Circuito MOCA102SAR

Distribuidora EdeNorte - Provincia Espaillat


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación D D D D D D D D D D D D
Clientes 1354 1354 1337 1337 1339 1336 1327 1311 1317 1312 1307 1297
% Nivel Cobranza 0.00% 83.53% 106.95% 92.13% 80.08% 102.33% 99.56% 99.90% 96.31% 180.10% 77.36% 105.46%
% Nivel Pérdida 0.00% 47.79% 55.33% 51.03% 52.67% 46.61% 52.95% 39.50% 46.53% 49.50% 29.84% 46.02%
Energía Suministrada (GWh) 0 0.8 0.77 0.7 0.69 0.57 0.57 0.5 0.56 0.58 0.59 0.63
Energía Facturada (GWh) 0 0.42 0.35 0.34 0.33 0.31 0.27 0.3 0.3 0.29 0.41 0.34
Energía Cobrada (GWh) 0 0.35 0.37 0.32 0.26 0.31 0.27 0.3 0.29 0.53 0.32 0.36
% Servicio 99.01% 94.96% 95.24% 93.02% 95.21% 94.01% 99.44% 98.98% 99.34% 97.74% 98.13% 94.96%
% Sin Servicio 0.99% 5.04% 4.76% 6.98% 4.79% 5.99% 0.56% 1.02% 0.66% 2.26% 1.87% 5.04%
Interrupción Programada (Hrs) 6.00 68.00 66.00 66.00 54.00 43.00 0.00 0.00 5.00 0.00 0.00 28.00
Interrupción Ejecutada (Hrs) 7.11 36.27 34.24 50.24 34.48 43.16 4.02 7.36 4.77 16.83 13.66 36.82
Promedio Interrupción Diarias (Hrs) 0.23 1.19 1.13 1.65 1.13 1.42 0.13 0.24 0.16 0.55 0.45 1.21
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito MOCA102SAR
Interrupciones Programadas 2
Interrupciones Ejecutadas 37.25
% Ejecución Operativa 1862.50%
Detalle de Salidas - Circuito MOCA102SAR
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
22/10/2026 Ejecutada 08:41:01 08:49:19 0.14 DISPARO DESCONOCIDO
20/10/2026 Programada 14:00:00 15:00:00 1 APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION
20/10/2026 Programada 09:00:00 09:00:00 1 APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION
20/10/2026 Ejecutada 18:26:24 18:35:13 7.33 APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION
20/10/2026 Ejecutada 17:56:06 18:26:24 7.33 APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION
20/10/2026 Ejecutada 16:56:23 17:24:44 7.33 APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION
20/10/2026 Ejecutada 11:47:00 16:56:23 7.33 APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION
20/10/2026 Ejecutada 09:23:06 10:26:00 7.33 APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION
15/10/2026 Ejecutada 17:24:09 17:28:47 0.23 DISPARO DESCONOCIDO
15/10/2026 Ejecutada 11:10:53 11:19:57 0.23 DISPARO DESCONOCIDO
Santa Rosa, Camino La Soledad, Carretera La Guazuma, Carretera Santa Rosa Parcial, Tierra Dura.