Circuito METR105

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25
Clasificación A A A A A A A A A A A A
Clientes 3884 3884 4195 4211 4211 4215 4217 4204 4211 4216 4207 4208
% Nivel Cobranza 0.00% 106.08% 91.97% 105.98% 104.10% 101.15% 97.09% 98.33% 99.67% 97.35% 99.74% 98.66%
% Nivel Pérdida 0.00% -2.91% -10.47% 6.39% 8.36% 4.38% 3.04% 12.57% 13.98% 6.01% 16.07% 3.52%
Energía Suministrada (GWh) 0 3.10 3.43 4.62 4.58 4.84 5.1 5.48 5.29 4.87 5.02 4.48
Energía Facturada (GWh) 0 3.19 3.78 4.32 4.20 4.62 4.95 4.79 4.55 4.57 4.22 4.32
Energía Cobrada (GWh) 0 3.39 3.48 4.58 4.37 4.68 4.8 4.71 4.54 4.45 4.21 4.26
% Servicio 99.42% 98.92% 99.43% 99.21% 98.82% 99.76% 100.00% 99.97% 99.56% 99.97% 99.42% 99.49%
% Sin Servicio 0.58% 1.08% 0.57% 0.79% 1.18% 0.24% 0.00% 0.03% 0.44% 0.03% 0.58% 0.51%
Interrupción Programada (Hrs) 3.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 0.00 0.00 3.00 8.00
Interrupción Ejecutada (Hrs) 4.20 7.80 4.11 5.86 8.63 1.75 0.00 0.20 3.22 0.20 4.26 3.72
Promedio Interrupción Diarias (Hrs) 0.14 0.26 0.14 0.19 0.28 0.06 0.00 0.01 0.11 0.01 0.14 0.12
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Plaza de la Salud, Defensa Civil, Periódico Hoy, El Nacional, Centro Cristiano de Servicos Médicos, CEDIMAT, Naco (Parcial): Heriberto Pieter desde la Ortega y Gasset hasta la Tiradentes, Dr. Perdomo desde la Heriberto Pieter hasta la prox. la PTE. González, C/Gracita Álvarez entre C/Presidente González y C/Heriberto Pieter, C/Dr. Luis Lembert Peguero entre C/Heriberto Pieter y C/Presidente González, C/Del Carmen entre C/Heriberto Pieter y C/Orlando Martínez, Plaza Metropolitana, Ensanche La Fe (parcial), Ens. Kennedy.