Circuito NISI01
Distribuidora EdeEste - Provincia La Altagracia
| Mes-Año | Jul26 | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | A | A | A | A | A | A | A | A | A | A | A | A |
| Clientes | 1654 | 1654 | 2503 | 2482 | 2483 | 2479 | 2488 | 2538 | 2468 | 2510 | 2451 | 1640 |
| % Nivel Cobranza | 0.00% | 122.28% | 71.48% | 94.41% | 102.76% | 83.98% | 106.34% | 89.33% | 87.01% | 88.36% | 83.65% | 78.94% |
| % Nivel Pérdida | 0.00% | 87.96% | 81.42% | 81.01% | 82.37% | 75.96% | 80.60% | 80.35% | 80.64% | 82.40% | 81.03% | 84.73% |
| Energía Suministrada (GWh) | 0 | 2.78 | 2.69 | 2.22 | 2.22 | 1.77 | 2.24 | 2.36 | 2.31 | 2.55 | 2.48 | 2.04 |
| Energía Facturada (GWh) | 0 | 0.33 | 0.50 | 0.42 | 0.39 | 0.43 | 0.43 | 0.46 | 0.45 | 0.45 | 0.47 | 0.31 |
| Energía Cobrada (GWh) | 0 | 0.41 | 0.36 | 0.40 | 0.40 | 0.36 | 0.46 | 0.41 | 0.39 | 0.40 | 0.39 | 0.25 |
| % Servicio | 95.76% | 97.27% | 96.57% | 95.77% | 98.35% | 96.87% | 98.18% | 99.29% | 96.40% | 97.05% | 95.16% | 98.45% |
| % Sin Servicio | 4.24% | 2.73% | 3.43% | 4.23% | 1.65% | 3.13% | 1.82% | 0.71% | 3.60% | 2.95% | 4.84% | 1.55% |
| Interrupción Programada (Hrs) | 0.00 | 6.00 | 5.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 39.00 | 26.00 | 22.00 |
| Interrupción Ejecutada (Hrs) | 30.50 | 19.68 | 24.70 | 30.43 | 11.90 | 22.55 | 13.12 | 5.27 | 26.30 | 21.52 | 35.35 | 11.33 |
| Promedio Interrupción Diarias (Hrs) | 1.00 | 0.65 | 0.81 | 1.00 | 0.39 | 0.74 | 0.43 | 0.17 | 0.86 | 0.71 | 1.16 | 0.37 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 19/08/2026 | Ejecutada | 19:18:00 | 20:23:00 | 1.83 | DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (DISPARO/AVERIAS) - RAMA SOBRE LINEA |
| 19/08/2026 | Ejecutada | 15:26:00 | 16:11:00 | 1.83 | DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (DISPARO/AVERIAS) - RAMA SOBRE LINEA |
| 13/08/2026 | Ejecutada | 09:25:00 | 15:47:00 | 6.52 | DISTRIBUCION (DISPARO/AVERIAS) - RAMA SOBRE LINEA // DISTRIBUCION (PROYECTOS) - FACILIDADES POR PROGRAMACION OTRO CTO |
| 13/08/2026 | Ejecutada | 01:34:00 | 01:43:00 | 6.52 | DISTRIBUCION (DISPARO/AVERIAS) - RAMA SOBRE LINEA // DISTRIBUCION (PROYECTOS) - FACILIDADES POR PROGRAMACION OTRO CTO |
| 12/08/2026 | Ejecutada | 23:52:00 | 23:59:00 | 7.48 | DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (DISPARO/AVERIAS) - RAMA SOBRE LINEA |
| 12/08/2026 | Ejecutada | 01:34:00 | 08:56:00 | 7.48 | DISTRIBUCION (DISPARO/AVERIAS) - SALIDA POR CIRCUITO PADRE // DISTRIBUCION (DISPARO/AVERIAS) - RAMA SOBRE LINEA |