Circuito MOCA103ERM
Distribuidora EdeNorte - Provincia Espaillat
| Mes-Año | Sep26 | Ago26 | Jul26 | Jun26 | May26 |
|---|---|---|---|---|---|
| Clasificación | A | A | A | A | A |
| Clientes | 4420 | 4420 | 4420 | 4420 | 1 |
| % Nivel Cobranza | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| % Nivel Pérdida | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Energía Suministrada (GWh) | 0 | 0 | 0 | 0 | 0 |
| Energía Facturada (GWh) | 0 | 0 | 0 | 0 | 0 |
| Energía Cobrada (GWh) | 0 | 0 | 0 | 0 | 0 |
| % Servicio | 98.70% | 98.68% | 99.52% | 97.77% | 99.79% |
| % Sin Servicio | 1.30% | 1.32% | 0.48% | 2.23% | 0.21% |
| Interrupción Programada (Hrs) | 0.00 | 1.00 | 6.00 | 11.00 | 5.00 |
| Interrupción Ejecutada (Hrs) | 9.36 | 9.53 | 3.46 | 16.06 | 1.53 |
| Promedio Interrupción Diarias (Hrs) | 0.31 | 0.31 | 0.11 | 0.53 | 0.05 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 20/10/2026 | Programada | 14:00:00 | 15:00:00 | 1 | APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PERDIDA DE TENSION DE LA 12.5 |
| 20/10/2026 | Programada | 09:00:00 | 09:00:00 | 1 | APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PERDIDA DE TENSION DE LA 12.5 |
| 20/10/2026 | Ejecutada | 18:47:03 | 19:05:04 | 3.89 | APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PERDIDA DE TENSION DE LA 12.5 |
| 20/10/2026 | Ejecutada | 17:59:13 | 18:47:03 | 3.89 | APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PERDIDA DE TENSION DE LA 12.5 |
| 20/10/2026 | Ejecutada | 16:54:37 | 17:28:00 | 3.89 | APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PERDIDA DE TENSION DE LA 12.5 |
| 20/10/2026 | Ejecutada | 15:30:08 | 15:49:39 | 3.89 | APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PERDIDA DE TENSION DE LA 12.5 |
| 20/10/2026 | Ejecutada | 11:44:11 | 12:26:47 | 3.89 | APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PERDIDA DE TENSION DE LA 12.5 |
| 20/10/2026 | Ejecutada | 09:22:10 | 10:34:05 | 3.89 | APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PERDIDA DE TENSION DE LA 12.5 |
| 19/10/2026 | Ejecutada | 23:08:24 | 23:30:15 | 0.36 | CORRECTIVO EN CONDUCTOR SECUNDARIO |
| 16/10/2026 | Ejecutada | 20:32:31 | 20:38:04 | 0.09 | DISPARO DESCONOCIDO |
| 15/10/2026 | Ejecutada | 20:44:01 | 20:49:17 | 0.09 | CORRECTIVO EN CONDUCTOR SECUNDARIO |
| 14/10/2026 | Ejecutada | 00:00:00 | 00:44:41 | 0.75 | FALLAS ETED, DISPARO DE LINEA TRANSMISION |
| 13/10/2026 | Ejecutada | 19:19:06 | 23:59:59 | 4.68 | FALLAS ETED, DISPARO DE LINEA TRANSMISION |