Circuito MAON104

Distribuidora EdeNorte - Provincia Valverde Mao


Mes-Año Jun14 May14 Abr14 Mar14 Feb14 Ene14 Dic13 Nov13 Oct13 Sep13 Ago13 Jul13
Clasificación A A A A A A A A A A A A
Clientes 5270 5250 5232 4719 4733 4730 4686 4740 4744 4727 4740 4717
% Nivel Cobranza 83.35% 91.95% 95.36% 105.31% 85.73% 86.94% 104.31% 92.82% 110.65% 88.25% 99.52% 111.70%
% Nivel Pérdida 14.60% 14.86% 19.44% 17.00% 4.02% 10.60% 8.08% 10.61% 16.54% 3.98% 12.02% 12.58%
Energía Suministrada (GWh) 2.29 2.18 2.15 1.83 1.58 1.65 1.68 1.78 1.88 1.8 1.93 1.86
Energía Facturada (GWh) 1.96 1.85 1.73 1.52 1.52 1.48 1.55 1.59 1.57 1.73 1.7 1.62
Energía Cobrada (GWh) 1.63 1.7 1.65 1.6 1.3 1.29 1.61 1.48 1.73 1.53 1.69 1.81
% Servicio 99.03% 99.87% 99.87% 99.36% 99.39% 99.15% 100.00% 100.00% 99.07% 98.07% 97.77% 98.35%
% Sin Servicio 0.97% 0.13% 0.13% 0.64% 0.61% 0.85% 0.00% 0.00% 0.93% 1.93% 2.23% 1.65%
Interrupción Programada (Hrs) 5.00 5.00 0.00 4.00 0.00 0.00 0.00 0.00 6.00 20.00 16.00 0.00
Interrupción Ejecutada (Hrs) 7.07 0.95 0.97 4.67 4.42 6.22 0.00 0.00 6.78 14.08 16.27 12.07
Promedio Interrupción Diarias (Hrs) 0.23 0.03 0.03 0.15 0.15 0.20 0.00 0.00 0.22 0.46 0.53 0.40
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Pueblo de Mao (Parcial), Barrio Militar, El Hatico, Los Cambrones, El Puente,Yerba de Guinea, El Rincón, Bo. Las Flores de Esperanza.