| Mes-Año | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 | Jul25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | A | A | A | A | A | A | A | A | A | A | A | A |
| Clientes | 1594 | 1594 | 1603 | 1603 | 1599 | 1597 | 1597 | 1588 | 1568 | 1567 | 1572 | 1580 |
| % Nivel Cobranza | 0.00% | 98.81% | 76.57% | 82.32% | 103.71% | 87.42% | 84.66% | 85.87% | 63.84% | 85.26% | 133.22% | 101.16% |
| % Nivel Pérdida | 0.00% | 80.29% | 76.57% | 74.66% | 75.40% | 75.08% | 76.47% | 79.03% | 82.72% | 82.36% | 82.10% | 81.10% |
| Energía Suministrada (GWh) | 0 | 2.43 | 2.07 | 2.01 | 1.74 | 1.88 | 1.9 | 2 | 2.28 | 2.4 | 2.53 | 2.38 |
| Energía Facturada (GWh) | 0 | 0.48 | 0.49 | 0.51 | 0.43 | 0.47 | 0.45 | 0.42 | 0.39 | 0.42 | 0.45 | 0.45 |
| Energía Cobrada (GWh) | 0 | 0.47 | 0.37 | 0.42 | 0.44 | 0.41 | 0.38 | 0.36 | 0.25 | 0.36 | 0.6 | 0.46 |
| % Servicio | 91.08% | 98.80% | 99.38% | 99.85% | 96.64% | 99.72% | 98.86% | 96.67% | 96.80% | 95.14% | 94.79% | 97.88% |
| % Sin Servicio | 8.92% | 1.20% | 0.62% | 0.15% | 3.36% | 0.28% | 1.14% | 3.33% | 3.20% | 4.86% | 5.21% | 2.12% |
| Interrupción Programada (Hrs) | 6.00 | 1.00 | 9.00 | 0.00 | 12.00 | 4.00 | 0.00 | 7.00 | 5.00 | 0.00 | 18.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 64.20 | 8.63 | 4.46 | 1.10 | 24.18 | 2.00 | 8.49 | 24.32 | 23.39 | 35.51 | 38.02 | 15.50 |
| Promedio Interrupción Diarias (Hrs) | 2.11 | 0.28 | 0.15 | 0.04 | 0.79 | 0.07 | 0.28 | 0.80 | 0.77 | 1.17 | 1.25 | 0.51 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 08/07/2026 | Programada | 14:00:00 | 19:00:00 | 5 | |
| 07/07/2026 | Ejecutada | 15:39:45 | 16:53:31 | 1.23 | FALLAS ETED, DISPARO DE LINEA TRANSMISION |
| 06/07/2026 | Ejecutada | 15:13:49 | 18:01:21 | 2.79 | SOBRECARGA DE TRANSFORMADOR |
| 03/07/2026 | Ejecutada | 13:03:41 | 15:34:19 | 2.51 | SOBRECARGA DE TRANSFORMADOR |
| 02/07/2026 | Ejecutada | 12:56:31 | 15:48:29 | 5.06 | FALLAS ETED, DISPARO DE LINEA TRANSMISION // SOBRECARGA DE TRANSFORMADOR |
| 02/07/2026 | Ejecutada | 10:38:51 | 12:50:38 | 5.06 | FALLAS ETED, DISPARO DE LINEA TRANSMISION // SOBRECARGA DE TRANSFORMADOR |
| 01/07/2026 | Ejecutada | 17:02:50 | 18:36:42 | 3.83 | CORRECTIVO EN CONDUCTOR SECUNDARIO // DISPARO DESCONOCIDO // LÍNEAS LIGADAS REDES |
| 01/07/2026 | Ejecutada | 13:34:31 | 14:19:50 | 3.83 | CORRECTIVO EN CONDUCTOR SECUNDARIO // DISPARO DESCONOCIDO // LÍNEAS LIGADAS REDES |
| 01/07/2026 | Ejecutada | 13:18:14 | 13:34:31 | 3.83 | CORRECTIVO EN CONDUCTOR SECUNDARIO // DISPARO DESCONOCIDO // LÍNEAS LIGADAS REDES |
| 01/07/2026 | Ejecutada | 13:07:48 | 13:18:14 | 3.83 | CORRECTIVO EN CONDUCTOR SECUNDARIO // DISPARO DESCONOCIDO // LÍNEAS LIGADAS REDES |
| 01/07/2026 | Ejecutada | 12:32:11 | 13:07:48 | 3.83 | CORRECTIVO EN CONDUCTOR SECUNDARIO // DISPARO DESCONOCIDO // LÍNEAS LIGADAS REDES |
| 01/07/2026 | Ejecutada | 12:23:09 | 12:32:11 | 3.83 | CORRECTIVO EN CONDUCTOR SECUNDARIO // DISPARO DESCONOCIDO // LÍNEAS LIGADAS REDES |
| 01/07/2026 | Ejecutada | 12:12:38 | 12:23:09 | 3.83 | CORRECTIVO EN CONDUCTOR SECUNDARIO // DISPARO DESCONOCIDO // LÍNEAS LIGADAS REDES |
| 01/07/2026 | Ejecutada | 11:17:02 | 11:25:30 | 3.83 | CORRECTIVO EN CONDUCTOR SECUNDARIO // DISPARO DESCONOCIDO // LÍNEAS LIGADAS REDES |