Circuito PALA101

Distribuidora EdeSur - Provincia Santo Domingo


Mes-Año Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25
Clasificación C C C C C C C A A C C C
Clientes 13232 13204 13204 13155 13116 13976 13089 13044 12968 12883 12844 12852
% Nivel Cobranza 0.00% 0.00% 34.52% 98.98% 95.21% 195.67% 30.55% 97.32% 100.14% 28.17% 102.25% 92.25%
% Nivel Pérdida 0.00% 0.00% 22.04% 29.30% 36.57% 27.10% 35.75% 33.51% 33.33% 35.65% 63.65% 28.16%
Energía Suministrada (GWh) 0 0 1.59 1.79 2.05 2.14 1.88 1.91 1.7 1.8 2.76 1.48
Energía Facturada (GWh) 0 0 1.24 1.27 1.3 1.56 1.21 1.27 1.14 1.16 1 1.07
Energía Cobrada (GWh) 0 0 0.43 1.25 1.24 3.05 0.37 1.23 1.14 0.33 1.03 0.98
% Servicio 99.87% 99.70% 98.68% 99.16% 98.25% 97.41% 99.73% 97.89% 98.38% 98.51% 99.55% 95.97%
% Sin Servicio 0.13% 0.30% 1.32% 0.84% 1.75% 2.59% 0.27% 2.11% 1.62% 1.49% 0.45% 4.03%
Interrupción Programada (Hrs) 3.00 0.00 3.00 0.00 0.00 6.00 0.00 3.00 8.00 13.00 9.00 18.00
Interrupción Ejecutada (Hrs) 0.96 2.20 9.64 6.13 12.80 18.91 1.96 15.42 11.81 10.89 3.28 29.40
Promedio Interrupción Diarias (Hrs) 0.03 0.07 0.32 0.20 0.42 0.62 0.06 0.51 0.39 0.36 0.11 0.97
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Pantoja (parcial), Villa Morada, Villa del Palmar, Palmarejo, Pantoja (parcial), Villa Flores de Pantoja, Proyecto José Contreras de Pantoja, La Redención de Pantoja, Urb. Villas de Pantoja, La Hondanada, Los Humildes de Pantoja, Planta Tratamiento de la CAASD, Proyecto INVI CEA, Prados de Pantoja, La Redención, Villa El Palmar, Residencial Don Miguel, Carrtera La Isabela (parcial), Residencial Alan.