Circuito MAIM403

Distribuidora EdeNorte - Provincia Monseñor Nouel


Mes-Año Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24 May24
Clasificación D D D D D D D D D D A D
Clientes 1566 1566 1559 1763 1593 1593 1601 1595 1605 1595 0 1618
% Nivel Cobranza 0.00% 93.48% 82.51% 95.93% 93.01% 0.27% 84.46% 93.95% 78.24% 85.43% 91.84% 91.74%
% Nivel Pérdida 0.00% 78.35% 72.37% 76.28% 76.88% 74.57% 82.61% 78.18% 79.80% 80.07% 81.54% 78.89%
Energía Suministrada (GWh) 0 2.21 1.75 1.89 1.96 1.91 2.53 2.05 2.35 2.29 2.32 2.1
Energía Facturada (GWh) 0 0.48 0.48 0.45 0.45 0.49 0.44 0.45 0.48 0.46 0.43 0.44
Energía Cobrada (GWh) 0 0.45 0.4 0.43 0.42 0 0.37 0.42 0.37 0.39 0.39 0.41
% Servicio 98.77% 99.01% 99.84% 97.29% 98.22% 98.88% 98.64% 96.28% 96.90% 96.89% 0.00% 98.28%
% Sin Servicio 1.23% 0.99% 0.16% 2.71% 1.78% 1.12% 1.36% 3.72% 3.10% 3.11% 0.00% 1.72%
Interrupción Programada (Hrs) 7.00 6.00 4.00 14.00 8.00 7.00 7.00 13.00 11.00 15.00 0.00 0.00
Interrupción Ejecutada (Hrs) 8.99 7.26 1.15 19.80 13.01 8.18 9.91 27.18 22.64 22.73 0.00 12.57
Promedio Interrupción Diarias (Hrs) 0.30 0.24 0.04 0.65 0.43 0.27 0.33 0.89 0.74 0.75 0.00 0.41
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Calle Duarte Con Calle San Isidro, PROL DUARTE, Barrio Venezuela, Bella Vista Calle Padre Billini, Los Parceleros, Duarte Vieja 1, Bella Vista II, Vista Hermosa, La Sabana Parcial, Carretera Hato Viejo, La Atalaya Abajo, Calizamar.