Circuito MAIM403

Distribuidora EdeNorte - Provincia Monseñor Nouel


Mes-Año Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25
Clasificación A A A A A A A A D D D D
Clientes 1597 1597 1588 1568 1567 1572 1580 1581 1583 1571 1566 1559
% Nivel Cobranza 0.00% 84.66% 85.87% 63.84% 85.26% 133.22% 101.16% 78.89% 101.31% 84.78% 93.48% 82.51%
% Nivel Pérdida 0.00% 76.47% 79.03% 82.72% 82.36% 82.10% 81.10% 75.40% 79.11% 74.50% 78.35% 72.37%
Energía Suministrada (GWh) 0 1.9 2 2.28 2.4 2.53 2.38 2.23 2.27 1.98 2.21 1.75
Energía Facturada (GWh) 0 0.45 0.42 0.39 0.42 0.45 0.45 0.55 0.47 0.51 0.48 0.48
Energía Cobrada (GWh) 0 0.38 0.36 0.25 0.36 0.6 0.46 0.43 0.48 0.43 0.45 0.4
% Servicio 99.72% 98.86% 96.67% 96.80% 95.14% 94.79% 97.88% 98.11% 97.78% 98.77% 99.01% 99.84%
% Sin Servicio 0.28% 1.14% 3.33% 3.20% 4.86% 5.21% 2.12% 1.89% 2.22% 1.23% 0.99% 0.16%
Interrupción Programada (Hrs) 4.00 0.00 7.00 5.00 0.00 18.00 0.00 5.00 10.00 7.00 6.00 4.00
Interrupción Ejecutada (Hrs) 2.00 8.49 24.32 23.39 35.51 38.02 15.50 13.80 16.24 8.99 7.26 1.15
Promedio Interrupción Diarias (Hrs) 0.07 0.28 0.80 0.77 1.17 1.25 0.51 0.45 0.53 0.30 0.24 0.04
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Calle Duarte Con Calle San Isidro, PROL DUARTE, Barrio Venezuela, Bella Vista Calle Padre Billini, Los Parceleros, Duarte Vieja 1, Bella Vista II, Vista Hermosa, La Sabana Parcial, Carretera Hato Viejo, La Atalaya Abajo, Calizamar.