Circuito MATA101

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24 May24
Clasificación B B B A A A A A A A A A
Clientes 9498 9498 9508 9505 9464 9482 9488 9486 9486 7737 7725 7715
% Nivel Cobranza 0.00% 117.99% 92.05% 103.34% 115.71% 97.51% 97.04% 94.58% 95.95% 102.46% 106.30% 80.21%
% Nivel Pérdida 0.00% 25.26% 6.76% 15.61% 17.00% -0.90% 16.99% 14.28% 21.61% 18.17% 16.94% 26.18%
Energía Suministrada (GWh) 0 4.09 3.34 3.75 4 3.87 5.15 4.91 5.19 4.89 4.76 4.63
Energía Facturada (GWh) 0 3.06 3.12 3.17 3.32 3.91 4.28 4.21 4.07 4 3.96 3.41
Energía Cobrada (GWh) 0 3.61 2.87 3.27 3.84 3.81 4.15 3.98 3.91 4.1 4.21 2.74
% Servicio 99.94% 99.76% 99.87% 99.95% 99.98% 99.61% 98.79% 98.99% 97.59% 99.27% 98.46% 99.93%
% Sin Servicio 0.06% 0.24% 0.13% 0.05% 0.02% 0.39% 1.21% 1.01% 2.41% 0.73% 1.54% 0.07%
Interrupción Programada (Hrs) 0.00 0.00 4.00 1.00 0.00 10.00 3.00 0.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 0.41 1.73 0.98 0.36 0.16 2.81 8.85 7.41 17.57 5.30 11.23 0.52
Promedio Interrupción Diarias (Hrs) 0.01 0.06 0.03 0.01 0.01 0.09 0.29 0.24 0.58 0.17 0.37 0.02
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Barrio San José, La Lotería, Buenos Aires de la Independencia, Centro Cuesta Nacional (Independencia), Nordesa I, Nordesa II, Nordesa III, El Coral, Miramar, Casa España, Costa Caribe, El Invi de la Sánchez, Velazcasas, Urb. Independencia, Res. María Josefina, Res. Gacela,