Buscar Circuitos Glosario

Circuito MP6903

Distribuidora EdeEste - Provincia Monte Plata


Mes-Año Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25
Clasificación A A A A A A A A A A A A
Clientes 220 220 219 219 219 219 217 219 177 173 174 171
% Nivel Cobranza 0.00% 107.72% 61.95% 92.21% 118.60% 60.50% 113.14% 102.13% 216.15% 67.03% 108.46% 90.24%
% Nivel Pérdida 0.00% 353.08% 332.47% 563.47% -4.69% 12.97% 215.19% 193.66% -41.10% 2159.74% 4.22% -252.41%
Energía Suministrada (GWh) 0 -0.04 -0.05 -0.02 0.06 0.06 -0.05 -0.07 0.04 -0.01 0.07 0.02
Energía Facturada (GWh) 0 0.10 0.11 0.10 0.07 0.06 0.06 0.06 0.06 0.15 0.06 0.07
Energía Cobrada (GWh) 0 0.11 0.07 0.10 0.08 0.03 0.07 0.06 0.13 0.10 0.07 0.06
% Servicio 94.34% 96.19% 98.31% 96.70% 99.91% 98.02% 99.88% 97.59% 96.21% 98.94% 98.45% 98.26%
% Sin Servicio 5.66% 3.81% 1.69% 3.30% 0.09% 1.98% 0.12% 2.41% 3.79% 1.06% 1.55% 1.74%
Interrupción Programada (Hrs) 9.00 6.00 12.00 12.00 6.00 12.00 0.00 6.00 17.00 4.00 0.00 6.00
Interrupción Ejecutada (Hrs) 40.78 27.45 12.18 23.75 0.67 14.28 0.90 17.90 27.70 7.73 11.30 12.68
Promedio Interrupción Diarias (Hrs) 1.34 0.90 0.40 0.78 0.02 0.47 0.03 0.59 0.91 0.25 0.37 0.42
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito MP6903
Interrupciones Programadas 12.00
Interrupciones Ejecutadas 5.60
% Ejecución Operativa 46.67%
Detalle de Salidas - Circuito MP6903
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
18/08/2026 Ejecutada 20:40:00 21:03:00 0.38 TRANSMISION - SALIDA DE LINEA 138 KV
17/08/2026 Programada 09:20:00 15:20:00 6.00
12/08/2026 Programada 10:20:00 16:20:00 6.00 DISTRIBUCION (MANTTO. PREV.) - MANTTO. PREV. EN CONDUCTOR
12/08/2026 Ejecutada 10:13:00 15:26:00 5.22 DISTRIBUCION (MANTTO. PREV.) - MANTTO. PREV. EN CONDUCTOR
PRIMER ALTO, INDU PALMA, KM 5, KM 12, KM 11, EL 10, CRUCE DE BOMBON, BOMBON.