Circuito METR103

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24
Clasificación A A A A A A A A A A A A
Clientes 0 1845 1842 1834 1828 1819 1816 1811 1798 1798 1794 1772
% Nivel Cobranza 103.33% 108.96% 92.06% 91.23% 112.78% 89.66% 104.26% 89.19% 103.02% 98.02% 102.86% 115.35%
% Nivel Pérdida 99.19% 4.91% 3.61% 11.15% 14.58% 3.34% 20.13% 1.90% 18.04% 0.70% 9.08% 9.79%
Energía Suministrada (GWh) 1.40 3.17 3.36 3.45 3.32 3.1 3.14 2.71 2.94 2.42 2.7 2.87
Energía Facturada (GWh) 0.01 3.02 3.24 3.07 2.84 3 2.51 2.66 2.41 2.41 2.45 2.59
Energía Cobrada (GWh) 0.01 3.29 2.98 2.8 3.2 2.69 2.61 2.37 2.48 2.36 2.52 2.98
% Servicio 0.00% 99.49% 99.84% 99.21% 99.25% 99.86% 99.81% 99.16% 99.88% 99.10% 99.99% 99.89%
% Sin Servicio 0.00% 0.51% 0.16% 0.79% 0.75% 0.14% 0.19% 0.84% 0.12% 0.90% 0.01% 0.11%
Interrupción Programada (Hrs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 0.00 0.00 1.00 0.00
Interrupción Ejecutada (Hrs) 0.00 3.70 1.17 5.75 5.50 1.00 1.38 6.15 0.88 6.53 0.05 0.79
Promedio Interrupción Diarias (Hrs) 0.00 0.12 0.04 0.19 0.18 0.03 0.05 0.20 0.03 0.21 0.00 0.03
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Av. San Martín entre C/Lic. Tomás Mejía y Cotes y, Naco (Parcial), C/Padre Fantino Falco, C/Padre Fantino Falco desde Av. Tiradentes hasta Av. Ortega y Gasset, C/Sócrates Nolasco, C/Silvestre Aybar, C/Orlando Martínez, Centro de Entrenamiento ADOPEN, C/Interior A. Naco (Parcial): C/Padre Fantino Falco hasta la Av. Tiradentes, Av. Tiradentes desde la C/Padre Fantino Falco hasta la C/Presidente González, Plaza Naco, Hotel Radisson, C/Santa María, C/Naco 2 (detrás de Galerías de Naco), Galerías de Naco, Desarrollo RDC (Hotel Embassy Suite Hilton), Av. Lope de Vega desde la C/Padre Fantino Falco hasta antes de la C/Carlos Sánchez y Sánchez, Centro Cuesta Nacional (Lope de Vega)