Circuito NIBA102

Distribuidora EdeNorte - Provincia Santiago


Mes-Año Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25
Clasificación A A A A A A A A A A A A
Clientes 1227 1227 1235 1238 1237 1240 1242 1236 1241 1233 1232 1237
% Nivel Cobranza 0.00% 137.72% 47.85% 96.43% 103.04% 103.12% 100.38% 107.92% 98.18% 105.84% 99.21% 98.25%
% Nivel Pérdida 0.00% 4.59% 16.06% 2.32% 13.96% -6.80% -1.00% 6.48% -3.41% 10.61% 9.98% 8.06%
Energía Suministrada (GWh) 0 1.54 1.53 1.31 1.33 1.18 1.32 1.48 1.46 1.67 1.86 1.76
Energía Facturada (GWh) 0 1.47 1.29 1.28 1.15 1.26 1.33 1.38 1.51 1.5 1.67 1.62
Energía Cobrada (GWh) 0 2.03 0.61 1.23 1.18 1.3 1.34 1.49 1.48 1.58 1.66 1.59
% Servicio 98.84% 99.97% 99.02% 99.51% 99.98% 99.04% 99.49% 99.95% 99.17% 99.99% 99.98% 99.32%
% Sin Servicio 1.16% 0.03% 0.98% 0.49% 0.02% 0.96% 0.51% 0.05% 0.83% 0.01% 0.02% 0.68%
Interrupción Programada (Hrs) 7.00 0.00 6.00 0.00 0.00 5.00 0.00 0.00 0.00 0.00 0.00 5.00
Interrupción Ejecutada (Hrs) 8.38 0.25 7.09 3.53 0.12 6.92 3.70 0.40 6.07 0.07 0.11 4.94
Promedio Interrupción Diarias (Hrs) 0.28 0.01 0.23 0.12 0.00 0.23 0.12 0.01 0.20 0.00 0.00 0.16
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito NIBA102
Interrupciones Programadas 7
Interrupciones Ejecutadas 16.24
% Ejecución Operativa 232.00%
Detalle de Salidas - Circuito NIBA102
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
15/07/2026 Programada 09:00:00 16:00:00 7 MANTENIMIENTO GENERAL SUBESTACION
15/07/2026 Ejecutada 15:04:59 17:11:28 8.12 MANTENIMIENTO GENERAL SUBESTACION
15/07/2026 Ejecutada 09:04:03 15:04:55 8.12 MANTENIMIENTO GENERAL SUBESTACION
Centro Ciudad (Parcial), Calle 16 Agosto (Parcial), General Cabrera, Máximo Gómez, Restauración (Parcial), Independencia, La España (Parcial) La Sirena Calle El Sol y el Pola, calle Duarte (parcial).