Circuito PARA108
Distribuidora EdeSur - Provincia Distrito Nacional
| Mes-Año | Sep26 | Ago26 | Jul26 | Jun26 |
|---|---|---|---|---|
| Clasificación | A | A | A | A |
| Clientes | 4491 | 3941 | 0 | 0 |
| % Nivel Cobranza | 95.03% | 98.88% | 98.92% | 0.00% |
| % Nivel Pérdida | -0.49% | 7.50% | 8.94% | 100.00% |
| Energía Suministrada (GWh) | 5.83 | 5.46 | 5.42 | 0.61 |
| Energía Facturada (GWh) | 5.86 | 5.05 | 4.94 | 0 |
| Energía Cobrada (GWh) | 5.57 | 5.00 | 4.88 | 0 |
| % Servicio | 99.74% | 99.54% | 99.89% | 0.00% |
| % Sin Servicio | 0.26% | 0.46% | 0.11% | 0.00% |
| Interrupción Programada (Hrs) | 2.00 | 4.00 | 0.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 1.88 | 3.29 | 0.78 | 0.00 |
| Promedio Interrupción Diarias (Hrs) | 0.06 | 0.11 | 0.03 | 0.00 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 04/10/2026 | Ejecutada | 19:05:50 | 19:36:52 | 0.55 | FALLA TRANSITORIA // FALLA TRANSITORIA // REPOSICIÓN DE JUMPER |
| 04/10/2026 | Ejecutada | 18:28:26 | 18:28:59 | 0.55 | FALLA TRANSITORIA // FALLA TRANSITORIA // REPOSICIÓN DE JUMPER |
| 04/10/2026 | Ejecutada | 18:26:43 | 18:28:08 | 0.55 | FALLA TRANSITORIA // FALLA TRANSITORIA // REPOSICIÓN DE JUMPER |