Circuito PALA104
Distribuidora EdeSur - Provincia Santo Domingo
| Mes-Año | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 | Jul25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | A | A | A | A | A | A | A | A | A | A | A | A |
| Clientes | 7 | 7 | 6 | 6 | 6 | 6 | 6 | 6 | 6 | 6 | 6 | 7 |
| % Nivel Cobranza | 0.00% | 93.81% | 96.38% | 97.01% | 97.85% | 112.10% | 100.55% | 106.42% | 103.94% | 90.96% | 105.33% | 100.26% |
| % Nivel Pérdida | 0.00% | 10.77% | 5.93% | 5.40% | -2.28% | 7.19% | -0.83% | 1.24% | -0.49% | -2.85% | 13.50% | 4.77% |
| Energía Suministrada (GWh) | 0 | 0.90 | 0.80 | 0.77 | 0.69 | 0.75 | 0.77 | 0.79 | 0.82 | 0.84 | 0.9 | 0.87 |
| Energía Facturada (GWh) | 0 | 0.80 | 0.75 | 0.73 | 0.71 | 0.69 | 0.77 | 0.78 | 0.83 | 0.86 | 0.78 | 0.83 |
| Energía Cobrada (GWh) | 0 | 0.75 | 0.73 | 0.70 | 0.69 | 0.78 | 0.78 | 0.83 | 0.86 | 0.78 | 0.82 | 0.83 |
| % Servicio | 100.00% | 99.89% | 99.89% | 99.44% | 99.25% | 99.97% | 99.43% | 99.35% | 99.06% | 99.04% | 99.68% | 100.00% |
| % Sin Servicio | 0.00% | 0.11% | 0.11% | 0.56% | 0.75% | 0.03% | 0.57% | 0.65% | 0.94% | 0.96% | 0.32% | 0.00% |
| Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 2.00 | 0.00 | 0.00 | 3.00 | 0.00 | 0.00 | 3.00 | 3.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 0.00 | 0.78 | 0.78 | 4.04 | 5.41 | 0.18 | 4.25 | 4.71 | 6.87 | 6.98 | 2.33 | 0.00 |
| Promedio Interrupción Diarias (Hrs) | 0.00 | 0.03 | 0.03 | 0.13 | 0.18 | 0.01 | 0.14 | 0.15 | 0.23 | 0.23 | 0.08 | 0.00 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 07/07/2026 | Ejecutada | 21:23:05 | 21:25:37 | 2.26 | RAMAS SOBRE LÍNEA // RAMAS SOBRE LÍNEA // RAMAS SOBRE LÍNEA |
| 07/07/2026 | Ejecutada | 20:38:11 | 21:15:32 | 2.26 | RAMAS SOBRE LÍNEA // RAMAS SOBRE LÍNEA // RAMAS SOBRE LÍNEA |
| 07/07/2026 | Ejecutada | 19:55:31 | 20:06:01 | 2.26 | RAMAS SOBRE LÍNEA // RAMAS SOBRE LÍNEA // RAMAS SOBRE LÍNEA |
| 07/07/2026 | Ejecutada | 19:44:43 | 19:55:31 | 2.26 | RAMAS SOBRE LÍNEA // RAMAS SOBRE LÍNEA // RAMAS SOBRE LÍNEA |
| 07/07/2026 | Ejecutada | 18:03:11 | 19:14:58 | 2.26 | RAMAS SOBRE LÍNEA // RAMAS SOBRE LÍNEA // RAMAS SOBRE LÍNEA |
| 07/07/2026 | Ejecutada | 18:00:39 | 18:03:10 | 2.26 | RAMAS SOBRE LÍNEA // RAMAS SOBRE LÍNEA // RAMAS SOBRE LÍNEA |
| 01/07/2026 | Ejecutada | 19:00:24 | 19:25:44 | 2.39 | APERTURA OTRO CIRCUITO // CORRECTIVO EN CONDUCTOR DE FASE // |
| 01/07/2026 | Ejecutada | 00:26:25 | 02:24:35 | 2.39 | APERTURA OTRO CIRCUITO // CORRECTIVO EN CONDUCTOR DE FASE // |