Circuito LVPE102LCU
Distribuidora EdeNorte - Provincia La Vega
| Mes-Año | Sep26 | Ago26 | Jul26 | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | D | D | D | D | D | D | D | D | D | D | D | D |
| Clientes | 263 | 263 | 262 | 262 | 262 | 262 | 264 | 261 | 256 | 234 | 236 | 237 |
| % Nivel Cobranza | 0.00% | 74.82% | 88.63% | 77.30% | 81.21% | 86.52% | 97.37% | 82.59% | 84.99% | 115.00% | 74.86% | 84.37% |
| % Nivel Pérdida | 0.00% | 80.63% | 81.41% | 79.53% | 79.84% | 79.45% | 80.17% | 76.65% | 78.61% | 83.15% | 81.09% | 57.70% |
| Energía Suministrada (GWh) | 0 | 0.29 | 0.27 | 0.25 | 0.22 | 0.18 | 0.19 | 0.18 | 0.19 | 0.2 | 0.2 | 0.09 |
| Energía Facturada (GWh) | 0 | 0.06 | 0.05 | 0.05 | 0.04 | 0.04 | 0.04 | 0.04 | 0.04 | 0.03 | 0.04 | 0.04 |
| Energía Cobrada (GWh) | 0 | 0.04 | 0.04 | 0.04 | 0.04 | 0.03 | 0.04 | 0.03 | 0.03 | 0.04 | 0.03 | 0.03 |
| % Servicio | 98.07% | 97.19% | 95.08% | 96.01% | 95.29% | 94.98% | 98.78% | 97.28% | 99.85% | 99.66% | 94.92% | 96.73% |
| % Sin Servicio | 1.93% | 2.81% | 4.92% | 3.99% | 4.71% | 5.02% | 1.22% | 2.72% | 0.15% | 0.34% | 5.08% | 3.27% |
| Interrupción Programada (Hrs) | 0.00 | 60.00 | 60.00 | 56.00 | 65.00 | 38.00 | 6.00 | 12.00 | 5.00 | 0.00 | 38.00 | 14.00 |
| Interrupción Ejecutada (Hrs) | 13.89 | 20.22 | 35.39 | 28.74 | 33.93 | 36.15 | 8.81 | 19.60 | 1.11 | 2.53 | 37.11 | 23.90 |
| Promedio Interrupción Diarias (Hrs) | 0.46 | 0.66 | 1.16 | 0.94 | 1.12 | 1.19 | 0.29 | 0.64 | 0.04 | 0.08 | 1.22 | 0.79 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 20/10/2026 | Ejecutada | 09:41:12 | 10:24:21 | 10 | DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION |
| 20/10/2026 | Ejecutada | 00:00:00 | 09:16:44 | 10 | DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION |
| 19/10/2026 | Ejecutada | 19:45:37 | 19:50:17 | 0.08 | DISPARO DESCONOCIDO |
| 18/10/2026 | Ejecutada | 03:06:34 | 03:10:49 | 0.07 | DISPARO DESCONOCIDO |
| 17/10/2026 | Ejecutada | 22:56:26 | 23:00:32 | 2.16 | DISPARO CON REENGANCHE // DISPARO DESCONOCIDO // SUSTITUCION TRANSFORMADOR MT |
| 17/10/2026 | Ejecutada | 19:22:33 | 19:26:48 | 2.16 | DISPARO CON REENGANCHE // DISPARO DESCONOCIDO // SUSTITUCION TRANSFORMADOR MT |
| 17/10/2026 | Ejecutada | 00:00:00 | 02:01:07 | 2.16 | DISPARO CON REENGANCHE // DISPARO DESCONOCIDO // SUSTITUCION TRANSFORMADOR MT |
| 15/10/2026 | Ejecutada | 14:51:29 | 14:55:41 | 0.07 | DISPARO DESCONOCIDO |
| 14/10/2026 | Ejecutada | 08:40:10 | 08:43:29 | 0.3 | APERTURA/CIERRE DE CIRCUITO PARA PRUEBA DE EQUIPO // CORRECTIVO EN CONDUCTOR DE FASE // DISPARO DESCONOCIDO |
| 14/10/2026 | Ejecutada | 00:34:23 | 00:45:13 | 0.3 | APERTURA/CIERRE DE CIRCUITO PARA PRUEBA DE EQUIPO // CORRECTIVO EN CONDUCTOR DE FASE // DISPARO DESCONOCIDO |
| 14/10/2026 | Ejecutada | 00:19:20 | 00:23:20 | 0.3 | APERTURA/CIERRE DE CIRCUITO PARA PRUEBA DE EQUIPO // CORRECTIVO EN CONDUCTOR DE FASE // DISPARO DESCONOCIDO |
| 13/10/2026 | Ejecutada | 19:31:11 | 20:02:24 | 3.29 | CORRECTIVO EN CONDUCTOR DE FASE // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PERDIDA DE TENSION DE LA 12.5 |
| 13/10/2026 | Ejecutada | 18:52:41 | 19:30:12 | 3.29 | CORRECTIVO EN CONDUCTOR DE FASE // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PERDIDA DE TENSION DE LA 12.5 |
| 13/10/2026 | Ejecutada | 18:47:42 | 18:52:12 | 3.29 | CORRECTIVO EN CONDUCTOR DE FASE // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PERDIDA DE TENSION DE LA 12.5 |
| 13/10/2026 | Ejecutada | 16:43:40 | 18:47:37 | 3.29 | CORRECTIVO EN CONDUCTOR DE FASE // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PERDIDA DE TENSION DE LA 12.5 |