Circuito METR102A

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24
Clasificación A A A A A A A A A A A A
Clientes 900 899 893 887 887 885 884 881 882 883 883 885
% Nivel Cobranza 96.99% 101.62% 96.84% 96.98% 101.64% 93.35% 99.24% 93.42% 107.96% 93.24% 109.49% 114.57%
% Nivel Pérdida -23.01% -9.02% -6.73% 2.17% 4.81% -2.63% 9.86% -6.05% 9.20% -10.90% 1.98% -1.20%
Energía Suministrada (GWh) 1.32 1.57 1.62 1.67 1.62 1.51 1.54 1.34 1.42 1.23 1.36 1.46
Energía Facturada (GWh) 1.63 1.71 1.73 1.63 1.55 1.55 1.39 1.43 1.29 1.36 1.34 1.47
Energía Cobrada (GWh) 1.58 1.74 1.67 1.58 1.57 1.45 1.38 1.33 1.4 1.27 1.46 1.69
% Servicio 100.00% 100.00% 100.00% 99.61% 100.00% 99.97% 99.99% 99.58% 100.00% 100.00% 99.99% 100.00%
% Sin Servicio 0.00% 0.00% 0.00% 0.39% 0.00% 0.03% 0.01% 0.42% 0.00% 0.00% 0.01% 0.00%
Interrupción Programada (Hrs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00
Interrupción Ejecutada (Hrs) 0.00 0.00 0.00 2.81 0.00 0.20 0.08 3.06 0.00 0.00 0.08 0.00
Promedio Interrupción Diarias (Hrs) 0.00 0.00 0.00 0.09 0.00 0.01 0.00 0.10 0.00 0.00 0.00 0.00
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito METR102A
Interrupciones Programadas 0
Interrupciones Ejecutadas 2.81
% Ejecución Operativa 0%
Detalle de Salidas - Circuito METR102A
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
26/08/2025 Ejecutada 11:17:28 14:06:20 2.81 SOBRECARGA TRANSFORMADOR DE POTENCIA //
C/ Carlos Sánchez y Sánchez, Prol. Sierva de María, Ramón Corripio, Av. Lope de Vega (parcial).