Circuito NAGU102

Distribuidora EdeNorte - Provincia Maria Trinidad Sanchez


Mes-Año Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24 May24
Clasificación B B B B B B B B B B A B
Clientes 5084 5084 5074 5252 5001 5001 5009 5026 5047 4967 0 4949
% Nivel Cobranza 0.00% 105.34% 97.57% 90.82% 98.00% 0.85% 92.29% 85.81% 100.03% 83.96% 89.15% 90.35%
% Nivel Pérdida 0.00% 39.79% 23.97% 25.63% 7.68% 9.18% 34.93% 36.58% 15.47% 16.10% 21.36% 4.47%
Energía Suministrada (GWh) 0 1.75 1.43 1.51 1.17 1.32 2.14 2.08 1.35 1.58 1.43 1.09
Energía Facturada (GWh) 0 1.05 1.09 1.12 1.08 1.2 1.39 1.32 1.15 1.32 1.13 1.04
Energía Cobrada (GWh) 0 1.11 1.06 1.02 1.06 0.01 1.28 1.13 1.15 1.11 1 0.94
% Servicio 99.96% 99.76% 99.99% 98.09% 99.66% 97.45% 98.62% 98.28% 99.76% 99.05% 0.00% 99.41%
% Sin Servicio 0.04% 0.24% 0.01% 1.91% 0.34% 2.55% 1.38% 1.72% 0.24% 0.95% 0.00% 0.59%
Interrupción Programada (Hrs) 0.00 0.00 0.00 13.00 0.00 12.00 4.00 9.00 0.00 5.00 0.00 5.00
Interrupción Ejecutada (Hrs) 0.29 1.78 0.07 13.96 2.49 18.62 10.07 12.52 1.77 6.95 0.00 4.29
Promedio Interrupción Diarias (Hrs) 0.01 0.06 0.00 0.46 0.08 0.61 0.33 0.41 0.06 0.23 0.00 0.14
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Carretera de Nagua - Macorís, Coca Cola, Los Multis Enma Balaguer, San Jose de Villa Cumajon. UASD.