Circuito PAYI102

Distribuidora EdeNorte - Provincia Maria Trinidad Sanchez


Mes-Año May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24
Clasificación A A A A C C C C C C C A
Clientes 60 60 60 60 72 59 59 59 60 60 57 0
% Nivel Cobranza 0.00% 81.33% 132.06% 105.89% 259.60% 76.40% 0.23% 106.87% 96.37% 66.17% 114.71% 41.89%
% Nivel Pérdida 0.00% 77.00% 57.73% 32.67% 53.27% 41.01% 30.95% 63.57% 17.08% 48.38% 55.93% -12.93%
Energía Suministrada (GWh) 0 0.06 0.03 0.02 0.03 0.03 0.02 0.03 0.02 0.04 0.04 0.03
Energía Facturada (GWh) 0 0.01 0.01 0.02 0.01 0.02 0.01 0.01 0.02 0.02 0.02 0.03
Energía Cobrada (GWh) 0 0.01 0.02 0.02 0.04 0.01 0 0.01 0.02 0.01 0.02 0.01
% Servicio 98.84% 100.00% 99.85% 100.00% 98.88% 99.33% 98.70% 99.48% 98.92% 99.45% 98.85% 0.00%
% Sin Servicio 1.16% 0.00% 0.15% 0.00% 1.12% 0.67% 1.30% 0.52% 1.08% 0.55% 1.15% 0.00%
Interrupción Programada (Hrs) 4.00 6.00 0.00 4.00 13.00 4.00 4.00 22.00 0.00 4.00 4.00 0.00
Interrupción Ejecutada (Hrs) 8.48 0.00 1.12 0.00 8.14 4.89 9.48 3.80 7.87 4.02 8.40 0.00
Promedio Interrupción Diarias (Hrs) 0.28 0.00 0.04 0.00 0.27 0.16 0.31 0.12 0.26 0.13 0.28 0.00
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Factoría Peña Alba.