Buscar Circuitos Glosario

Circuito OJIV101

Distribuidora EdeSur - Provincia San Cristóbal


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación A A A A A A A A A A A A
Clientes 1 1 1 1 1 1 1 1 1 1 1 1
% Nivel Cobranza 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
% Nivel Pérdida 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% -8.75% 6.94% 7.52% -11.17% -4.86% 11.45%
Energía Suministrada (GWh) 0 0 0 0 0 0 0.57 0.56 0.58 0.51 0.61 0.67
Energía Facturada (GWh) 0 0 0 0 0 0.41 0.62 0.52 0.54 0.56 0.64 0.59
Energía Cobrada (GWh) 0 0 0 0 0.41 0 0.62 0.52 0.54 0.56 0.64 0.59
% Servicio 100.00% 100.00% 100.00% 99.19% 99.65% 100.00% 99.53% 99.93% 100.00% 99.88% 100.00% 100.00%
% Sin Servicio 0.00% 0.00% 0.00% 0.81% 0.35% 0.00% 0.47% 0.07% 0.00% 0.12% 0.00% 0.00%
Interrupción Programada (Hrs) 0.00 0.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 0.00 0.00 0.00 5.81 2.55 0.00 3.51 0.52 0.00 0.87 0.00 0.00
Promedio Interrupción Diarias (Hrs) 0.00 0.00 0.00 0.19 0.08 0.00 0.12 0.02 0.00 0.03 0.00 0.00
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito OJIV101
Interrupciones Programadas 4.00
Interrupciones Ejecutadas 5.81
% Ejecución Operativa 145.25%
Detalle de Salidas - Circuito OJIV101
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
28/03/2026 Programada 08:00:00 12:00:00 4.00 MANTENIMIENTO ETED //
28/03/2026 Ejecutada 08:19:17 14:08:00 5.81 MANTENIMIENTO ETED //
Exclusivo Pollo Cibao de Haina