Circuito NISI01

Distribuidora EdeEste - Provincia La Altagracia


Mes-Año Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24
Clasificación A A A A A A A A A A A A
Clientes 1881 1881 1670 1702 1664 1689 1679 1683 1682 1680 1689 1792
% Nivel Cobranza 0.00% 89.12% 93.26% 75.05% 102.11% 82.16% 96.07% 91.37% 75.63% 67.47% 91.22% 59.21%
% Nivel Pérdida 0.00% 83.36% 83.34% 80.39% 83.28% 79.43% 81.27% 80.76% 72.78% 78.36% 81.80% 75.40%
Energía Suministrada (GWh) 0 1.67 1.66 1.50 1.58 1.30 1.54 1.48 1.29 1.82 1.81 1.78
Energía Facturada (GWh) 0 0.28 0.28 0.29 0.26 0.27 0.29 0.28 0.35 0.39 0.33 0.44
Energía Cobrada (GWh) 0 0.25 0.26 0.22 0.27 0.22 0.28 0.26 0.26 0.27 0.3 0.26
% Servicio 97.00% 87.81% 92.95% 95.90% 96.68% 97.29% 91.78% 96.75% 96.20% 97.10% 98.63% 98.22%
% Sin Servicio 3.00% 12.19% 7.05% 4.10% 3.32% 2.71% 8.22% 3.25% 3.80% 2.90% 1.37% 1.78%
Interrupción Programada (Hrs) 30.00 41.00 30.00 36.00 12.00 10.00 47.00 0.00 0.00 0.00 5.00 0.00
Interrupción Ejecutada (Hrs) 21.93 88.96 51.47 29.95 24.23 19.77 60.02 23.70 27.75 21.18 10.00 12.98
Promedio Interrupción Diarias (Hrs) 0.72 2.92 1.69 0.98 0.80 0.65 1.97 0.78 0.91 0.70 0.33 0.43
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

JARDINES VERDES, LA GALLERA, BARRIO LOS CALLEJONES, CENTRO DEL PUEBLO, PUERTO RICO, SECTOR BUENOS AIRES, EL PEÑON, RAMON RAMIREZ, LOS ZUISOS, BARRIO LA MINA, BONILLA, ARROYO RANCHE, PUERTO RICO, JUAN BORT, LAS VACAMAS, CAÑA HONDA, LOS SOLARES, LOMA DE CACAO, LOS CHIVOS, SUMIDEROS, EL PAPAGAYO, LA CAÑA, SABANA DE NISIBON, LA CARRETERITA, MONO MOJAO, BARRIO EL PLAY, LAS LISAS, LOS GUINEOS, GUACO, EL FIRME.