Circuito PALA101

Distribuidora EdeSur - Provincia Santo Domingo


Mes-Año Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25
Clasificación C C C C C C C C C A A C
Clientes 5083 5083 13209 13204 13204 13155 13116 13976 13089 13044 12968 12883
% Nivel Cobranza 0.00% 42.79% 34.77% 33.22% 34.52% 98.98% 95.21% 195.67% 30.55% 97.32% 100.14% 28.17%
% Nivel Pérdida 0.00% 40.48% 25.23% 22.98% 22.04% 29.30% 36.57% 27.10% 35.75% 33.51% 33.33% 35.65%
Energía Suministrada (GWh) 0 1.34 1.47 1.52 1.59 1.79 2.05 2.14 1.88 1.91 1.7 1.8
Energía Facturada (GWh) 0 0.8 1.10 1.17 1.24 1.27 1.3 1.56 1.21 1.27 1.14 1.16
Energía Cobrada (GWh) 0 0.34 0.38 0.39 0.43 1.25 1.24 3.05 0.37 1.23 1.14 0.33
% Servicio 99.27% 98.42% 99.87% 99.70% 98.68% 99.16% 98.25% 97.41% 99.73% 97.89% 98.38% 98.51%
% Sin Servicio 0.73% 1.58% 0.13% 0.30% 1.32% 0.84% 1.75% 2.59% 0.27% 2.11% 1.62% 1.49%
Interrupción Programada (Hrs) 2.00 3.00 3.00 0.00 3.00 0.00 0.00 6.00 0.00 3.00 8.00 13.00
Interrupción Ejecutada (Hrs) 5.24 11.37 0.96 2.20 9.64 6.13 12.80 18.91 1.96 15.42 11.81 10.89
Promedio Interrupción Diarias (Hrs) 0.17 0.37 0.03 0.07 0.32 0.20 0.42 0.62 0.06 0.51 0.39 0.36
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Pantoja (parcial), Villa Morada, Villa del Palmar, Palmarejo, Pantoja (parcial), Villa Flores de Pantoja, Proyecto José Contreras de Pantoja, La Redención de Pantoja, Urb. Villas de Pantoja, La Hondanada, Los Humildes de Pantoja, Planta Tratamiento de la CAASD, Proyecto INVI CEA, Prados de Pantoja, La Redención, Villa El Palmar, Residencial Don Miguel, Carrtera La Isabela (parcial), Residencial Alan.