Buscar Circuitos Glosario

Circuito PARA104

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación A A A A A A A A A A A A
Clientes 577 577 551 546 548 627 589 589 589 590 586 584
% Nivel Cobranza 0.00% 88.29% 92.60% 92.98% 101.00% 107.71% 105.86% 110.27% 104.16% 88.92% 93.94% 105.20%
% Nivel Pérdida 0.00% 41.95% 17.06% 19.19% 12.99% -3.94% -1.38% -17.98% 5.55% 7.47% 16.97% 15.04%
Energía Suministrada (GWh) 0 0.59 0.35 0.35 0.34 0.26 0.29 0.55 0.78 0.86 0.86 0.78
Energía Facturada (GWh) 0 0.34 0.29 0.28 0.29 0.28 0.29 0.64 0.74 0.79 0.71 0.67
Energía Cobrada (GWh) 0 0.30 0.27 0.26 0.29 0.30 0.31 0.71 0.77 0.71 0.67 0.7
% Servicio 98.17% 100.00% 100.00% 99.77% 99.34% 98.82% 98.26% 99.18% 99.76% 99.99% 99.96% 99.29%
% Sin Servicio 1.83% 0.00% 0.00% 0.23% 0.66% 1.18% 1.74% 0.82% 0.24% 0.01% 0.04% 0.71%
Interrupción Programada (Hrs) 5.00 0.00 0.00 3.00 0.00 3.00 4.00 0.00 0.00 0.00 0.00 1.00
Interrupción Ejecutada (Hrs) 13.20 0.00 0.00 1.68 4.74 8.47 12.97 5.97 1.78 0.07 0.27 5.19
Promedio Interrupción Diarias (Hrs) 0.43 0.00 0.00 0.06 0.16 0.28 0.43 0.20 0.06 0.00 0.01 0.17
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito PARA104
Interrupciones Programadas 5.00
Interrupciones Ejecutadas 3.11
% Ejecución Operativa 62.20%
Detalle de Salidas - Circuito PARA104
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
27/06/2026 Programada 08:00:00 13:00:00 5.00 TRASVASE DE CARGA //
27/06/2026 Ejecutada 08:38:13 11:44:39 3.11 TRASVASE DE CARGA //
Ens. Paraíso (parcial).