Circuito MOCN103

Distribuidora EdeNorte - Provincia Espaillat


Mes-Año Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25
Clasificación C C C C C C C C C C C C
Clientes 8477 8477 8455 8445 8386 8348 8328 8288 8284 8276 8234 8208
% Nivel Cobranza 0.00% 106.65% 99.31% 97.27% 93.06% 87.52% 92.46% 149.83% 68.09% 88.05% 95.02% 94.85%
% Nivel Pérdida 0.00% 38.33% 31.45% 32.10% 32.55% 37.44% 38.61% 61.46% 10.71% 25.93% 35.92% 25.62%
Energía Suministrada (GWh) 0 3.39 3.38 3.76 4.02 4.2 4.03 3.57 3.49 2.95 3.28 2.73
Energía Facturada (GWh) 0 2.09 2.32 2.55 2.71 2.63 2.47 1.37 3.12 2.18 2.1 2.03
Energía Cobrada (GWh) 0 2.23 2.3 2.48 2.52 2.3 2.29 2.06 2.12 1.92 2 1.92
% Servicio 99.71% 99.84% 98.67% 99.22% 98.31% 98.99% 99.93% 99.25% 99.75% 98.25% 98.19% 99.25%
% Sin Servicio 0.29% 0.16% 1.33% 0.78% 1.69% 1.01% 0.07% 0.75% 0.25% 1.75% 1.81% 0.75%
Interrupción Programada (Hrs) 5.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 0.00 5.00 5.00 0.00
Interrupción Ejecutada (Hrs) 2.07 1.17 9.68 5.66 12.31 7.40 0.49 5.51 1.83 12.77 13.23 5.49
Promedio Interrupción Diarias (Hrs) 0.07 0.04 0.32 0.19 0.40 0.24 0.02 0.18 0.06 0.42 0.43 0.18
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Don Bosco, Villa Elsa, Hincha Y Entradas, Hospital Moca, La Piragua, Res Mary Carmen, La Soledad (El Caimito) Hasta La Fab de Embutido, Res Ambar, Camino Los Hilarios Y Callejon Martin 2, Cayetano Germosen, La Chancleta, La Gallera, El Piojillo, El Picachu, Zafarraya Parcial, Entrada Monte Adentro, Entrada Los Brito, Cayo Baez, Barrio Elias, Urb. Sanchez, Urb. Hnos. Rojas, La Guama, Las Uvas, Pacial, Sabana de Los Jimenez Parcial.