Buscar Circuitos Glosario

Circuito METR109

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación A A A A A A A A A A A A
Clientes 1 2 2 2 2 2 2 2 2 2 2 2
% Nivel Cobranza 420.90% 0.19% 0.33% 54.02% 46.71% 93.24% 66.19% 100.00% 1219.31% 0.66% 0.06% 100.00%
% Nivel Pérdida -96.19% -26.09% 49.33% 16.82% 27.99% 9.26% -4.55% 6.35% -3.21% -12.91% -619.05% 99.58%
Energía Suministrada (GWh) 0.33 1.18 1.20 0.75 0.47 0.17 0.14 0.10 0.09 0.12 0.14 0.15
Energía Facturada (GWh) 0.64 1.48 0.61 0.63 0.34 0.16 0.14 0.10 0.10 0.14 1.04 0.00
Energía Cobrada (GWh) 2.71 0.00 0.00 0.34 0.16 0.14 0.10 0.10 1.17 0.00 0.00 0.00
% Servicio 100.00% 99.19% 99.07% 99.71% 99.69% 99.69% 99.06% 98.63% 99.35% 99.01% 98.55% 99.76%
% Sin Servicio 0.00% 0.81% 0.93% 0.29% 0.31% 0.31% 0.94% 1.37% 0.65% 0.99% 1.45% 0.24%
Interrupción Programada (Hrs) 0.00 5.00 2.00 0.00 0.00 0.00 3.00 0.00 5.00 5.00 0.00 0.00
Interrupción Ejecutada (Hrs) 0.00 5.81 6.72 2.11 2.25 2.25 6.76 9.86 4.66 7.33 10.58 1.75
Promedio Interrupción Diarias (Hrs) 0.00 0.19 0.22 0.07 0.07 0.07 0.22 0.32 0.15 0.24 0.35 0.06
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito METR109
Interrupciones Programadas 2.00
Interrupciones Ejecutadas 2.25
% Ejecución Operativa 112.50%
Detalle de Salidas - Circuito METR109
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
12/10/2026 Programada 07:00:00 09:00:00 2.00 MANTENIMIENTO ETED //
12/10/2026 Ejecutada 07:13:34 09:28:24 2.25 MANTENIMIENTO ETED //
Centro Olímpico.