0.91 0.93 0.96 1.07 1.1 0.95
Energía Cobrada (GWh) 0 0.95 0.92 0.8 0.93 0.94 0.91 0.94 0.97 1.07 1.1 1.37
% Servicio 99.95% 99.31% 100.00% 99.36% 98.49% 99.78% 100.00% 99.02% 99.90% 100.00% 100.00% 99.55%
% Sin Servicio 0.05% 0.69% 0.00% 0.64% 1.51% 0.22% 0.00% 0.98% 0.10% 0.00% 0.00% 0.45%
Interrupción Programada (Hrs) 0.00 5.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.00
Interrupción Ejecutada (Hrs) 0.36 5.00 0.00 4.61 10.86 1.55 0.00 7.12 0.70 0.00 0.00 3.32
Promedio Interrupción Diarias (Hrs) 0.01 0.16 0.00 0.15 0.36 0.05 0.00 0.23 0.02 0.00 0.00 0.11
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito PDOR101
Interrupciones Programadas 0
Interrupciones Ejecutadas 2.94
% Ejecución Operativa 0%
Detalle de Salidas - Circuito PDOR101
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
04/07/2026 Ejecutada 16:48:42 17:04:04 0.98 FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION
04/07/2026 Ejecutada 15:08:11 15:41:11 0.98 FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION
04/07/2026 Ejecutada 07:23:01 07:33:25 0.98 FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION
Hotel Village Marién, Ibero Star, Costa Dorada, El Manguito.