Circuito MAON102BMA

Distribuidora EdeNorte - Provincia Valverde Mao


Mes-Año Jul20 Jun20 May20 Abr20 Mar20 Feb20 Ene20 Dic19 Nov19 Oct19 Sep19 Ago19
Clasificación C C C C C C C C C C C C
Clientes 817 745 709 713 699 702 696 699 703 692 692 577
% Nivel Cobranza 72.41% 86.16% 98.76% 47.93% 70.64% 100.86% 87.46% 117.70% 78.83% 95.25% 87.14% 87.22%
% Nivel Pérdida 6.92% 31.18% 50.24% 47.53% 44.73% 41.38% 34.18% 44.96% 28.11% 40.87% 41.79% 45.38%
Energía Suministrada (GWh) 0.18 0.18 0.23 0.22 0.18 0.15 0.15 0.16 0.15 0.16 0.17 0.18
Energía Facturada (GWh) 0.17 0.13 0.11 0.11 0.1 0.09 0.1 0.09 0.11 0.1 0.1 0.1
Energía Cobrada (GWh) 0.12 0.11 0.11 0.05 0.07 0.09 0.09 0.1 0.08 0.09 0.09 0.08
% Servicio 99.59% 98.72% 99.61% 99.36% 91.15% 75.08% 69.69% 68.86% 65.60% 64.13% 72.30% 60.98%
% Sin Servicio 0.41% 1.28% 0.39% 0.64% 8.85% 24.92% 30.31% 31.14% 34.40% 35.87% 27.70% 39.02%
Interrupción Programada (Hrs) 0.00 0.00 0.00 0.00 72.00 173.00 234.00 235.00 223.00 260.00 199.00 270.00
Interrupción Ejecutada (Hrs) 3.02 9.32 2.83 4.70 64.63 181.89 221.26 227.29 251.09 261.87 202.22 284.83
Promedio Interrupción Diarias (Hrs) 0.10 0.31 0.09 0.15 2.12 5.98 7.27 7.47 8.26 8.61 6.65 9.36
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Boca de Mao, Los coquitos.