Buscar Circuitos Glosario

Circuito MVIE105

Distribuidora EdeSur - Provincia San Cristóbal


Mes-Año Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25
Clasificación C C C C C C C C C C C C
Clientes 2589 2589 2577 2585 2582 2597 3093 3062 3062 3055 2002 2004
% Nivel Cobranza 0.00% 87.65% 92.71% 95.19% 89.46% 93.52% 98.31% 100.96% 98.56% 106.42% 91.15% 89.43%
% Nivel Pérdida 0.00% 27.61% 38.20% 17.59% 22.79% 15.87% 19.25% 16.68% 20.19% 23.49% 15.20% 35.38%
Energía Suministrada (GWh) 0 1.64 1.73 1.27 1.30 1.18 1.26 1.37 1.38 1.54 1.43 1.73
Energía Facturada (GWh) 0 1.18 1.07 1.05 1.01 0.99 1.02 1.14 1.10 1.18 1.21 1.12
Energía Cobrada (GWh) 0 1.04 0.99 1.00 0.9 0.93 1.00 1.15 1.08 1.26 1.1 1
% Servicio 97.37% 99.02% 97.25% 97.25% 99.27% 98.19% 98.84% 99.58% 97.46% 98.59% 97.11% 96.95%
% Sin Servicio 2.63% 0.98% 2.75% 2.75% 0.73% 1.81% 1.16% 0.42% 2.54% 1.41% 2.89% 3.05%
Interrupción Programada (Hrs) 7.00 0.00 11.00 11.00 7.00 0.00 9.00 1.00 4.00 4.00 10.00 10.00
Interrupción Ejecutada (Hrs) 18.91 7.09 19.77 19.77 5.25 13.02 8.38 3.16 18.57 10.30 21.13 22.24
Promedio Interrupción Diarias (Hrs) 0.62 0.23 0.65 0.65 0.17 0.43 0.28 0.10 0.61 0.34 0.69 0.73
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito MVIE105
Interrupciones Programadas 4.00
Interrupciones Ejecutadas 4.15
% Ejecución Operativa 103.75%
Detalle de Salidas - Circuito MVIE105
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
15/08/2026 Ejecutada 14:17:44 14:23:43 0.10 FALLA TRANSITORIA //
12/08/2026 Programada 09:00:00 13:00:00 4.00 DIVERSAS INTERVENCIONES EN LA RED //
12/08/2026 Ejecutada 09:26:35 13:29:31 4.05 DIVERSAS INTERVENCIONES EN LA RED //
Los Multifamiliares, Colegio Canaán, San Isidro, Los Novas, El Buen Pastor, Loyola, UASD, Hospital Juan Pablo Pina, Pueblo Nuevo, Bo. Puerto Rico, Centro de la Ciudad (parcial)