Buscar Circuitos Glosario

Circuito PART401

Distribuidora EdeNorte - Provincia Dajabon


Mes-Año Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24
Clasificación B B B B B B B B B B A A
Clientes 2083 2082 2075 2071 2055 2054 2059 2057 2050 2059 2024 2041
% Nivel Cobranza 89.15% 97.86% 87.54% 85.63% 96.27% 79.48% 91.14% 87.07% 88.01% 88.49% 92.59% 106.33%
% Nivel Pérdida 3.05% 5.55% 0.50% 12.44% 17.21% 14.06% 18.91% 9.66% 15.47% 6.87% 11.31% 14.71%
Energía Suministrada (GWh) 0.42 0.47 0.49 0.53 0.52 0.5 0.47 0.41 0.43 0.38 0.43 0.44
Energía Facturada (GWh) 0.41 0.44 0.48 0.47 0.43 0.43 0.38 0.37 0.36 0.35 0.38 0.38
Energía Cobrada (GWh) 0.36 0.43 0.42 0.4 0.41 0.34 0.35 0.32 0.32 0.31 0.35 0.4
% Servicio 97.53% 99.13% 98.07% 97.72% 97.60% 99.98% 98.58% 99.42% 99.99% 99.25% 99.80% 99.33%
% Sin Servicio 2.47% 0.87% 1.93% 2.28% 2.40% 0.02% 1.42% 0.58% 0.01% 0.75% 0.20% 0.67%
Interrupción Programada (Hrs) 5.00 0.00 5.00 0.00 8.00 0.00 6.00 4.00 0.00 5.00 0.00 4.00
Interrupción Ejecutada (Hrs) 18.00 6.38 14.10 16.61 17.51 0.14 10.35 4.22 0.09 5.47 1.43 4.87
Promedio Interrupción Diarias (Hrs) 0.59 0.21 0.46 0.55 0.58 0.00 0.34 0.14 0.00 0.18 0.05 0.16
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito PART401
Interrupciones Programadas 11
Interrupciones Ejecutadas 12.74
% Ejecución Operativa 115.82%
Detalle de Salidas - Circuito PART401
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
09/12/2025 Programada 10:00:00 16:00:00 6 MANTENIMIENTO GENERAL SUBESTACION
09/12/2025 Ejecutada 10:12:15 18:03:00 7.85 MANTENIMIENTO GENERAL SUBESTACION
03/12/2025 Programada 12:00:00 17:00:00 5 PODA PREVENTIVO
03/12/2025 Ejecutada 12:18:32 17:12:09 4.89 PODA PREVENTIVO
Partido Pueblo, Partido Arriba, Vaca Gorda, El Limón del Pino, La Culata.