Circuito MATA101
Distribuidora EdeSur - Provincia Distrito Nacional
Mes-Año | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 | Sep24 | Ago24 | Jul24 | Jun24 | May24 |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Clasificación | B | B | B | A | A | A | A | A | A | A | A | A |
Clientes | 9498 | 9498 | 9508 | 9505 | 9464 | 9482 | 9488 | 9486 | 9486 | 7737 | 7725 | 7715 |
% Nivel Cobranza | 0.00% | 117.99% | 92.05% | 103.34% | 115.71% | 97.51% | 97.04% | 94.58% | 95.95% | 102.46% | 106.30% | 80.21% |
% Nivel Pérdida | 0.00% | 25.26% | 6.76% | 15.61% | 17.00% | -0.90% | 16.99% | 14.28% | 21.61% | 18.17% | 16.94% | 26.18% |
Energía Suministrada (GWh) | 0 | 4.09 | 3.34 | 3.75 | 4 | 3.87 | 5.15 | 4.91 | 5.19 | 4.89 | 4.76 | 4.63 |
Energía Facturada (GWh) | 0 | 3.06 | 3.12 | 3.17 | 3.32 | 3.91 | 4.28 | 4.21 | 4.07 | 4 | 3.96 | 3.41 |
Energía Cobrada (GWh) | 0 | 3.61 | 2.87 | 3.27 | 3.84 | 3.81 | 4.15 | 3.98 | 3.91 | 4.1 | 4.21 | 2.74 |
% Servicio | 99.94% | 99.76% | 99.87% | 99.95% | 99.98% | 99.61% | 98.79% | 98.99% | 97.59% | 99.27% | 98.46% | 99.93% |
% Sin Servicio | 0.06% | 0.24% | 0.13% | 0.05% | 0.02% | 0.39% | 1.21% | 1.01% | 2.41% | 0.73% | 1.54% | 0.07% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 4.00 | 1.00 | 0.00 | 10.00 | 3.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 0.41 | 1.73 | 0.98 | 0.36 | 0.16 | 2.81 | 8.85 | 7.41 | 17.57 | 5.30 | 11.23 | 0.52 |
Promedio Interrupción Diarias (Hrs) | 0.01 | 0.06 | 0.03 | 0.01 | 0.01 | 0.09 | 0.29 | 0.24 | 0.58 | 0.17 | 0.37 | 0.02 |
Barrio San José, La Lotería, Buenos Aires de la Independencia, Centro Cuesta Nacional (Independencia), Nordesa I, Nordesa II, Nordesa III, El Coral, Miramar, Casa España, Costa Caribe, El Invi de la Sánchez, Velazcasas, Urb. Independencia, Res. María Josefina, Res. Gacela,