Circuito NIBA115PEK

Distribuidora EdeNorte - Provincia Santiago


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación B B B B B B B B B B B B
Clientes 11562 11562 11544 11553 11496 11571 11570 11513 11502 11455 11358 11320
% Nivel Cobranza 0.00% 91.01% 85.49% 115.61% 98.66% 96.11% 108.78% 105.32% 104.27% 95.34% 91.94% 101.33%
% Nivel Pérdida 0.00% 37.68% 31.99% 39.08% 19.73% 30.23% 34.90% 29.15% 29.86% 29.60% 37.04% 39.36%
Energía Suministrada (GWh) 0 3.36 2.8 2.68 2.3 2.74 2.88 2.92 3.25 3.39 3.62 3.43
Energía Facturada (GWh) 0 2.09 1.9 1.63 1.84 1.91 1.87 2.07 2.28 2.39 2.28 2.08
Energía Cobrada (GWh) 0 1.91 1.63 1.89 1.82 1.84 2.04 2.18 2.38 2.28 2.09 2.11
% Servicio 99.45% 98.14% 99.45% 99.39% 97.61% 99.33% 99.63% 98.42% 98.71% 98.28% 97.46% 96.49%
% Sin Servicio 0.55% 1.86% 0.55% 0.61% 2.39% 0.67% 0.37% 1.58% 1.29% 1.72% 2.54% 3.51%
Interrupción Programada (Hrs) 0.00 5.00 0.00 0.00 11.00 0.00 0.00 8.00 12.00 0.00 6.00 23.00
Interrupción Ejecutada (Hrs) 3.98 13.42 3.95 4.37 17.24 4.85 2.74 11.55 9.40 12.55 18.52 25.64
Promedio Interrupción Diarias (Hrs) 0.13 0.44 0.13 0.14 0.57 0.16 0.09 0.38 0.31 0.41 0.61 0.84
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito NIBA115PEK
Interrupciones Programadas 0
Interrupciones Ejecutadas 8.99
% Ejecución Operativa 0%
Detalle de Salidas - Circuito NIBA115PEK
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
06/07/2026 Ejecutada 20:45:23 20:48:41 0.06 DISPARO DESCONOCIDO
04/07/2026 Ejecutada 19:50:58 19:56:18 0.6 CAUSA DESCONOCIDA // SUSTITUCION TRANSFORMADOR MT
04/07/2026 Ejecutada 17:19:16 17:43:32 0.6 CAUSA DESCONOCIDA // SUSTITUCION TRANSFORMADOR MT
04/07/2026 Ejecutada 17:13:06 17:19:16 0.6 CAUSA DESCONOCIDA // SUSTITUCION TRANSFORMADOR MT
03/07/2026 Ejecutada 11:30:05 11:33:43 0.06 DISPARO DESCONOCIDO
02/07/2026 Ejecutada 17:37:39 17:42:35 0.97 APERTURA POR PROXIMIDAD CON OTRO CIRCUITO // DISPARO DESCONOCIDO // PERDIDA DE TENSION DE LA 12.5
02/07/2026 Ejecutada 17:20:54 17:30:28 0.97 APERTURA POR PROXIMIDAD CON OTRO CIRCUITO // DISPARO DESCONOCIDO // PERDIDA DE TENSION DE LA 12.5
02/07/2026 Ejecutada 17:08:58 17:17:42 0.97 APERTURA POR PROXIMIDAD CON OTRO CIRCUITO // DISPARO DESCONOCIDO // PERDIDA DE TENSION DE LA 12.5
02/07/2026 Ejecutada 16:52:13 16:56:48 0.97 APERTURA POR PROXIMIDAD CON OTRO CIRCUITO // DISPARO DESCONOCIDO // PERDIDA DE TENSION DE LA 12.5
02/07/2026 Ejecutada 16:26:12 16:45:33 0.97 APERTURA POR PROXIMIDAD CON OTRO CIRCUITO // DISPARO DESCONOCIDO // PERDIDA DE TENSION DE LA 12.5
02/07/2026 Ejecutada 02:41:17 02:46:07 0.97 APERTURA POR PROXIMIDAD CON OTRO CIRCUITO // DISPARO DESCONOCIDO // PERDIDA DE TENSION DE LA 12.5
02/07/2026 Ejecutada 00:35:20 00:41:15 0.97 APERTURA POR PROXIMIDAD CON OTRO CIRCUITO // DISPARO DESCONOCIDO // PERDIDA DE TENSION DE LA 12.5
01/07/2026 Ejecutada 09:59:02 10:02:03 0.14 COMPLETAR RAMAL POR AVERIA DE CORRECTIVO // CORRECTIVO EN CONDUCTOR SECUNDARIO
01/07/2026 Ejecutada 09:09:09 09:14:24 0.14 COMPLETAR RAMAL POR AVERIA DE CORRECTIVO // CORRECTIVO EN CONDUCTOR SECUNDARIO
Pekín, Los Multis, Amanza Tigres, Cristo Rey, Clínica La Altagracia.