Circuito MVIE105

Distribuidora EdeSur - Provincia San Cristóbal


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación C C C C C C C C C C C C
Clientes 2574 2574 2589 2589 2577 2585 2582 2597 3093 3062 3062 3055
% Nivel Cobranza 0.00% 90.71% 88.96% 87.65% 92.71% 95.19% 89.46% 93.52% 98.31% 100.96% 98.56% 106.42%
% Nivel Pérdida 0.00% 39.82% 37.98% 27.61% 38.20% 17.59% 22.79% 15.87% 19.25% 16.68% 20.19% 23.49%
Energía Suministrada (GWh) 0 2.24 2.09 1.64 1.73 1.27 1.30 1.18 1.26 1.37 1.38 1.54
Energía Facturada (GWh) 0 1.35 1.30 1.18 1.07 1.05 1.01 0.99 1.02 1.14 1.10 1.18
Energía Cobrada (GWh) 0 1.22 1.15 1.04 0.99 1.00 0.9 0.93 1.00 1.15 1.08 1.26
% Servicio 98.75% 98.62% 97.37% 99.02% 97.25% 97.25% 99.27% 98.19% 98.84% 99.58% 97.46% 98.59%
% Sin Servicio 1.25% 1.38% 2.63% 0.98% 2.75% 2.75% 0.73% 1.81% 1.16% 0.42% 2.54% 1.41%
Interrupción Programada (Hrs) 2.00 4.00 7.00 0.00 11.00 11.00 7.00 0.00 9.00 1.00 4.00 4.00
Interrupción Ejecutada (Hrs) 9.03 9.95 18.91 7.09 19.77 19.77 5.25 13.02 8.38 3.16 18.57 10.30
Promedio Interrupción Diarias (Hrs) 0.30 0.33 0.62 0.23 0.65 0.65 0.17 0.43 0.28 0.10 0.61 0.34
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito MVIE105
Interrupciones Programadas 3.00
Interrupciones Ejecutadas 3.72
% Ejecución Operativa 124.00%
Detalle de Salidas - Circuito MVIE105
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
20/10/2026 Programada 13:00:00 16:00:00 3.00
19/10/2026 Ejecutada 16:29:26 17:26:09 0.95 APERTURA OTRO CIRCUITO //
18/10/2026 Ejecutada 10:45:53 13:32:11 2.77 DISPARO LÍNEA 69 KV //
Los Multifamiliares, Colegio Canaán, San Isidro, Los Novas, El Buen Pastor, Loyola, UASD, Hospital Juan Pablo Pina, Pueblo Nuevo, Bo. Puerto Rico, Centro de la Ciudad (parcial)