Buscar Circuitos Glosario

Circuito MAIM402

Distribuidora EdeNorte - Provincia Monseñor Nouel


Mes-Año Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25
Clasificación A A A A A A A A A A A A
Clientes 1480 1480 1476 1487 1497 1491 1486 1486 1488 1465 1466 2112
% Nivel Cobranza 0.00% 167.56% 77.45% 66.14% 76.79% 71.14% 70.97% 70.62% 69.34% 78.56% 79.82% 68.33%
% Nivel Pérdida 0.00% 87.48% 88.09% 85.38% 86.07% 82.52% 84.04% 84.72% 85.16% 88.01% 87.83% 88.84%
Energía Suministrada (GWh) 0 2.77 2.72 2.31 2.2 1.92 2.11 2.06 2.22 2.54 2.64 3.83
Energía Facturada (GWh) 0 0.35 0.32 0.34 0.31 0.34 0.34 0.32 0.33 0.3 0.32 0.43
Energía Cobrada (GWh) 0 0.58 0.25 0.22 0.24 0.24 0.24 0.22 0.23 0.24 0.26 0.29
% Servicio 84.21% 95.33% 98.32% 99.01% 99.83% 96.69% 99.61% 98.93% 96.54% 97.81% 88.52% 93.85%
% Sin Servicio 15.79% 4.67% 1.68% 0.99% 0.17% 3.31% 0.39% 1.07% 3.46% 2.19% 11.48% 6.15%
Interrupción Programada (Hrs) 25.00 6.00 1.00 5.00 0.00 12.00 4.00 0.00 7.00 0.00 12.00 18.00
Interrupción Ejecutada (Hrs) 113.68 33.59 12.09 7.12 1.19 23.84 2.80 7.97 25.29 15.96 83.83 44.86
Promedio Interrupción Diarias (Hrs) 3.74 1.10 0.40 0.23 0.04 0.78 0.09 0.26 0.83 0.52 2.76 1.47
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito MAIM402
Interrupciones Programadas 0
Interrupciones Ejecutadas 27.33
% Ejecución Operativa 0%
Detalle de Salidas - Circuito MAIM402
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
20/08/2026 Ejecutada 17:55:25 18:00:09 0.38 MANTENIMIENTO REDES // SOBRECARGA DE TRANSFORMADOR
20/08/2026 Ejecutada 11:01:50 11:19:57 0.38 MANTENIMIENTO REDES // SOBRECARGA DE TRANSFORMADOR
19/08/2026 Ejecutada 22:50:24 23:59:59 3.58 DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PREVENTIVO EN CONDUCTOR DE FASE
19/08/2026 Ejecutada 20:56:14 21:00:31 3.58 DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PREVENTIVO EN CONDUCTOR DE FASE
19/08/2026 Ejecutada 20:25:57 20:29:59 3.58 DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PREVENTIVO EN CONDUCTOR DE FASE
19/08/2026 Ejecutada 17:16:36 19:29:27 3.58 DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PREVENTIVO EN CONDUCTOR DE FASE
19/08/2026 Ejecutada 11:08:53 11:12:48 3.58 DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PREVENTIVO EN CONDUCTOR DE FASE
18/08/2026 Ejecutada 17:55:58 18:05:13 0.36 PREVENTIVO EN CONDUCTOR DE FASE
18/08/2026 Ejecutada 13:16:52 13:28:54 0.36 PREVENTIVO EN CONDUCTOR DE FASE
14/08/2026 Ejecutada 20:35:19 22:06:40 2.65 APERTURA DE LINEA DE TRANSMISION // SOBRECARGA DE TRANSFORMADOR
14/08/2026 Ejecutada 18:58:17 19:06:52 2.65 APERTURA DE LINEA DE TRANSMISION // SOBRECARGA DE TRANSFORMADOR
14/08/2026 Ejecutada 13:02:55 14:01:47 2.65 APERTURA DE LINEA DE TRANSMISION // SOBRECARGA DE TRANSFORMADOR
Hospital Maimón, El Copey, Los Martínez, La Piñita, Carr Maimón-Cotuí (hasta La Barrick Gold), BO. El Nuevo Llagal, Casa Club Cooperativa Maimón, Centro De Cirugía Y Especialidades Médicas Maimón.