Buscar Circuitos Glosario

Circuito MAIM402

Distribuidora EdeNorte - Provincia Monseñor Nouel


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación A A A A A A A A A A A A
Clientes 1476 1476 1487 1497 1491 1486 1486 1488 1465 1466 2112 2115
% Nivel Cobranza 0.00% 77.45% 66.14% 76.79% 71.14% 70.97% 70.62% 69.34% 78.56% 79.82% 68.33% 86.49%
% Nivel Pérdida 0.00% 88.09% 85.38% 86.07% 82.52% 84.04% 84.72% 85.16% 88.01% 87.83% 88.84% 88.92%
Energía Suministrada (GWh) 0 2.72 2.31 2.2 1.92 2.11 2.06 2.22 2.54 2.64 3.83 3.72
Energía Facturada (GWh) 0 0.32 0.34 0.31 0.34 0.34 0.32 0.33 0.3 0.32 0.43 0.41
Energía Cobrada (GWh) 0 0.25 0.22 0.24 0.24 0.24 0.22 0.23 0.24 0.26 0.29 0.36
% Servicio 95.33% 98.32% 99.01% 99.83% 96.69% 99.61% 98.93% 96.54% 97.81% 88.52% 93.85% 97.58%
% Sin Servicio 4.67% 1.68% 0.99% 0.17% 3.31% 0.39% 1.07% 3.46% 2.19% 11.48% 6.15% 2.42%
Interrupción Programada (Hrs) 6.00 1.00 5.00 0.00 12.00 4.00 0.00 7.00 0.00 12.00 18.00 5.00
Interrupción Ejecutada (Hrs) 33.59 12.09 7.12 1.19 23.84 2.80 7.97 25.29 15.96 83.83 44.86 17.69
Promedio Interrupción Diarias (Hrs) 1.10 0.40 0.23 0.04 0.78 0.09 0.26 0.83 0.52 2.76 1.47 0.58
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito MAIM402
Interrupciones Programadas 6
Interrupciones Ejecutadas 35.16
% Ejecución Operativa 586.00%
Detalle de Salidas - Circuito MAIM402
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
08/07/2026 Programada 13:00:00 19:00:00 6 FACILITAR TRABAJO A TERCERO
08/07/2026 Ejecutada 13:28:12 17:06:28 3.64 FACILITAR TRABAJO A TERCERO
07/07/2026 Ejecutada 15:39:42 16:53:35 1.23 FALLAS ETED, DISPARO DE LINEA TRANSMISION
03/07/2026 Ejecutada 18:21:32 20:39:05 2.66 CORRECTIVO EN CONDUCTOR DE FASE // SOBRECARGA DE TRANSFORMADOR
03/07/2026 Ejecutada 00:00:00 00:22:01 2.66 CORRECTIVO EN CONDUCTOR DE FASE // SOBRECARGA DE TRANSFORMADOR
02/07/2026 Ejecutada 22:18:53 23:59:59 4.78 APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION // SOBRECARGA DE TRANSFORMADOR
02/07/2026 Ejecutada 13:42:34 14:16:41 4.78 APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION // SOBRECARGA DE TRANSFORMADOR
02/07/2026 Ejecutada 10:38:38 12:50:23 4.78 APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION // SOBRECARGA DE TRANSFORMADOR
02/07/2026 Ejecutada 00:00:00 00:19:47 4.78 APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION // SOBRECARGA DE TRANSFORMADOR
01/07/2026 Ejecutada 23:35:45 23:59:59 1.95 APERTURA DE JUMPER DE LINEA // SOBRECARGA DE TRANSFORMADOR
01/07/2026 Ejecutada 22:01:01 23:29:27 1.95 APERTURA DE JUMPER DE LINEA // SOBRECARGA DE TRANSFORMADOR
01/07/2026 Ejecutada 14:48:53 14:53:18 1.95 APERTURA DE JUMPER DE LINEA // SOBRECARGA DE TRANSFORMADOR
Hospital Maimón, El Copey, Los Martínez, La Piñita, Carr Maimón-Cotuí (hasta La Barrick Gold), BO. El Nuevo Llagal, Casa Club Cooperativa Maimón, Centro De Cirugía Y Especialidades Médicas Maimón, TOCOA.