Buscar Circuitos Glosario

Circuito NIBA104

Distribuidora EdeNorte - Provincia Santiago


Mes-Año Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25
Clasificación A A A A A A A A A A A A
Clientes 19848 19848 19774 19691 19620 19659 19576 19540 19518 19432 19352 19258
% Nivel Cobranza 0.00% 90.57% 86.65% 98.43% 105.12% 101.48% 92.01% 112.11% 102.29% 105.25% 93.59% 92.66%
% Nivel Pérdida 0.00% 20.70% 24.70% 19.41% 23.53% 6.34% 13.63% 17.88% 11.28% 11.44% 14.63% 20.77%
Energía Suministrada (GWh) 0 6.88 6.44 5.27 5.22 4.55 5.21 5.56 5.61 6.29 6.74 7.09
Energía Facturada (GWh) 0 5.45 4.85 4.25 3.99 4.26 4.5 4.56 4.98 5.57 5.75 5.62
Energía Cobrada (GWh) 0 4.94 4.2 4.18 4.19 4.32 4.14 5.12 5.09 5.86 5.38 5.21
% Servicio 98.61% 99.58% 99.10% 99.75% 99.20% 97.91% 99.63% 99.69% 98.22% 98.89% 99.82% 98.84%
% Sin Servicio 1.39% 0.42% 0.90% 0.25% 0.80% 2.09% 0.37% 0.31% 1.78% 1.11% 0.18% 1.16%
Interrupción Programada (Hrs) 7.00 0.00 6.00 0.00 0.00 5.00 0.00 0.00 0.00 5.00 0.00 5.00
Interrupción Ejecutada (Hrs) 10.00 2.99 6.50 1.83 5.76 15.03 2.63 2.28 13.03 8.07 1.31 8.50
Promedio Interrupción Diarias (Hrs) 0.33 0.10 0.21 0.06 0.19 0.49 0.09 0.07 0.43 0.27 0.04 0.28
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito NIBA104
Interrupciones Programadas 0
Interrupciones Ejecutadas 0.13
% Ejecución Operativa 0%
Detalle de Salidas - Circuito NIBA104
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
19/08/2026 Ejecutada 17:32:21 17:35:22 0.05 POSTE INCLINADO
15/08/2026 Ejecutada 09:00:14 09:04:47 0.08 DISPARO DESCONOCIDO
Cerro de Tuna (parcial), Bella Vista (Parcial), Reparto Peralta (Parcial), Corona Plaza, Cerros de Papatín, Barrio Los Billeteros, Las Aromas, Guidom, Barrio Nuevo, Productos Mamá, ISA, Herradura Gas, Optimo Gas, Alberto´s Repostería, Supermercado La Fuente Fun, Asociación Cibao.