Circuito LVPE102LCU

Distribuidora EdeNorte - Provincia La Vega


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación D D D D D D D D D D D D
Clientes 263 263 262 262 262 262 264 261 256 234 236 237
% Nivel Cobranza 0.00% 74.82% 88.63% 77.30% 81.21% 86.52% 97.37% 82.59% 84.99% 115.00% 74.86% 84.37%
% Nivel Pérdida 0.00% 80.63% 81.41% 79.53% 79.84% 79.45% 80.17% 76.65% 78.61% 83.15% 81.09% 57.70%
Energía Suministrada (GWh) 0 0.29 0.27 0.25 0.22 0.18 0.19 0.18 0.19 0.2 0.2 0.09
Energía Facturada (GWh) 0 0.06 0.05 0.05 0.04 0.04 0.04 0.04 0.04 0.03 0.04 0.04
Energía Cobrada (GWh) 0 0.04 0.04 0.04 0.04 0.03 0.04 0.03 0.03 0.04 0.03 0.03
% Servicio 98.07% 97.19% 95.08% 96.01% 95.29% 94.98% 98.78% 97.28% 99.85% 99.66% 94.92% 96.73%
% Sin Servicio 1.93% 2.81% 4.92% 3.99% 4.71% 5.02% 1.22% 2.72% 0.15% 0.34% 5.08% 3.27%
Interrupción Programada (Hrs) 0.00 60.00 60.00 56.00 65.00 38.00 6.00 12.00 5.00 0.00 38.00 14.00
Interrupción Ejecutada (Hrs) 13.89 20.22 35.39 28.74 33.93 36.15 8.81 19.60 1.11 2.53 37.11 23.90
Promedio Interrupción Diarias (Hrs) 0.46 0.66 1.16 0.94 1.12 1.19 0.29 0.64 0.04 0.08 1.22 0.79
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito LVPE102LCU
Interrupciones Programadas 0
Interrupciones Ejecutadas 40.76
% Ejecución Operativa 0%
Detalle de Salidas - Circuito LVPE102LCU
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
20/10/2026 Ejecutada 09:41:12 10:24:21 10 DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION
20/10/2026 Ejecutada 00:00:00 09:16:44 10 DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION
19/10/2026 Ejecutada 19:45:37 19:50:17 0.08 DISPARO DESCONOCIDO
18/10/2026 Ejecutada 03:06:34 03:10:49 0.07 DISPARO DESCONOCIDO
17/10/2026 Ejecutada 22:56:26 23:00:32 2.16 DISPARO CON REENGANCHE // DISPARO DESCONOCIDO // SUSTITUCION TRANSFORMADOR MT
17/10/2026 Ejecutada 19:22:33 19:26:48 2.16 DISPARO CON REENGANCHE // DISPARO DESCONOCIDO // SUSTITUCION TRANSFORMADOR MT
17/10/2026 Ejecutada 00:00:00 02:01:07 2.16 DISPARO CON REENGANCHE // DISPARO DESCONOCIDO // SUSTITUCION TRANSFORMADOR MT
15/10/2026 Ejecutada 14:51:29 14:55:41 0.07 DISPARO DESCONOCIDO
14/10/2026 Ejecutada 08:40:10 08:43:29 0.3 APERTURA/CIERRE DE CIRCUITO PARA PRUEBA DE EQUIPO // CORRECTIVO EN CONDUCTOR DE FASE // DISPARO DESCONOCIDO
14/10/2026 Ejecutada 00:34:23 00:45:13 0.3 APERTURA/CIERRE DE CIRCUITO PARA PRUEBA DE EQUIPO // CORRECTIVO EN CONDUCTOR DE FASE // DISPARO DESCONOCIDO
14/10/2026 Ejecutada 00:19:20 00:23:20 0.3 APERTURA/CIERRE DE CIRCUITO PARA PRUEBA DE EQUIPO // CORRECTIVO EN CONDUCTOR DE FASE // DISPARO DESCONOCIDO
13/10/2026 Ejecutada 19:31:11 20:02:24 3.29 CORRECTIVO EN CONDUCTOR DE FASE // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PERDIDA DE TENSION DE LA 12.5
13/10/2026 Ejecutada 18:52:41 19:30:12 3.29 CORRECTIVO EN CONDUCTOR DE FASE // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PERDIDA DE TENSION DE LA 12.5
13/10/2026 Ejecutada 18:47:42 18:52:12 3.29 CORRECTIVO EN CONDUCTOR DE FASE // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PERDIDA DE TENSION DE LA 12.5
13/10/2026 Ejecutada 16:43:40 18:47:37 3.29 CORRECTIVO EN CONDUCTOR DE FASE // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PERDIDA DE TENSION DE LA 12.5
LA CUARENTA, CARRETERA EL TABLON, El cacerio Viejo.