Circuito METR102A
Distribuidora EdeSur - Provincia Distrito Nacional
Mes-Año | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 | Sep24 | Ago24 |
---|---|---|---|---|---|---|---|---|---|
Clasificación | A | A | A | A | A | A | A | A | A |
Clientes | 882 | 882 | 883 | 883 | 885 | 886 | 880 | 1 | 1 |
% Nivel Cobranza | 0.00% | 107.96% | 93.24% | 109.49% | 114.57% | 88.20% | 0.00% | 0.00% | 0.00% |
% Nivel Pérdida | 0.00% | 9.20% | -10.90% | 1.98% | -1.20% | -10.53% | 0.00% | 0.00% | 0.00% |
Energía Suministrada (GWh) | 0 | 1.42 | 1.23 | 1.36 | 1.46 | 1.43 | 0 | 0 | 0 |
Energía Facturada (GWh) | 0 | 1.29 | 1.36 | 1.34 | 1.47 | 1.58 | 0 | 0 | 0 |
Energía Cobrada (GWh) | 0 | 1.4 | 1.27 | 1.46 | 1.69 | 1.39 | 0 | 0 | 0 |
% Servicio | 99.58% | 100.00% | 100.00% | 99.99% | 100.00% | 99.80% | 100.00% | 99.70% | 100.00% |
% Sin Servicio | 0.42% | 0.00% | 0.00% | 0.01% | 0.00% | 0.20% | 0.00% | 0.30% | 0.00% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 1.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 3.06 | 0.00 | 0.00 | 0.08 | 0.00 | 1.44 | 0.02 | 2.20 | 0.00 |
Promedio Interrupción Diarias (Hrs) | 0.10 | 0.00 | 0.00 | 0.00 | 0.00 | 0.05 | 0.00 | 0.07 | 0.00 |
C/ Carlos Sánchez y Sánchez, Prol. Sierva de María, Ramón Corripio, Av. Lope de Vega (parcial).