Circuito MAIM401

Distribuidora EdeNorte - Provincia Monseñor Nouel


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación A A A A A A A A A A A A
Clientes 1766 1766 1776 1778 1769 1762 1762 1757 1741 1741 1748 1758
% Nivel Cobranza 0.00% 95.70% 85.70% 103.09% 92.48% 89.70% 98.80% 89.78% 99.77% 92.76% 86.05% 105.18%
% Nivel Pérdida 0.00% 84.87% 82.14% 82.81% 79.83% 81.17% 81.66% 82.19% 84.09% 85.12% 86.29% 85.31%
Energía Suministrada (GWh) 0 2.48 2.09 2.01 1.76 1.94 1.92 2.04 2.33 2.56 2.69 2.49
Energía Facturada (GWh) 0 0.38 0.37 0.35 0.36 0.37 0.35 0.36 0.37 0.38 0.37 0.37
Energía Cobrada (GWh) 0 0.36 0.32 0.36 0.33 0.33 0.35 0.33 0.37 0.35 0.32 0.39
% Servicio 93.51% 98.88% 99.21% 99.86% 96.73% 99.37% 98.40% 96.94% 98.05% 95.10% 96.34% 97.39%
% Sin Servicio 6.49% 1.12% 0.79% 0.14% 3.27% 0.63% 1.60% 3.06% 1.95% 4.90% 3.66% 2.61%
Interrupción Programada (Hrs) 6.00 1.00 5.00 0.00 12.00 4.00 0.00 7.00 6.00 0.00 18.00 6.00
Interrupción Ejecutada (Hrs) 46.70 8.04 5.70 0.99 23.56 4.55 11.93 22.37 14.20 35.80 26.72 19.02
Promedio Interrupción Diarias (Hrs) 1.54 0.26 0.19 0.03 0.77 0.15 0.39 0.74 0.47 1.18 0.88 0.63
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito MAIM401
Interrupciones Programadas 5
Interrupciones Ejecutadas 39.33
% Ejecución Operativa 786.60%
Detalle de Salidas - Circuito MAIM401
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
08/07/2026 Programada 14:00:00 19:00:00 5
07/07/2026 Ejecutada 15:39:40 16:53:43 1.23 FALLAS ETED, DISPARO DE LINEA TRANSMISION
04/07/2026 Ejecutada 15:54:31 15:57:39 0.28 ARBOLES Y RAMA SOBRE LINEA
04/07/2026 Ejecutada 09:20:43 09:34:35 0.28 ARBOLES Y RAMA SOBRE LINEA
03/07/2026 Ejecutada 17:25:24 20:15:21 3.48 CAUSA DESCONOCIDA
03/07/2026 Ejecutada 17:18:51 17:24:45 3.48 CAUSA DESCONOCIDA
03/07/2026 Ejecutada 16:35:43 17:05:10 3.48 CAUSA DESCONOCIDA
03/07/2026 Ejecutada 16:31:56 16:35:14 3.48 CAUSA DESCONOCIDA
02/07/2026 Ejecutada 21:07:27 22:19:05 5.25 APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION // SOBRECARGA DE TRANSFORMADOR
02/07/2026 Ejecutada 19:43:57 21:01:24 5.25 APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION // SOBRECARGA DE TRANSFORMADOR
02/07/2026 Ejecutada 13:42:27 14:16:40 5.25 APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION // SOBRECARGA DE TRANSFORMADOR
02/07/2026 Ejecutada 10:38:32 12:50:13 5.25 APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION // SOBRECARGA DE TRANSFORMADOR
01/07/2026 Ejecutada 19:18:05 21:55:31 2.62 SOBRECARGA DE TRANSFORMADOR
Centro Ciudad de Maimón, Puerto Rico, Venezuela, Bella Vista, El Batey Angelita, Carretera a Piedra Blanca, Loma Mala.