Circuito MVIE101A
Distribuidora EdeSur - Provincia San Cristóbal
| Mes-Año | Sep26 | Ago26 | Jul26 | Jun26 | May26 | Abr26 |
|---|---|---|---|---|---|---|
| Clasificación | D | D | D | D | D | D |
| Clientes | 1 | 1 | 1 | 1 | 1 | 1 |
| % Nivel Cobranza | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| % Nivel Pérdida | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Energía Suministrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
| Energía Facturada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
| Energía Cobrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
| % Servicio | 95.28% | 96.36% | 98.71% | 100.00% | 100.00% | 100.00% |
| % Sin Servicio | 4.72% | 3.64% | 1.29% | 0.00% | 0.00% | 0.00% |
| Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 34.00 | 26.19 | 9.26 | 0.00 | 0.00 | 0.00 |
| Promedio Interrupción Diarias (Hrs) | 1.12 | 0.86 | 0.30 | 0.00 | 0.00 | 0.00 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 16/10/2026 | Ejecutada | 11:31:48 | 13:14:28 | 1.71 | REPOSICIÓN DE JUMPER // |
| 10/10/2026 | Ejecutada | 19:32:41 | 19:39:17 | 0.79 | INSTALAR TRANSFORMADOR MT/BT // FALLA TRANSITORIA // |
| 10/10/2026 | Ejecutada | 10:18:09 | 10:58:44 | 0.79 | INSTALAR TRANSFORMADOR MT/BT // FALLA TRANSITORIA // |