| Mes-Año | Jul26 | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | A | A | A | A | A | A | A | A | A | A | A | A |
| Clientes | 1480 | 1480 | 1476 | 1487 | 1497 | 1491 | 1486 | 1486 | 1488 | 1465 | 1466 | 2112 |
| % Nivel Cobranza | 0.00% | 167.56% | 77.45% | 66.14% | 76.79% | 71.14% | 70.97% | 70.62% | 69.34% | 78.56% | 79.82% | 68.33% |
| % Nivel Pérdida | 0.00% | 87.48% | 88.09% | 85.38% | 86.07% | 82.52% | 84.04% | 84.72% | 85.16% | 88.01% | 87.83% | 88.84% |
| Energía Suministrada (GWh) | 0 | 2.77 | 2.72 | 2.31 | 2.2 | 1.92 | 2.11 | 2.06 | 2.22 | 2.54 | 2.64 | 3.83 |
| Energía Facturada (GWh) | 0 | 0.35 | 0.32 | 0.34 | 0.31 | 0.34 | 0.34 | 0.32 | 0.33 | 0.3 | 0.32 | 0.43 |
| Energía Cobrada (GWh) | 0 | 0.58 | 0.25 | 0.22 | 0.24 | 0.24 | 0.24 | 0.22 | 0.23 | 0.24 | 0.26 | 0.29 |
| % Servicio | 84.21% | 95.33% | 98.32% | 99.01% | 99.83% | 96.69% | 99.61% | 98.93% | 96.54% | 97.81% | 88.52% | 93.85% |
| % Sin Servicio | 15.79% | 4.67% | 1.68% | 0.99% | 0.17% | 3.31% | 0.39% | 1.07% | 3.46% | 2.19% | 11.48% | 6.15% |
| Interrupción Programada (Hrs) | 25.00 | 6.00 | 1.00 | 5.00 | 0.00 | 12.00 | 4.00 | 0.00 | 7.00 | 0.00 | 12.00 | 18.00 |
| Interrupción Ejecutada (Hrs) | 113.68 | 33.59 | 12.09 | 7.12 | 1.19 | 23.84 | 2.80 | 7.97 | 25.29 | 15.96 | 83.83 | 44.86 |
| Promedio Interrupción Diarias (Hrs) | 3.74 | 1.10 | 0.40 | 0.23 | 0.04 | 0.78 | 0.09 | 0.26 | 0.83 | 0.52 | 2.76 | 1.47 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 20/08/2026 | Ejecutada | 17:55:25 | 18:00:09 | 0.38 | MANTENIMIENTO REDES // SOBRECARGA DE TRANSFORMADOR |
| 20/08/2026 | Ejecutada | 11:01:50 | 11:19:57 | 0.38 | MANTENIMIENTO REDES // SOBRECARGA DE TRANSFORMADOR |
| 19/08/2026 | Ejecutada | 22:50:24 | 23:59:59 | 3.58 | DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PREVENTIVO EN CONDUCTOR DE FASE |
| 19/08/2026 | Ejecutada | 20:56:14 | 21:00:31 | 3.58 | DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PREVENTIVO EN CONDUCTOR DE FASE |
| 19/08/2026 | Ejecutada | 20:25:57 | 20:29:59 | 3.58 | DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PREVENTIVO EN CONDUCTOR DE FASE |
| 19/08/2026 | Ejecutada | 17:16:36 | 19:29:27 | 3.58 | DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PREVENTIVO EN CONDUCTOR DE FASE |
| 19/08/2026 | Ejecutada | 11:08:53 | 11:12:48 | 3.58 | DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PREVENTIVO EN CONDUCTOR DE FASE |
| 18/08/2026 | Ejecutada | 17:55:58 | 18:05:13 | 0.36 | PREVENTIVO EN CONDUCTOR DE FASE |
| 18/08/2026 | Ejecutada | 13:16:52 | 13:28:54 | 0.36 | PREVENTIVO EN CONDUCTOR DE FASE |
| 14/08/2026 | Ejecutada | 20:35:19 | 22:06:40 | 2.65 | APERTURA DE LINEA DE TRANSMISION // SOBRECARGA DE TRANSFORMADOR |
| 14/08/2026 | Ejecutada | 18:58:17 | 19:06:52 | 2.65 | APERTURA DE LINEA DE TRANSMISION // SOBRECARGA DE TRANSFORMADOR |
| 14/08/2026 | Ejecutada | 13:02:55 | 14:01:47 | 2.65 | APERTURA DE LINEA DE TRANSMISION // SOBRECARGA DE TRANSFORMADOR |