Buscar Circuitos Glosario

Circuito NIBA115

Distribuidora EdeNorte - Provincia Santiago


Mes-Año Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25
Clasificación A A A A A A A A A A A A
Clientes 2822 2822 2884 2868 2867 2876 2912 2877 2878 2885 2886 2892
% Nivel Cobranza 0.00% 84.78% 119.96% 90.50% 115.26% 95.06% 113.85% 89.10% 94.00% 112.10% 89.31% 90.48%
% Nivel Pérdida 0.00% -11.65% 9.36% -30.09% 10.88% -15.63% 2.90% 0.97% -7.02% 9.46% -9.28% 0.62%
Energía Suministrada (GWh) 0 2.35 2.58 2.14 2.81 2.48 2.77 2.79 2.75 3.07 2.85 3.14
Energía Facturada (GWh) 0 2.62 2.34 2.78 2.51 2.86 2.69 2.77 2.94 2.78 3.12 3.13
Energía Cobrada (GWh) 0 2.22 2.81 2.52 2.89 2.72 3.06 2.46 2.76 3.11 2.78 2.83
% Servicio 99.86% 99.85% 99.90% 99.90% 99.55% 97.20% 99.95% 99.92% 98.52% 99.93% 99.65% 99.84%
% Sin Servicio 0.14% 0.15% 0.10% 0.10% 0.45% 2.80% 0.05% 0.08% 1.48% 0.07% 0.35% 0.16%
Interrupción Programada (Hrs) 0.00 0.00 0.00 0.00 4.00 11.00 0.00 0.00 2.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 1.02 1.11 0.75 0.71 3.25 20.16 0.33 0.56 10.77 0.54 2.54 1.18
Promedio Interrupción Diarias (Hrs) 0.03 0.04 0.02 0.02 0.11 0.66 0.01 0.02 0.35 0.02 0.08 0.04
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito NIBA115
Interrupciones Programadas 6
Interrupciones Ejecutadas 0.09
% Ejecución Operativa 1.50%
Detalle de Salidas - Circuito NIBA115
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
20/08/2026 Programada 10:00:00 16:00:00 6
14/08/2026 Ejecutada 10:21:29 10:26:44 0.09 APERTURA/CIERRE DE CIRCUITO PARA PRUEBA DE EQUIPO
COORASAN Nibaje, Estación Gas Natural Sunix, Bojos Tenería,Ochoa Pastor, Almacén de EDENORTE Las Charcas (Parcial), Los Surieles, Estación Shell, Taller Sr. Peña, Toma de Agua CORAASAN Pastor, CORAASAN Planta Reforzadora, Toma de agua Coorazan La Noriega, Arroyo Hondo Arriba, Ferreteria Ochoa Las Charcas (UNR), La Noriega.