Circuito NJUD701

Distribuidora EdeNorte - Provincia Montecristi


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación D D D D D D D D D D D D
Clientes 548 548 549 552 547 550 550 548 550 549 546 549
% Nivel Cobranza 0.00% 83.93% 90.57% 89.27% 79.02% 100.48% 83.34% 91.31% 96.15% 89.29% 93.29% 91.80%
% Nivel Pérdida 0.00% 26.39% 20.62% 25.88% 7.16% 21.95% 20.63% 19.90% 17.69% 25.59% 29.27% 29.15%
Energía Suministrada (GWh) 0 0.14 0.12 0.12 0.1 0.12 0.13 0.12 0.14 0.14 0.14 0.14
Energía Facturada (GWh) 0 0.1 0.1 0.09 0.09 0.09 0.1 0.1 0.11 0.1 0.1 0.1
Energía Cobrada (GWh) 0 0.09 0.09 0.08 0.07 0.1 0.08 0.09 0.11 0.09 0.09 0.09
% Servicio 99.52% 98.56% 99.53% 99.51% 98.24% 99.35% 99.22% 99.21% 98.54% 98.61% 97.99% 98.95%
% Sin Servicio 0.48% 1.44% 0.47% 0.49% 1.76% 0.65% 0.78% 0.79% 1.46% 1.39% 2.01% 1.05%
Interrupción Programada (Hrs) 0.00 5.00 5.00 5.00 0.00 0.00 0.00 5.00 0.00 5.00 0.00 0.00
Interrupción Ejecutada (Hrs) 3.49 10.38 3.36 3.54 12.68 4.66 5.79 5.74 10.66 10.15 14.70 7.66
Promedio Interrupción Diarias (Hrs) 0.11 0.34 0.11 0.12 0.42 0.15 0.19 0.19 0.35 0.33 0.48 0.25
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito NJUD701
Interrupciones Programadas 0
Interrupciones Ejecutadas 6.24
% Ejecución Operativa 0%
Detalle de Salidas - Circuito NJUD701
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
30/06/2026 Ejecutada 09:08:33 09:13:07 0.08 FALTA DE TENSION 34.5 KV
25/06/2026 Ejecutada 15:27:19 16:40:06 1.54 ANIMALES // DISPARO DESCONOCIDO 34.5 KV
25/06/2026 Ejecutada 15:23:50 15:27:16 1.54 ANIMALES // DISPARO DESCONOCIDO 34.5 KV
25/06/2026 Ejecutada 15:20:16 15:23:40 1.54 ANIMALES // DISPARO DESCONOCIDO 34.5 KV
25/06/2026 Ejecutada 02:51:34 03:04:04 1.54 ANIMALES // DISPARO DESCONOCIDO 34.5 KV
Pueblo de Nueva Judea, Los Conucos.