Circuito PARA106

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24 May24
Clasificación A A A A B A A B A A A A
Clientes 175 175 175 175 173 175 175 175 175 174 174 172
% Nivel Cobranza 0.00% 100.27% 99.75% 100.94% 100.62% 99.70% 100.43% 99.72% 99.96% 100.53% 99.26% 99.75%
% Nivel Pérdida 0.00% 6.33% -11.01% -6.03% 3.39% -3.52% 6.77% -4.18% -0.11% 0.22% 0.05% 8.61%
Energía Suministrada (GWh) 0 2.05 1.8 2.03 2.21 2.14 2.26 2.09 2.19 2.22 2.16 2.23
Energía Facturada (GWh) 0 1.92 2 2.16 2.14 2.21 2.1 2.18 2.2 2.21 2.16 2.04
Energía Cobrada (GWh) 0 1.93 1.99 2.18 2.15 2.21 2.11 2.17 2.2 2.22 2.14 2.03
% Servicio 99.43% 100.00% 100.00% 100.00% 99.83% 100.00% 99.99% 100.00% 99.97% 100.00% 100.00% 100.00%
% Sin Servicio 0.57% 0.00% 0.00% 0.00% 0.17% 0.00% 0.01% 0.00% 0.03% 0.00% 0.00% 0.00%
Interrupción Programada (Hrs) 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 4.19 0.00 0.00 0.00 1.23 0.00 0.05 0.00 0.19 0.00 0.00 0.00
Promedio Interrupción Diarias (Hrs) 0.14 0.00 0.00 0.00 0.04 0.00 0.00 0.00 0.01 0.00 0.00 0.00
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Ágora Mall