Circuito MOCN103

Distribuidora EdeNorte - Provincia Espaillat


Mes-Año Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24 May24
Clasificación C C C B B B B B B B A B
Clientes 8234 8234 8208 7805 8112 8112 8137 8094 8105 8118 0 8081
% Nivel Cobranza 0.00% 95.02% 94.85% 94.28% 100.98% 0.52% 84.68% 91.93% 87.93% 91.21% 84.23% 93.57%
% Nivel Pérdida 0.00% 35.92% 25.62% 23.06% 35.12% 26.75% 31.01% 34.03% 36.54% 36.10% 32.44% 35.21%
Energía Suministrada (GWh) 0 3.28 2.73 2.9 3.28 3.15 3.9 3.73 3.91 3.77 3.38 3.31
Energía Facturada (GWh) 0 2.1 2.03 2.23 2.13 2.31 2.69 2.46 2.48 2.41 2.29 2.15
Energía Cobrada (GWh) 0 2 1.92 2.11 2.15 0.01 2.28 2.26 2.18 2.2 1.92 2.01
% Servicio 98.25% 98.19% 99.25% 94.79% 99.87% 99.90% 97.79% 99.38% 99.86% 98.64% 0.00% 94.81%
% Sin Servicio 1.75% 1.81% 0.75% 5.21% 0.13% 0.10% 2.21% 0.62% 0.14% 1.36% 0.00% 5.19%
Interrupción Programada (Hrs) 5.00 5.00 0.00 37.00 0.00 0.00 0.00 0.00 0.00 8.00 0.00 16.00
Interrupción Ejecutada (Hrs) 12.77 13.23 5.49 38.06 0.92 0.73 16.14 4.54 0.99 9.92 0.00 37.88
Promedio Interrupción Diarias (Hrs) 0.42 0.43 0.18 1.25 0.03 0.02 0.53 0.15 0.03 0.33 0.00 1.25
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Don Bosco, Villa Elsa, Hincha Y Entradas, Hospital Moca, La Piragua, Res Mary Carmen, La Soledad (El Caimito) Hasta La Fab de Embutido, Res Ambar, Camino Los Hilarios Y Callejon Martin 2, Cayetano Germosen, La Chancleta, La Gallera, El Piojillo, El Picachu, Zafarraya Parcial, Entrada Monte Adentro, Entrada Los Brito, Cayo Baez, Barrio Elias, Urb. Sanchez, Urb. Hnos. Rojas, La Guama, Las Uvas, Pacial, Sabana de Los Jimenez Parcial.