Circuito NIBA116HEM
Distribuidora EdeNorte - Provincia Santiago
| Mes-Año | Jul26 | Jun26 | May26 |
|---|---|---|---|
| Clasificación | B | B | B |
| Clientes | 8143 | 8143 | 8143 |
| % Nivel Cobranza | 0.00% | 0.00% | 0.00% |
| % Nivel Pérdida | 0.00% | 0.00% | 0.00% |
| Energía Suministrada (GWh) | 0 | 0 | 0 |
| Energía Facturada (GWh) | 0 | 0 | 0 |
| Energía Cobrada (GWh) | 0 | 0 | 0 |
| % Servicio | 99.21% | 99.07% | 100.00% |
| % Sin Servicio | 0.79% | 0.93% | 0.00% |
| Interrupción Programada (Hrs) | 0.00 | 4.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 5.66 | 6.67 | 0.00 |
| Promedio Interrupción Diarias (Hrs) | 0.19 | 0.22 | 0.00 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 20/08/2026 | Programada | 10:00:00 | 16:00:00 | 6 | MANTENIMIENTO GENERAL SUBESTACION |
| 20/08/2026 | Ejecutada | 10:17:07 | 15:17:56 | 5.01 | MANTENIMIENTO GENERAL SUBESTACION |
| 19/08/2026 | Ejecutada | 20:34:35 | 21:04:20 | 0.76 | CORRECTIVO EN CONDUCTOR SOTERRADO // CORRECTIVO EN FUSIBLE // DISPARO DESCONOCIDO |
| 19/08/2026 | Ejecutada | 09:23:28 | 09:34:30 | 0.76 | CORRECTIVO EN CONDUCTOR SOTERRADO // CORRECTIVO EN FUSIBLE // DISPARO DESCONOCIDO |
| 19/08/2026 | Ejecutada | 01:09:16 | 01:14:16 | 0.76 | CORRECTIVO EN CONDUCTOR SOTERRADO // CORRECTIVO EN FUSIBLE // DISPARO DESCONOCIDO |
| 14/08/2026 | Ejecutada | 16:38:00 | 16:41:42 | 0.15 | PODA PREVENTIVO |
| 14/08/2026 | Ejecutada | 13:27:23 | 13:32:22 | 0.15 | PODA PREVENTIVO |